1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Working on process for new Events setup - review events and enter regular events. (1hr 15mins)
4. Investigate process for next version of software project for new
customer - investigation for new process, particularly use of a proxy.
(7hrs 25mins)
This is the story of our journey from deciding to go into business to being in business for ourselves. A number of friends asked for details of the actual process, particularly any pitfalls - so that others can learn from our mistakes!
Thursday, December 31, 2015
Wednesday, December 30, 2015
Today's work on/in the business - Tues 29 December
1. Update my record of time worked. (5mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs)
4. Working on process for new Events setup - review events and enter regular events. (45mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs)
4. Working on process for new Events setup - review events and enter regular events. (45mins)
Tuesday, December 29, 2015
Today's work on/in the business - Mon 28 December
1. Update my record of time worked. (5mins)
2. Review progress made last week and ensure the schedule is right for this week. (30mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (30mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs)
2. Review progress made last week and ensure the schedule is right for this week. (30mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (30mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs)
Monday, December 28, 2015
Today's work on/in the business - Thurs 24 December
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 35mins)
Then I actually didn't work for 3 days straight! Christmas Day, Boxing Day, then the Sunday after - what a break!
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 35mins)
Then I actually didn't work for 3 days straight! Christmas Day, Boxing Day, then the Sunday after - what a break!
Thursday, December 24, 2015
Today's work on/in the business - Wed 23 December
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (9hrs)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (9hrs)
Wednesday, December 23, 2015
Today's work on/in the business - Tues 22 December
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 20mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 20mins)
Tuesday, December 22, 2015
Today's work on/in the business - Mon 21 December
1. Update my record of time worked. (5mins)
2. Review progress made last week and ensure the schedule is right for this week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (10mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 50mins)
6. New project - working on changes requested. (1hr 55mins)
2. Review progress made last week and ensure the schedule is right for this week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (10mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 50mins)
6. New project - working on changes requested. (1hr 55mins)
Monday, December 21, 2015
Today's work on/in the business - Fri 18 December
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. New project - working on changes requested. (7hrs 30mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (55mins)
2. Review progress made this week. (10mins)
3. New project - working on changes requested. (7hrs 30mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (55mins)
Friday, December 18, 2015
Today's work on/in the business - Thurs 17 December
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. New project - working on changes requested. (9hrs 15mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (35mins)
2. Review progress made this week. (10mins)
3. New project - working on changes requested. (9hrs 15mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (35mins)
Thursday, December 17, 2015
Today's work on/in the business - Wed 16 December
1. Update my record of time worked. (5mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 15mins)
4. New project - working on changes requested. (4hrs 40mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 15mins)
4. New project - working on changes requested. (4hrs 40mins)
Wednesday, December 16, 2015
Today's work on/in the business - Tues 15 December
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 20mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 20mins)
Tuesday, December 15, 2015
Today's work on/in the business - Mon 14 December
1. Update my record of time worked. (5mins)
2. Review progress made last week and ensure the schedule is right for this week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (15mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 35mins)
2. Review progress made last week and ensure the schedule is right for this week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (15mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 35mins)
Monday, December 14, 2015
Today's work on/in the business - Fri 11 December
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 25mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 25mins)
Friday, December 11, 2015
Today's work on/in the business - Thurs 10 December
1. Update my record of time worked. (5mins)
2. Review progress made this week. (30mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 50mins)
2. Review progress made this week. (30mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 50mins)
Thursday, December 10, 2015
Today's work on/in the business - Wed 9 December
1. Update my record of time worked. (5mins)
2. Review progress made this week. (20mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 45mins)
2. Review progress made this week. (20mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 45mins)
Wednesday, December 9, 2015
Today's work on/in the business - Tues 8 December
1. Update my record of time worked. (5mins)
2. Review progress made this week. (25mins)
3. Working on process for new Events setup - review events. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 35mins)
2. Review progress made this week. (25mins)
3. Working on process for new Events setup - review events. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 35mins)
Tuesday, December 8, 2015
Today's work on/in the business - Mon 7 December
1. Update my record of time worked. (5mins)
2. Review progress made this week. (5mins)
3. Working on process for new Events setup - review events. (25mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (10hrs 5mins)
2. Review progress made this week. (5mins)
3. Working on process for new Events setup - review events. (25mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (10hrs 5mins)
Monday, December 7, 2015
Today's work on/in the business - Sun 6 December
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (1hr 55mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (1hr 55mins)
Sunday, December 6, 2015
Today's work on/in the business - Sat 5 December
1. Update my record of time worked. (5mins)
2. Review progress made this week. (5mins)
3. Backup mail locally. (20mins)
4. Top up mobile broadband. (5mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (1hr 15mins)
2. Review progress made this week. (5mins)
3. Backup mail locally. (20mins)
4. Top up mobile broadband. (5mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (1hr 15mins)
Saturday, December 5, 2015
Today's work on/in the business - Fri 4 December
1. Update my record of time worked. (5mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs)
Friday, December 4, 2015
Today's work on/in the business - Thurs 3 December
1. Update my record of time worked. (5mins)
2. Review progress made this week. (15mins)
3. Working on process for new Events setup - review events. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 15mins)
5. New project - working on changes requested. (35mins)
6. Archive information to CD. (15mins)
2. Review progress made this week. (15mins)
3. Working on process for new Events setup - review events. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 15mins)
5. New project - working on changes requested. (35mins)
6. Archive information to CD. (15mins)
Thursday, December 3, 2015
Today's work on/in the business - Wed 2 December
1. Update my record of time worked. (15mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (9hrs 55mins)
4. Working on process for new Events setup - review events. (20mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (9hrs 55mins)
4. Working on process for new Events setup - review events. (20mins)
Wednesday, December 2, 2015
Today's work on/in the business - Tues 1 December
1. Update my record of time worked. (15mins)
2. Review progress made this week. (15mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (10mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 45mins)
2. Review progress made this week. (15mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (10mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 45mins)
Today's work on/in the business - Mon 30 November
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Working on process for new Events setup - review events and enter regular events. (1hr 40mins)
4. New project - working on changes requested. (25mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 15mins)
6. Archive information to CD. (2hrs 15mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Working on process for new Events setup - review events and enter regular events. (1hr 40mins)
4. New project - working on changes requested. (25mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 15mins)
6. Archive information to CD. (2hrs 15mins)
Monday, November 30, 2015
Today's work on/in the business - Fri 27 November
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy - assist new associate with setup issues. (55mins)
4. New project - working on changes requested. (2hrs 10mins)
5. Archive information to CD. (1hr 30mins)
Big gap in the middle of the day when my partner broke the chain on his bike and I had to go collect him, then (try to!) deliver the parcel he had been on his way to deliver.
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy - assist new associate with setup issues. (55mins)
4. New project - working on changes requested. (2hrs 10mins)
5. Archive information to CD. (1hr 30mins)
Big gap in the middle of the day when my partner broke the chain on his bike and I had to go collect him, then (try to!) deliver the parcel he had been on his way to deliver.
Friday, November 27, 2015
Today's work on/in the business - Thurs 26 November
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 40mins)
4. New project - working on changes requested. (3hrs)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 40mins)
4. New project - working on changes requested. (3hrs)
Thursday, November 26, 2015
Today's work on/in the business - Wed 25 November
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. New project - working on changes requested. (9hrs 5mins)
4.Copy files ready to archive off laptop. (1hr)
2. Review progress made this week. (10mins)
3. New project - working on changes requested. (9hrs 5mins)
4.Copy files ready to archive off laptop. (1hr)
Wednesday, November 25, 2015
Today's work on/in the business - Tues 24 November
1. Investigate process for next version of software project for new
customer - investigation for new process, particularly use of a proxy - meeting with new developer and update on next steps.
(5hrs 10mins)
2. New project - working on changes requested. (4hrs 5mins)
3. Update my record of time worked. (5mins)
4. Review progress made this week. (5mins)
5. Working on process for new Events setup - review events. (15mins)
2. New project - working on changes requested. (4hrs 5mins)
3. Update my record of time worked. (5mins)
4. Review progress made this week. (5mins)
5. Working on process for new Events setup - review events. (15mins)
Tuesday, November 24, 2015
Today's work on/in the business - Mon 23 November
1. Update my record of time worked. (5mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy - setup dev server. (7hrs 10mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy - setup dev server. (7hrs 10mins)
Monday, November 23, 2015
Today's work on/in the business - Sun 22 November
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (15mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (40mins)
5. New project - working on changes requested. (4hrs)
2. Review progress made this week and ensure the schedule is right for next week. (15mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (40mins)
5. New project - working on changes requested. (4hrs)
Sunday, November 22, 2015
Today's work on/in the business - Sat 21 November
1. Update my record of time worked. (5mins)
2. Review progress made this week. (5mins)
2. Review progress made this week. (5mins)
Saturday, November 21, 2015
Today's work on/in the business - Fri 20 November
1. Update my record of time worked. (10mins)
2. New project - working on changes requested. (9hrs)
3. Review progress made this week. (5mins)
4. Working on process for new Events setup - investigate possible issue with website. (50mins)
2. New project - working on changes requested. (9hrs)
3. Review progress made this week. (5mins)
4. Working on process for new Events setup - investigate possible issue with website. (50mins)
Friday, November 20, 2015
Today's work on/in the business - Thurs 19 November
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. New project - working on changes requested. (12hrs 45mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy -catch up call. (5mins)
2. Review progress made this week. (10mins)
3. New project - working on changes requested. (12hrs 45mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy -catch up call. (5mins)
Thursday, November 19, 2015
Today's work on/in the business - Wed 18 November
1. Update my record of time worked. (5mins)
2. Review progress made this week. (15mins)
3. New project - working on changes requested. (8hrs 5mins)
2. Review progress made this week. (15mins)
3. New project - working on changes requested. (8hrs 5mins)
Wednesday, November 18, 2015
Today's work on/in the business - Tues 17 November
1. Update my record of time worked. (10mins)
2. Review progress made this week. (5mins)
3. New project - working on changes requested. (8hrs 55mins)
4. Working on process for new Events setup - review events. (5mins)
2. Review progress made this week. (5mins)
3. New project - working on changes requested. (8hrs 55mins)
4. Working on process for new Events setup - review events. (5mins)
Tuesday, November 17, 2015
Today's work on/in the business - Mon 16 November
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. New project - working on changes requested. (7hrs 25mins)
2. Review progress made this week. (10mins)
3. New project - working on changes requested. (7hrs 25mins)
Monday, November 16, 2015
Today's work on/in the business - Sun 15 November
1. Update my record of time worked. (20mins)
2. New project - working on changes requested. (55mins)
3. Review progress made this week and ensure the schedule is right for next week. (15mins)
4. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
5. Backup mail locally. (10mins)
2. New project - working on changes requested. (55mins)
3. Review progress made this week and ensure the schedule is right for next week. (15mins)
4. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
5. Backup mail locally. (10mins)
Sunday, November 15, 2015
Today's work on/in the business - Sat 14 November
1. Update my record of time worked. (5mins)
2. Review progress made this week. (5mins)
3. Working on process for new Events setup - review events. (15mins)
4. New project - working on changes requested. (3hrs)
2. Review progress made this week. (5mins)
3. Working on process for new Events setup - review events. (15mins)
4. New project - working on changes requested. (3hrs)
Saturday, November 14, 2015
Today's work on/in the business - Fri 13 November
1. Update my record of time worked. (15mins)
2. Review progress made this week. (10mins)
3. New project - working on changes requested. (8hrs 35mins)
2. Review progress made this week. (10mins)
3. New project - working on changes requested. (8hrs 35mins)
Friday, November 13, 2015
Today's work on/in the business - Thurs 12 November
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. New project - working on changes requested. (9hrs 45mins)
2. Review progress made this week. (10mins)
3. New project - working on changes requested. (9hrs 45mins)
Thursday, November 12, 2015
Today's work on/in the business - Wed 11 November
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. New project - working on changes requested. (6hrs 45mins)
2. Review progress made this week. (10mins)
3. New project - working on changes requested. (6hrs 45mins)
Wednesday, November 11, 2015
Today's work on/in the business - Tues 10 November
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. New project - working on changes requested. (11hrs 5mins)
2. Review progress made this week. (10mins)
3. New project - working on changes requested. (11hrs 5mins)
Tuesday, November 10, 2015
Today's work on/in the business - Mon 9 November
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 25mins)
4. New project - working on changes requested. (2hrs 35mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 25mins)
4. New project - working on changes requested. (2hrs 35mins)
Monday, November 9, 2015
Today's work on/in the business - Sat 7 November
1. Update my record of time worked. (10mins)
2. Review progress made this week and ensure the schedule is right for next week. (25mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (10mins)
5. New project - working on changes requested. (2hrs 35mins)
2. Review progress made this week and ensure the schedule is right for next week. (25mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (10mins)
5. New project - working on changes requested. (2hrs 35mins)
Saturday, November 7, 2015
Today's work on/in the business - Fri 6 November
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. New project - working on changes requested. (5hrs 20mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (2hrs 35mins)
5. Accounting. (15mins)
2. Review progress made this week. (10mins)
3. New project - working on changes requested. (5hrs 20mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (2hrs 35mins)
5. Accounting. (15mins)
Friday, November 6, 2015
Today's work on/in the business - Thurs 5 November
1. Update my record of time worked. (10mins)
2. Review progress made this week. (20mins)
3. Working on process for new Events setup - review events. (15mins)
4. New project - working on changes requested. (7hrs 15mins)
5. Top up mobile broadband. (10mins)
2. Review progress made this week. (20mins)
3. Working on process for new Events setup - review events. (15mins)
4. New project - working on changes requested. (7hrs 15mins)
5. Top up mobile broadband. (10mins)
Thursday, November 5, 2015
Today's work on/in the business - Wed 4 November
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (2hrs 40mins)
4. Trip to help Dave with tyres for Subaru and back brake master cylinder for motorbike. (1hr 55mins)
5. New project - working on changes requested. (4hrs 10mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (2hrs 40mins)
4. Trip to help Dave with tyres for Subaru and back brake master cylinder for motorbike. (1hr 55mins)
5. New project - working on changes requested. (4hrs 10mins)
Wednesday, November 4, 2015
Today's work on/in the business - Tues 3 November
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (35mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (35mins)
Tuesday, November 3, 2015
Today's work on/in the business - Mon 2 November
1. Update my record of time worked. (15mins)
2. Review progress made last week and ensure the schedule is right for this week. (30mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (20mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy - respond to email request. (10mins)
2. Review progress made last week and ensure the schedule is right for this week. (30mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (20mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy - respond to email request. (10mins)
Monday, November 2, 2015
Today's work on/in the business - Fri 30 October
1. Update my record of time worked. (5mins)
2. Review progress made this week. (15mins)
3. Working on process for new Events setup - review events. (25mins)
4. New project - continue setup of environment on new laptop. (2hrs 10mins)
And then a weekend away volunteering for the cycling club... I took the laptop, with the intention of doing some work... but it didn't happen. 6am starts both days, long days of work, meant there was nothing left over to do work. And then when we got home, Bunty was definitely missing us and needed much cuddling and care.
2. Review progress made this week. (15mins)
3. Working on process for new Events setup - review events. (25mins)
4. New project - continue setup of environment on new laptop. (2hrs 10mins)
And then a weekend away volunteering for the cycling club... I took the laptop, with the intention of doing some work... but it didn't happen. 6am starts both days, long days of work, meant there was nothing left over to do work. And then when we got home, Bunty was definitely missing us and needed much cuddling and care.
Friday, October 30, 2015
Today's work on/in the business - Thurs 29 October
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. New project - download latest information and setup environment on new laptop. (4hrs 35mins)
4. Working on process for new Events setup - review events and enter regular events. (5mins)
And then work helping replace the other front CV joint on the car....!
2. Review progress made this week. (10mins)
3. New project - download latest information and setup environment on new laptop. (4hrs 35mins)
4. Working on process for new Events setup - review events and enter regular events. (5mins)
And then work helping replace the other front CV joint on the car....!
Thursday, October 29, 2015
Today's work on/in the business - Wed 28 October
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (1hr 15mins)
4. Working on process for new Events setup - review events and enter regular events. (1hr 50mins)
And then preparation for the safety course in the evening.
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (1hr 15mins)
4. Working on process for new Events setup - review events and enter regular events. (1hr 50mins)
And then preparation for the safety course in the evening.
Wednesday, October 28, 2015
Today's work on/in the business - Tues 27 October
1. Update my record of time worked. (5mins)
2. Review progress made this week. (15mins)
3. Working on process for new Events setup - review events. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 50mins)
2. Review progress made this week. (15mins)
3. Working on process for new Events setup - review events. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 50mins)
Tuesday, October 27, 2015
Today's work on/in the business - Mon 26 October
1. Update my record of time worked. (10mins)
2. Review progress made last week and ensure the schedule is right for this week. (15mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (10mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 15mins)
6. Working on process for new Events setup - review events. (15mins)
2. Review progress made last week and ensure the schedule is right for this week. (15mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (10mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 15mins)
6. Working on process for new Events setup - review events. (15mins)
Monday, October 26, 2015
Today's work on/in the business - Fri 23 October
1. Update my record of time worked. (10mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 45mins)
4. Working on process for new Events setup - review events. (5mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 45mins)
4. Working on process for new Events setup - review events. (5mins)
Friday, October 23, 2015
Today's work on/in the business - Thurs 22 October
1. Update my record of time worked. (5mins)
2. Review progress made this week. (5mins)
3. Working on process for new Events setup - review events. (15mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (50mins)
5. New project - look at and respond to request for information. (45mins)
2. Review progress made this week. (5mins)
3. Working on process for new Events setup - review events. (15mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (50mins)
5. New project - look at and respond to request for information. (45mins)
Thursday, October 22, 2015
Today's work on/in the business - Wed 21 October
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 20mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 20mins)
Wednesday, October 21, 2015
Today's work on/in the business - Tues 20 October
1. Update my record of time worked. (5mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 45mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 45mins)
Tuesday, October 20, 2015
Today's work on/in the business - Mon 19 October
1. Update my record of time worked. (5mins)
2. Review progress made this week. (5mins)
3. Working on process for new Events setup - review events and check memberships. (30mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 50mins)
2. Review progress made this week. (5mins)
3. Working on process for new Events setup - review events and check memberships. (30mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 50mins)
Monday, October 19, 2015
Today's work on/in the business - Sun 18 October
1. Update my record of time worked. (10mins)
2. Review progress made this week. (5mins)
3. Determine whether we met the KPIs (Key Performance Indicators) for August 2015. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise (although that is improving now) and we need to work on contacting new prospects too (still). Sadly, networking also lost out again like last month. (15mins)
2. Review progress made this week. (5mins)
3. Determine whether we met the KPIs (Key Performance Indicators) for August 2015. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise (although that is improving now) and we need to work on contacting new prospects too (still). Sadly, networking also lost out again like last month. (15mins)
Sunday, October 18, 2015
Today's work on/in the business - Sat 17 October
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (10mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (20mins)
5. Determine whether we met the KPIs (Key Performance Indicators) for September 2015. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise (although that is improving now) and we need to work on contacting new prospects too (still). Sadly, networking also lost out again like last month - and tomorrow I need to check August! (25mins)
2. Review progress made this week and ensure the schedule is right for next week. (10mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (20mins)
5. Determine whether we met the KPIs (Key Performance Indicators) for September 2015. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise (although that is improving now) and we need to work on contacting new prospects too (still). Sadly, networking also lost out again like last month - and tomorrow I need to check August! (25mins)
Saturday, October 17, 2015
Today's work on/in the business - Fri 16 October
1. Update my record of time worked. (5mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 50mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 50mins)
Friday, October 16, 2015
Today's work on/in the business - Thurs 15 October
1. Update my record of time worked. (5mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (9hrs 25mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (9hrs 25mins)
Thursday, October 15, 2015
Today's work on/in the business - Wed 14 October
1. Update my record of time worked. (10mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 45mins)
4. Backup mail locally. (10mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 45mins)
4. Backup mail locally. (10mins)
Wednesday, October 14, 2015
Today's work on/in the business - Tues 13 October
1. Update my record of time worked. (5mins)
2. Review progress made this week. (15mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs)
2. Review progress made this week. (15mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs)
Tuesday, October 13, 2015
Today's work on/in the business - Mon 12 October
1. Update my record of time worked. (5mins)
2. Review progress made last week and ensure the schedule is right for this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 20mins)
2. Review progress made last week and ensure the schedule is right for this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 20mins)
Monday, October 12, 2015
Today's work on/in the business - Sat 10 October
1. Update my record of time worked. (5mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 15mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 15mins)
Saturday, October 10, 2015
Today's work on/in the business - Fri 9 October
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (2hrs 45mins)
4. 3D Printing expo at Melbourne Uni. (3hrs 45mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (2hrs 45mins)
4. 3D Printing expo at Melbourne Uni. (3hrs 45mins)
Friday, October 9, 2015
Today's work on/in the business - Thurs 8 October
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 10mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 10mins)
Thursday, October 8, 2015
Today's work on/in the business - Wed 7 October
1. Update my record of time worked. (5mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 15mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 15mins)
Wednesday, October 7, 2015
Today's work on/in the business - Tues 6 October
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 55mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 55mins)
Tuesday, October 6, 2015
Today's work on/in the business - Mon 5 October
1. Update my record of time worked. (10mins)
2. Review progress made this week. (5mins)
3. Working on process for new Events setup - review events. (30mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 15mins)
2. Review progress made this week. (5mins)
3. Working on process for new Events setup - review events. (30mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 15mins)
Monday, October 5, 2015
Today's work on/in the business - Sun 4 October
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (15mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (30mins)
5. Backup mail locally. (10mins)
2. Review progress made this week and ensure the schedule is right for next week. (15mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (30mins)
5. Backup mail locally. (10mins)
Sunday, October 4, 2015
Today's work on/in the business - Fri 2 October
1. Update my record of time worked. (5mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 45mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 45mins)
Friday, October 2, 2015
Today's work on/in the business - Thurs 1 October
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Working on process for new Events setup - remove old backups, create and save a new full backup. (45mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 40mins)
2. Review progress made this week. (10mins)
3. Working on process for new Events setup - remove old backups, create and save a new full backup. (45mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 40mins)
Thursday, October 1, 2015
Today's work on/in the business - Wed 30 September
1. Update my record of time worked. (5mins)
2. Review progress made this week. (15mins)
3. Working on process for new Events setup - review events and add regular events. (55mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy, including catch up phone call. (7hrs 15mins)
2. Review progress made this week. (15mins)
3. Working on process for new Events setup - review events and add regular events. (55mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy, including catch up phone call. (7hrs 15mins)
Wednesday, September 30, 2015
Today's work on/in the business - Tues 29 September
1. Update my record of time worked. (5mins)
2. Working on process for new Events setup - review events,download existing backups, ready to clear space. (1hr)
3. Review progress made this week. (15mins)
4. Windows updates on my old laptop. (10mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 5mins)
2. Working on process for new Events setup - review events,download existing backups, ready to clear space. (1hr)
3. Review progress made this week. (15mins)
4. Windows updates on my old laptop. (10mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 5mins)
Tuesday, September 29, 2015
Today's work on/in the business - Mon 28 September
1. Update my record of time worked. (5mins)
2. Review progress made last week and ensure the schedule is right for this week. (30mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (10mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 35mins)
6. Working on process for new Events setup - review events. (1hr 25mins)
7. Accounting. (45mins)
2. Review progress made last week and ensure the schedule is right for this week. (30mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (10mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 35mins)
6. Working on process for new Events setup - review events. (1hr 25mins)
7. Accounting. (45mins)
Monday, September 28, 2015
Today's work on/in the business - Fri 25 September
1. Update my record of time worked. (5mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 35mins)
4. Working on NAS - fix password issue. (35mins)
5. Accounting. (2hrs)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 35mins)
4. Working on NAS - fix password issue. (35mins)
5. Accounting. (2hrs)
Friday, September 25, 2015
Today's work on/in the business - Thurs 24 September
1. Update my record of time worked. (5mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 55mins)
4. Working on backing up information to NAS from my old laptop. (2hrs 25mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 55mins)
4. Working on backing up information to NAS from my old laptop. (2hrs 25mins)
Thursday, September 24, 2015
Today's work on/in the business - Wed 23 September
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (9hrs 55mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (9hrs 55mins)
Wednesday, September 23, 2015
Today's work on/in the business - Tues 22 September
1. Update my record of time worked. (10mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 20mins)
4. Working on backing up information to NAS. (5hrs 45mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 20mins)
4. Working on backing up information to NAS. (5hrs 45mins)
Tuesday, September 22, 2015
Today's work on/in the business - Mon 21 September
1. Update my record of time worked. (5mins)
2. Review progress made last week and ensure the schedule is right for this week. (25mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (10mins)
5. Working on process for new Events setup - review events. (5mins)
6. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 20mins)
7. Working on backing up information to NAS. (2hrs 45mins)
2. Review progress made last week and ensure the schedule is right for this week. (25mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (10mins)
5. Working on process for new Events setup - review events. (5mins)
6. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 20mins)
7. Working on backing up information to NAS. (2hrs 45mins)
Saturday, September 19, 2015
Today's work on/in the business - Fri 18 September
1. Update my record of time worked. (5mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 25mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 25mins)
Friday, September 18, 2015
Today's work on/in the business - Thurs 17 September
1. Update my record of time worked. (5mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs)
Thursday, September 17, 2015
Today's work on/in the business - Wed 16 September
1. Update my record of time worked. (15mins)
2. Review progress made this week. (5mins)
3. Backup mail locally, including Dave's email. (45mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 50mins)
2. Review progress made this week. (5mins)
3. Backup mail locally, including Dave's email. (45mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 50mins)
Wednesday, September 16, 2015
Today's work on/in the business - Tues 15 September
1. Update my record of time worked. (25mins)
2. Review progress made this week. (10mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 20mins)
2. Review progress made this week. (10mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 20mins)
Tuesday, September 15, 2015
Today's work on/in the business - Mon 14 September
1. Update my record of time worked. (15mins)
2. Review progress made last week and ensure the schedule is right for this week. (20mins)
3. Working on process for new Events setup - review events. (45mins)
4. Investigate issues with support customer's server and internet. (2hrs 20mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs)
2. Review progress made last week and ensure the schedule is right for this week. (20mins)
3. Working on process for new Events setup - review events. (45mins)
4. Investigate issues with support customer's server and internet. (2hrs 20mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs)
Monday, September 14, 2015
Today's work on/in the business - Fri 11 September
1. Update my record of time worked. (5mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (15mins)
4. Read IT blogs. (3hrs 15mins)
5. Working on process for new Events setup - review events. (15mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (15mins)
4. Read IT blogs. (3hrs 15mins)
5. Working on process for new Events setup - review events. (15mins)
Friday, September 11, 2015
Today's work on/in the business - Thurs 10 September
1. Update my record of time worked. (5mins)
2. Review progress made this week. (25mins)
3. Windows updates on Dell laptop. (35mins)
4. Setup Thunderbird on new laptop - backup my mail. (20mins)
5. Clear space on my laptop. (1hr 35mins)
6. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (2hrs 55mins)
2. Review progress made this week. (25mins)
3. Windows updates on Dell laptop. (35mins)
4. Setup Thunderbird on new laptop - backup my mail. (20mins)
5. Clear space on my laptop. (1hr 35mins)
6. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (2hrs 55mins)
Thursday, September 10, 2015
Today's work on/in the business - Wed 9 September
1. Update my record of time worked. (10mins)
2. Review progress made this week. (15mins)
3. Working on process for new Events setup - review events. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 55mins)
2. Review progress made this week. (15mins)
3. Working on process for new Events setup - review events. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 55mins)
Wednesday, September 9, 2015
Today's work on/in the business - Tues 8 September
1. Update my record of time worked. (20mins)
2. Review progress made this week. (10mins)
3. Backup mail locally. (25mins)
4. New project - changes to front page as requested. (3hrs 20mins)
5. Working on process for new Events setup - review events. (15mins)
6. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (2hrs 45mins)
2. Review progress made this week. (10mins)
3. Backup mail locally. (25mins)
4. New project - changes to front page as requested. (3hrs 20mins)
5. Working on process for new Events setup - review events. (15mins)
6. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (2hrs 45mins)
Tuesday, September 8, 2015
Today's work on/in the business - Mon 7 September
1. Update my record of time worked. (20mins)
2. Review progress made last week and ensure the schedule is right for this week. (25mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. New project - changes to front page as requested. (4hrs 50mins)
5. Read IT blogs. (1hr 15mins)
2. Review progress made last week and ensure the schedule is right for this week. (25mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. New project - changes to front page as requested. (4hrs 50mins)
5. Read IT blogs. (1hr 15mins)
Monday, September 7, 2015
Today's work on/in the business - Sun 6 September
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 30mins)
4. Topup mobile broadband. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 30mins)
4. Topup mobile broadband. (5mins)
Saturday, September 5, 2015
Today's work on/in the business - Fri 4 September
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (10hrs)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (10hrs)
Friday, September 4, 2015
Today's work on/in the business - Thurs 3 September
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 15mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 15mins)
Thursday, September 3, 2015
Today's work on/in the business - Wed 2 September
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 5mins)
Wednesday, September 2, 2015
Today's work on/in the business - Tues 1 September
1. Update my record of time worked. (25mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy - update documentation. (1hr 45mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy - update documentation. (1hr 45mins)
Tuesday, September 1, 2015
Today's work on/in the business - Mon 31 August
1. Update my record of time worked. (15mins)
2. Review progress made this week. (10mins)
3. Working on process for new Events setup - review events. (15mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 5mins)
2. Review progress made this week. (10mins)
3. Working on process for new Events setup - review events. (15mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 5mins)
Monday, August 31, 2015
Today's work on/in the business - Sun 30 August
1. Update my record of time worked. (10mins)
2. Backup mail locally. (30mins)
3. Review progress made this week and ensure the schedule is right for next week. (25mins)
4. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
2. Backup mail locally. (30mins)
3. Review progress made this week and ensure the schedule is right for next week. (25mins)
4. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
Saturday, August 29, 2015
Today's work on/in the business - Fri 28 August
1. Update my record of time worked. (15mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (10hrs 15mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (10hrs 15mins)
Friday, August 28, 2015
Today's work on/in the business - Thurs 27 August
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 45mins)
4. Working on process for new Events setup - review events and enter regular events. (1hr 45mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 45mins)
4. Working on process for new Events setup - review events and enter regular events. (1hr 45mins)
Thursday, August 27, 2015
Today's work on/in the business - Wed 26 August
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 15mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 15mins)
Wednesday, August 26, 2015
Today's work on/in the business - Tues 25 August
1. Update my record of time worked. (5mins)
2. Review progress made last week and ensure the schedule is right for this week. (20mins)
3. Working on process for new Events setup - review events. (30mins)
4. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
5. Backup mail locally. (30mins)
6. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 15mins)
In actual fact, this is work done from Sat to Tues - with a funeral taking up most of Monday.
2. Review progress made last week and ensure the schedule is right for this week. (20mins)
3. Working on process for new Events setup - review events. (30mins)
4. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
5. Backup mail locally. (30mins)
6. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 15mins)
In actual fact, this is work done from Sat to Tues - with a funeral taking up most of Monday.
Saturday, August 22, 2015
Today's work on/in the business - Fri 21 August
1. Update my record of time worked. (30mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 45mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 45mins)
Friday, August 21, 2015
Today's work on/in the business - Thurs 20 August
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 45mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 45mins)
Thursday, August 20, 2015
Today's work on/in the business - Wed 19 August
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 20mins)
Blergh... caring and sharing should not include a head cold/cough!
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 20mins)
Blergh... caring and sharing should not include a head cold/cough!
Wednesday, August 19, 2015
Today's work on/in the business - Tues 18 August
1. Update my record of time worked. (15mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (9hrs 35mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (9hrs 35mins)
Tuesday, August 18, 2015
Today's work on/in the business - Mon 17 August
1. Backup mail locally. (30mins)
2. Update my record of time worked. (20mins)
3. Review progress made last week and ensure the schedule is right for this week. (20mins)
4. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
5. Determine whether we met the KPIs (Key Performance Indicators) for June and July 2015. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise (although that is improving now) and we need to work on contacting new prospects too (still). Sadly, networking also lost out again like last month. (15mins)
6. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 20mins)
2. Update my record of time worked. (20mins)
3. Review progress made last week and ensure the schedule is right for this week. (20mins)
4. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
5. Determine whether we met the KPIs (Key Performance Indicators) for June and July 2015. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise (although that is improving now) and we need to work on contacting new prospects too (still). Sadly, networking also lost out again like last month. (15mins)
6. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 20mins)
Saturday, August 15, 2015
Today's work on/in the business - Fri 14 August
1. Update my record of time worked. (15mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (15mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (15mins)
Friday, August 14, 2015
Today's work on/in the business - Thurs 13 August
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 20mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 20mins)
Thursday, August 13, 2015
Today's work on/in the business - Wed 12 August
1. Update my record of time worked. (15mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 30mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 30mins)
Wednesday, August 12, 2015
Today's work on/in the business - Tues 11 August
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy, installation of SSL certificate and other research. (6hrs 30mins)
And then a night of music - difficult in some ways, but I'm really glad we went!
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy, installation of SSL certificate and other research. (6hrs 30mins)
And then a night of music - difficult in some ways, but I'm really glad we went!
Tuesday, August 11, 2015
Today's work on/in the business - Mon 10 August
1. Update my record of time worked. (5mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 40mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 40mins)
Monday, August 10, 2015
Today's work on/in the business - Sun 9 August
1. Top up mobile phone. (5mins)
2. Update my record of time worked. (10mins)
3. Review progress made this week. (10mins)
2. Update my record of time worked. (10mins)
3. Review progress made this week. (10mins)
Sunday, August 9, 2015
Today's work on/in the business - Sat 8 August
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (30mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (30mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
Saturday, August 8, 2015
Today's work on/in the business - Fri 7 August
1. Update my record of time worked. (15mins)
2. Review progress made this week. (20mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 20mins)
4.Top up mobile broadband. (5mins)
5. Backup mail locally. (20mins)
6. Working on process for new Events setup - review events. (15mins)
7. Working on clearing space on my old laptop. (1hr 5mins)
2. Review progress made this week. (20mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 20mins)
4.Top up mobile broadband. (5mins)
5. Backup mail locally. (20mins)
6. Working on process for new Events setup - review events. (15mins)
7. Working on clearing space on my old laptop. (1hr 5mins)
Friday, August 7, 2015
Today's work on/in the business - Thurs 6 August
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Working on clearing space on my old laptop. (1hr 35mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 45mins)
2. Review progress made this week. (10mins)
3. Working on clearing space on my old laptop. (1hr 35mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 45mins)
Thursday, August 6, 2015
Today's work on/in the business - Wed 5 August
1. Update my record of time worked. (15mins)
2. Review progress made this week. (10mins)
3. Working on process for new Events setup - review events. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 25mins)
2. Review progress made this week. (10mins)
3. Working on process for new Events setup - review events. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 25mins)
Wednesday, August 5, 2015
Today's work on/in the business - Tues 4 August
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 20mins)
4. Accounting. (10mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 20mins)
4. Accounting. (10mins)
Tuesday, August 4, 2015
Today's work on/in the business - Mon 3 August
1. Update my record of time worked. (20mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 10mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 10mins)
Monday, August 3, 2015
Today's work on/in the business - Sun 2 August
1. Update my record of time worked. (20mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
Sunday, August 2, 2015
Today's work on/in the business - Sat 1 August
1. Update my record of time worked. (15mins)
2. Review progress made this week. (5mins)
3. Backup mail locally. (30mins)
4. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 30mins)
2. Review progress made this week. (5mins)
3. Backup mail locally. (30mins)
4. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 30mins)
Saturday, August 1, 2015
Today's work on/in the business - Fri 31 July
1. Update my record of time worked. (10mins)
2. Review progress made this week. (5mins)
3. Working on process for new Events setup - review events. (15mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 50mins)
2. Review progress made this week. (5mins)
3. Working on process for new Events setup - review events. (15mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 50mins)
Friday, July 31, 2015
Today's work on/in the business - Thurs 30 July
1. Investigate process for next version of software project for new
customer - investigation for new process, particularly use of a proxy - includes meeting with representative of the other software provider.
(7hrs 30mins)
2. Update my record of time worked. (25mins)
3. Review progress made this week. (15mins)
2. Update my record of time worked. (25mins)
3. Review progress made this week. (15mins)
Thursday, July 30, 2015
Today's work on/in the business - Wed 29 July
1. Update my record of time worked. (10mins)
2. Review progress made this week. (35mins)
3. Working on process for new Events setup - review events and enter regular events. (1hr 40mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 35mins)
2. Review progress made this week. (35mins)
3. Working on process for new Events setup - review events and enter regular events. (1hr 40mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 35mins)
Wednesday, July 29, 2015
Today's work on/in the business - Tues 28 July
1. Update my record of time worked. (5mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 35mins)
4. Working on process for new Events setup - review events. (10mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 35mins)
4. Working on process for new Events setup - review events. (10mins)
Tuesday, July 28, 2015
Today's work on/in the business - Mon 27 July
1. Update my record of time worked. (10mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 35mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 35mins)
Monday, July 27, 2015
Today's work on/in the business - Sun 26 July
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 5mins)
Sunday, July 26, 2015
Today's work on/in the business - Sat 25 July
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (15mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 40mins)
2. Review progress made this week and ensure the schedule is right for next week. (15mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 40mins)
Saturday, July 25, 2015
Today's work on/in the business - Fri 24 July
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs)
Friday, July 24, 2015
Today's work on/in the business - Thurs 23 July
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Accounting. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (9hrs)
2. Review progress made this week. (10mins)
3. Accounting. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (9hrs)
Thursday, July 23, 2015
Today's work on/in the business - Wed 22 July
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (9hrs 25mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (9hrs 25mins)
Wednesday, July 22, 2015
Today's work on/in the business - Tues 21 July
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs)
Tuesday, July 21, 2015
Today's work on/in the business - Mon 20 July
1. Update my record of time worked. (15mins)
2. Review progress made this week. (20mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs)
2. Review progress made this week. (20mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs)
Monday, July 20, 2015
Today's work on/in the business - Sun 19 July
1. Update my record of time worked. (10mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (30mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (30mins)
Sunday, July 19, 2015
Today's work on/in the business - Fri 17 July
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Working on process for new Events setup - review events. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 5mins)
5. Install updates on my laptop. (15mins)
2. Review progress made this week. (10mins)
3. Working on process for new Events setup - review events. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 5mins)
5. Install updates on my laptop. (15mins)
Friday, July 17, 2015
Today's work on/in the business - Thurs 16 July
1. Update my record of time worked. (10mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (9hrs 10mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (9hrs 10mins)
Thursday, July 16, 2015
Today's work on/in the business - Wed 15 July
1. Update my record of time worked. (10mins)
2. Review progress made this week. (20mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 5mins)
4. New project - reply to email. (10mins)
5. Accounting - fix one entry. (25mins)
2. Review progress made this week. (20mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 5mins)
4. New project - reply to email. (10mins)
5. Accounting - fix one entry. (25mins)
Wednesday, July 15, 2015
Today's work on/in the business - Tues 14 July
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Working on process for new Events setup - review events. (15mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 35mins)
5. Accounting - record more entries. (30mins)
6. New project - changes to one page as requested. (1hr 15mins)
2. Review progress made this week. (10mins)
3. Working on process for new Events setup - review events. (15mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 35mins)
5. Accounting - record more entries. (30mins)
6. New project - changes to one page as requested. (1hr 15mins)
Tuesday, July 14, 2015
Today's work on/in the business - Mon 13 July
1. Update my record of time worked. (25mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 45mins)
4. Invoice reconciliation - prepare updated invoices. (1hr 50mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 45mins)
4. Invoice reconciliation - prepare updated invoices. (1hr 50mins)
Monday, July 13, 2015
Today's work on/in the business - Sun 12 July
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (15mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (30mins)
2. Review progress made this week and ensure the schedule is right for next week. (15mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (30mins)
Sunday, July 12, 2015
Today's work on/in the business - Fri 10 July
1. Update my record of time worked. (5mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs)
Friday, July 10, 2015
Today's work on/in the business - Thurs 9 July
1. Update my record of time worked. (5mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 5mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 5mins)
Thursday, July 9, 2015
Today's work on/in the business - Wed 8 July
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 55mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 55mins)
Wednesday, July 8, 2015
Today's work on/in the business - Tues 7 July
1. Update my record of time worked. (10mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 25mins)
4. Working on process for new Events setup - review events. (20mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 25mins)
4. Working on process for new Events setup - review events. (20mins)
Tuesday, July 7, 2015
Today's work on/in the business - Mon 6 July
1. Update my record of time worked. (20mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (9hrs 20mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (9hrs 20mins)
Monday, July 6, 2015
Today's work on/in the business - Sun 5 July
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (10mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (30mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs)
2. Review progress made this week and ensure the schedule is right for next week. (10mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (30mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs)
Sunday, July 5, 2015
Today's work on/in the business - Sat 4 July
1. Update my record of time worked. (10mins)
2. Review progress made this week. (20mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 40mins)
2. Review progress made this week. (20mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 40mins)
Saturday, July 4, 2015
Today's work on/in the business - Fri 3 July
1. Update my record of time worked. (5mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs)
Friday, July 3, 2015
Today's work on/in the business - Thurs 2 July
1. Update my record of time worked. (20mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 10mins)
4. Working on process for new Events setup - review events. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 10mins)
4. Working on process for new Events setup - review events. (5mins)
Thursday, July 2, 2015
Today's work on/in the business - Wed 1 July
1. Update my record of time worked. (15mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 25mins)
4. Invoicing - update one invoice. (15mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 25mins)
4. Invoicing - update one invoice. (15mins)
Wednesday, July 1, 2015
Today's work on/in the business - Tues 30 June
1. Update my record of time worked. (10mins)
2. Review progress made this week. (15mins)
3. Accounting - sign, scan and send forms for tax. (45mins)
4. Working on process for new Events setup - review events and enter regular events. (1hr 50mins)
5. Invoicing - finalise and send one invoice. (1hr)
6. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 40mins)
7. Accounting - finalise one account. (10mins)
2. Review progress made this week. (15mins)
3. Accounting - sign, scan and send forms for tax. (45mins)
4. Working on process for new Events setup - review events and enter regular events. (1hr 50mins)
5. Invoicing - finalise and send one invoice. (1hr)
6. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 40mins)
7. Accounting - finalise one account. (10mins)
Tuesday, June 30, 2015
Today's work on/in the business - Mon 29 June
1. Update my record of time worked. (5mins)
2. Review progress made this week. (5mins)
3. Invoicing - create one invoice and send to my partner for details. (20mins)
4. Determine whether we met the KPIs (Key Performance Indicators) for May 2015. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise (although that is improving now) and we need to work on contacting new prospects too (still). Sadly, networking also lost out again like last month. (15mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 50mins)
6. Accounting - prepare forms for tax. (30mins)
2. Review progress made this week. (5mins)
3. Invoicing - create one invoice and send to my partner for details. (20mins)
4. Determine whether we met the KPIs (Key Performance Indicators) for May 2015. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise (although that is improving now) and we need to work on contacting new prospects too (still). Sadly, networking also lost out again like last month. (15mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 50mins)
6. Accounting - prepare forms for tax. (30mins)
Monday, June 29, 2015
Today's work on/in the business - Sat 27 June
1. Update my record of time worked. (10mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (20mins)
5. Accounting - top up mobile phone. (25mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (20mins)
5. Accounting - top up mobile phone. (25mins)
Saturday, June 27, 2015
Today's work on/in the business - Fri 26 June
1. Update my record of time worked. (15mins)
2. Review progress made this week. (10mins)
3. Accounting - pay two bills. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 45mins)
2. Review progress made this week. (10mins)
3. Accounting - pay two bills. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 45mins)
Friday, June 26, 2015
Today's work on/in the business - Thurs 25 June
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 10mins)
4. Accounting - prepare information for accountant re tax. (1hr 55mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 10mins)
4. Accounting - prepare information for accountant re tax. (1hr 55mins)
Thursday, June 25, 2015
Today's work on/in the business - Wed 24 June
1. Update my record of time worked. (5mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 50mins)
4. Assist with work on why our server is not starting networking. (2hrs 15mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 50mins)
4. Assist with work on why our server is not starting networking. (2hrs 15mins)
Wednesday, June 24, 2015
Today's work on/in the business - Tues 23 June
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 15mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 15mins)
Tuesday, June 23, 2015
Today's work on/in the business - Mon 22 June
1. Update my record of time worked. (10mins)
2. Review progress made last week and ensure the schedule is right for this week. (15mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (30mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (9hrs 5mins)
2. Review progress made last week and ensure the schedule is right for this week. (15mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (30mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (9hrs 5mins)
Monday, June 22, 2015
Today's work on/in the business - Sat 20 June
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Invoicing - consider proposed payment plan. (5mins)
2. Review progress made this week. (10mins)
3. Invoicing - consider proposed payment plan. (5mins)
Saturday, June 20, 2015
Today's work on/in the business - Fri 19 June
1. Update my record of time worked. (10mins)
2. Review progress made this week. (20mins)
3. Invoicing - finish recording invoices created yesterday. (1hr 30mins)
2. Review progress made this week. (20mins)
3. Invoicing - finish recording invoices created yesterday. (1hr 30mins)
Friday, June 19, 2015
Today's work on/in the business - Thurs 18 June
1. Update my record of time worked. (10mins)
2. Review progress made this week. (35mins)
3. Invoicing - follow up on one outstanding account, finalise 2 invoices, create 6 invoices and 2 timesheets and send them out. (5hrs 50mins)
4. Accounting - catch up on all items directly from the account and payments received. (1hr 5mins)
5. Redirect .com.au site to .com version. (1hr 10mins)
2. Review progress made this week. (35mins)
3. Invoicing - follow up on one outstanding account, finalise 2 invoices, create 6 invoices and 2 timesheets and send them out. (5hrs 50mins)
4. Accounting - catch up on all items directly from the account and payments received. (1hr 5mins)
5. Redirect .com.au site to .com version. (1hr 10mins)
Thursday, June 18, 2015
Today's work on/in the business - Wed 17 June
1. Update my record of time worked. (25mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 55mins)
4. New project - changes to landing page. (1hr 5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 55mins)
4. New project - changes to landing page. (1hr 5mins)
Wednesday, June 17, 2015
Today's work on/in the business - Tues 16 June
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate more possibilities for prospect - look at setting up more plugins for the next part of the site, which highlighted some issues where sites are still not fully functional. (25mins)
4. New project - correspondence re access to files for css updates. (20mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 35mins)
6. Accounting - pay one bill. (5mins)
2. Review progress made this week. (10mins)
3. Investigate more possibilities for prospect - look at setting up more plugins for the next part of the site, which highlighted some issues where sites are still not fully functional. (25mins)
4. New project - correspondence re access to files for css updates. (20mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 35mins)
6. Accounting - pay one bill. (5mins)
Tuesday, June 16, 2015
Today's work on/in the business - Mon 15 June
1. Update my record of time worked. (15mins)
2. Review progress made this week. (5mins)
3. Working on process for new Events setup - review events. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (12hrs 10mins)
2. Review progress made this week. (5mins)
3. Working on process for new Events setup - review events. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (12hrs 10mins)
Monday, June 15, 2015
Today's work on/in the business - Sun 14 June
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (30mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 30mins)
6. Assist with setup of new laptop for website customer. (30mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (30mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 30mins)
6. Assist with setup of new laptop for website customer. (30mins)
Saturday, June 13, 2015
Today's work on/in the business - Fri 12 June
1. Update my record of time worked. (30mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Mostly documentation of current process and testing of current status. (7hrs 25mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Mostly documentation of current process and testing of current status. (7hrs 25mins)
Friday, June 12, 2015
Today's work on/in the business - Thurs 11 June
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Mostly documentation of current process and testing of current status. (6hrs 5mins)
4. New project - working on the next urgent change - another testing issue for the first phase. (2hrs 55mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Mostly documentation of current process and testing of current status. (6hrs 5mins)
4. New project - working on the next urgent change - another testing issue for the first phase. (2hrs 55mins)
Thursday, June 11, 2015
Today's work on/in the business - Wed 10 June
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Mostly documentation of current process and testing of current status. (10hrs 45mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Mostly documentation of current process and testing of current status. (10hrs 45mins)
Wednesday, June 10, 2015
Today's work on/in the business - Tues 9 June
1. Update my record of time worked. (15mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 45mins)
4. Working on process for new Events setup - review events. (5mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 45mins)
4. Working on process for new Events setup - review events. (5mins)
Tuesday, June 9, 2015
Today's work on/in the business - Mon 8 June
1. Update my record of time worked. (20mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 50mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 50mins)
Monday, June 8, 2015
Today's work on/in the business - Sun 7 June
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (15mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (30mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 40mins)
2. Review progress made this week and ensure the schedule is right for next week. (15mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (30mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 40mins)
Sunday, June 7, 2015
Today's work on/in the business - Sat 6 June
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 25mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 25mins)
Saturday, June 6, 2015
Today's work on/in the business - Fri 5 June
1. Update my record of time worked. (30mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 50mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 50mins)
Friday, June 5, 2015
Today's work on/in the business - Thurs 4 June
1. Update my record of time worked. (5mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs)
4. Assist with new setup for support customer. (2hrs 20mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs)
4. Assist with new setup for support customer. (2hrs 20mins)
Thursday, June 4, 2015
Today's work on/in the business - Wed 3 June
1. Update my record of time worked. (10mins)
2. Review progress made this week. (15mins)
3. Working on process for new Events setup - review events. (20mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 55mins)
2. Review progress made this week. (15mins)
3. Working on process for new Events setup - review events. (20mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 55mins)
Wednesday, June 3, 2015
Today's work on/in the business - Tues 2 June
1. Update my record of time worked. (5mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 10mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 10mins)
Tuesday, June 2, 2015
Today's work on/in the business - Mon 1 June
1. Update my record of time worked. (15mins)
2. Review progress made this week. (5mins)
3. Accounting (pay one bill). (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy, as well as a phone call to catch up on the project. (7hrs 55mins)
2. Review progress made this week. (5mins)
3. Accounting (pay one bill). (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy, as well as a phone call to catch up on the project. (7hrs 55mins)
Monday, June 1, 2015
Today's work on/in the business - Sun 31 May
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Investigate more possibilities for prospect - look at setting up more plugins for the next part of the site, which highlighted some issues where updates are needed. (3hrs 35mins)
2. Review progress made this week. (10mins)
3. Investigate more possibilities for prospect - look at setting up more plugins for the next part of the site, which highlighted some issues where updates are needed. (3hrs 35mins)
Sunday, May 31, 2015
Today's work on/in the business - Sat 30 May
1. Update my record of time worked. (10mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (10mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 25mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (10mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 25mins)
Saturday, May 30, 2015
Today's work on/in the business - Fri 29 May
1. Update my record of time worked. (10mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 20mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 20mins)
Friday, May 29, 2015
Today's work on/in the business - Thurs 28 May
1. Update my record of time worked. (10mins)
2. Review progress made this week. (20mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 15mins)
4. Working on process for new Events setup - review events and enter regular events. (2hrs 10mins)
2. Review progress made this week. (20mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 15mins)
4. Working on process for new Events setup - review events and enter regular events. (2hrs 10mins)
Thursday, May 28, 2015
Today's work on/in the business - Wed 27 May
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 35mins)
4. Backup mail locally. (10mins)
5. Working on process for new Events setup - review events. (10mins)
6. New project - working on the next set of urgent changes - another testing issue for the first phase. (3hrs 10mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 35mins)
4. Backup mail locally. (10mins)
5. Working on process for new Events setup - review events. (10mins)
6. New project - working on the next set of urgent changes - another testing issue for the first phase. (3hrs 10mins)
Wednesday, May 27, 2015
Today's work on/in the business - Tues 26 May
1. Update my record of time worked. (15mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 5mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 5mins)
Tuesday, May 26, 2015
Today's work on/in the business - Mon 25 May
1. Update my record of time worked. (10mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 15mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 15mins)
Monday, May 25, 2015
Today's work on/in the business - Sun 24 May
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
Sunday, May 24, 2015
Today's work on/in the business - Sat 23 May
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (2hrs 10mins)
4. Working on process for new Events setup - review events. (10mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (2hrs 10mins)
4. Working on process for new Events setup - review events. (10mins)
Saturday, May 23, 2015
Today's work on/in the business - Fri 22 May
1. Update my record of time worked. (5mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 45mins)
2. Review progress made this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 45mins)
Friday, May 22, 2015
Today's work on/in the business - Thurs 21 May
1. Update my record of time worked. (20mins)
2. Review progress made this week. (25mins)
3. Windows updates on the other laptop. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (9hrs 35mins)
2. Review progress made this week. (25mins)
3. Windows updates on the other laptop. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (9hrs 35mins)
Thursday, May 21, 2015
Today's work on/in the business - Wed 20 May
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3.Find and send copy of form that was not delivered to website customer. (25mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 40mins)
2. Review progress made this week. (10mins)
3.Find and send copy of form that was not delivered to website customer. (25mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 40mins)
Wednesday, May 20, 2015
Today's work on/in the business - Tues 19 May
1. Website support - locked out of site again, .htaccess file same as last night, suddenly came good, so must have been something out of our hands to do with the hosting.
(35mins)
2. Update my record of time worked. (10mins)
3. Review progress made this week. (10mins)
4. New project - working on the next set of urgent changes - another change for the first phase. (3hrs 25mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy, including working on updating website - rewrite rules for new website have broken access to the other processes. (1hr 40mins)
2. Update my record of time worked. (10mins)
3. Review progress made this week. (10mins)
4. New project - working on the next set of urgent changes - another change for the first phase. (3hrs 25mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy, including working on updating website - rewrite rules for new website have broken access to the other processes. (1hr 40mins)
Tuesday, May 19, 2015
Today's work on/in the business - Mon 18 May
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy, including working on updating website - finalised it. (8hrs 50mins)
4. Website support - locked out of site, .htaccess file had been munged again. (30mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy, including working on updating website - finalised it. (8hrs 50mins)
4. Website support - locked out of site, .htaccess file had been munged again. (30mins)
Monday, May 18, 2015
Today's work on/in the business - Sun 17 May
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (35mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy, including working on updating website. (6hrs 15mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (35mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy, including working on updating website. (6hrs 15mins)
Sunday, May 17, 2015
Today's work on/in the business - Sat 16 May
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Website support -investigate whether there is a real issue (no), fix one broken link and remove link to blog that is not updated anymore. (1hr 10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy, including working on updating website. (5hrs 5mins)
2. Review progress made this week. (10mins)
3. Website support -investigate whether there is a real issue (no), fix one broken link and remove link to blog that is not updated anymore. (1hr 10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy, including working on updating website. (5hrs 5mins)
Saturday, May 16, 2015
Today's work on/in the business - Fri 15 May
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy, including correspondence re updating website. (8hrs 5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy, including correspondence re updating website. (8hrs 5mins)
Friday, May 15, 2015
Today's work on/in the business - Thurs 14 May
1. Update my record of time worked. (15mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 50mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 50mins)
Thursday, May 14, 2015
Today's work on/in the business - Wed 13 May
1. Update my record of time worked. (10mins)
2. Review progress made this week. (20mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 55mins)
4. Investigate more possibilities for prospect - look at setting up plugins for the next part of the site, which highlighted some issues where updates are needed. (1hr 25mins)
2. Review progress made this week. (20mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 55mins)
4. Investigate more possibilities for prospect - look at setting up plugins for the next part of the site, which highlighted some issues where updates are needed. (1hr 25mins)
Wednesday, May 13, 2015
Today's work on/in the business - Tues 12 May
1. Update my record of time worked. (5mins)
2. Review progress made this week. (20mins)
3. Working on process for new Events setup - review events. (5mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 50mins)
5. New project - working on the next set of urgent changes - hopefully the final ones for the first phase. (2hrs 15mins)
2. Review progress made this week. (20mins)
3. Working on process for new Events setup - review events. (5mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 50mins)
5. New project - working on the next set of urgent changes - hopefully the final ones for the first phase. (2hrs 15mins)
Tuesday, May 12, 2015
Today's work on/in the business - Mon 11 May
1. Update my record of time worked. (55mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (30mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 55mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup mail locally. (30mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 55mins)
Monday, May 11, 2015
Today's work on/in the business - Sun 10 May
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Archive files off machines to free up space. (8hrs 20mins)
2. Review progress made this week. (10mins)
3. Archive files off machines to free up space. (8hrs 20mins)
Sunday, May 10, 2015
Today's work on/in the business - Sat 9 May
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. New project - working on the next set of urgent changes after an issue was identified. (1hr 15mins)
4.Topup mobile broadband. (10mins)
5. Windows updates on Dell laptop. (20mins)
6. Archive files off machines to free up space. (8hrs 25mins)
2. Review progress made this week. (10mins)
3. New project - working on the next set of urgent changes after an issue was identified. (1hr 15mins)
4.Topup mobile broadband. (10mins)
5. Windows updates on Dell laptop. (20mins)
6. Archive files off machines to free up space. (8hrs 25mins)
Saturday, May 9, 2015
Today's work on/in the business - Fri 8 May
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. New project - working on the next set of urgent changes after an issue was identified. (5hrs 30mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (2hrs 5mins)
2. Review progress made this week. (10mins)
3. New project - working on the next set of urgent changes after an issue was identified. (5hrs 30mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (2hrs 5mins)
Friday, May 8, 2015
Today's work on/in the business - Thurs 7 May
1. Website support -automatic upgrade process chewed the .htaccess file again - now we have a good copy up there ready to swap in if it happens again. (30mins)
2. Update my record of time worked. (5mins)
3. Review progress made this week. (15mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (35mins)
5. New project - upload latest data file. (8hrs)
2. Update my record of time worked. (5mins)
3. Review progress made this week. (15mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (35mins)
5. New project - upload latest data file. (8hrs)
Thursday, May 7, 2015
Today's work on/in the business - Wed 6 May
1. Update my record of time worked. (10mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 10mins)
4. Working on process for new Events setup - review events. (10mins)
5. Website support -review and finalise first version of document re proposal for upgrade to new website. (1hr 55mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 10mins)
4. Working on process for new Events setup - review events. (10mins)
5. Website support -review and finalise first version of document re proposal for upgrade to new website. (1hr 55mins)
Wednesday, May 6, 2015
Today's work on/in the business - Tues 5 May
1. New project - hopefully finalised the next set of urgent changes. (5mins)
2. Update my record of time worked. (10mins)
3. Review progress made this week. (20mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 15mins)
5. Website support -review document re proposal for upgrade to new website. (10mins)
6. Working on process for new Events setup - review events. (10mins)
2. Update my record of time worked. (10mins)
3. Review progress made this week. (20mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 15mins)
5. Website support -review document re proposal for upgrade to new website. (10mins)
6. Working on process for new Events setup - review events. (10mins)
Tuesday, May 5, 2015
Today's work on/in the business - Mon 4 May
1. Update my record of time worked. (10mins)
2. Review progress made this week. (5mins)
3. New project - working on the next set of urgent changes. (3hrs 45mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 45mins)
5. Working on process for new Events setup - review events. (10mins)
2. Review progress made this week. (5mins)
3. New project - working on the next set of urgent changes. (3hrs 45mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 45mins)
5. Working on process for new Events setup - review events. (10mins)
Monday, May 4, 2015
Today's work on/in the business - Sun 3 May
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Determine whether we met the KPIs (Key Performance Indicators) for March and April 2015. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise and we need to work on contacting new prospects too (still). Sadly, networking also lost out again like last month. (20mins)
5. New project - working on the next set of urgent changes. (1hr 25mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Determine whether we met the KPIs (Key Performance Indicators) for March and April 2015. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise and we need to work on contacting new prospects too (still). Sadly, networking also lost out again like last month. (20mins)
5. New project - working on the next set of urgent changes. (1hr 25mins)
Sunday, May 3, 2015
Today's work on/in the business - Sat 2 May
1. Update my record of time worked. (5mins)
2. Review progress made this week. (15mins)
3. New project - working on the next set of urgent changes. (5hrs 30mins)
2. Review progress made this week. (15mins)
3. New project - working on the next set of urgent changes. (5hrs 30mins)
Saturday, May 2, 2015
Today's work on/in the business - Fri 1 May
1. Update my record of time worked. (10mins)
2. Review progress made this week. (5mins)
3. New project - working on the next set of urgent changes. (12hrs 45mins)
2. Review progress made this week. (5mins)
3. New project - working on the next set of urgent changes. (12hrs 45mins)
Friday, May 1, 2015
Today's work on/in the business - Thurs 30 April
1. Update my record of time worked. (10mins)
2. Review progress made this week. (20mins)
3. Working on process for new Events setup - review events. (5mins)
4. New project - working on the next set of urgent changes. (9hrs 20mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (10mins)
2. Review progress made this week. (20mins)
3. Working on process for new Events setup - review events. (5mins)
4. New project - working on the next set of urgent changes. (9hrs 20mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (10mins)
Thursday, April 30, 2015
Today's work on/in the business - Wed 29 April
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Working on process for new Events setup - review events. (45mins)
4. New project - working on the next set of urgent changes. (7hrs 35mins)
2. Review progress made this week. (10mins)
3. Working on process for new Events setup - review events. (45mins)
4. New project - working on the next set of urgent changes. (7hrs 35mins)
Wednesday, April 29, 2015
Today's work on/in the business - Tues 28 April
1. Update my record of time worked. (10mins)
2. Review progress made this week. (15mins)
3. Working on process for new Events setup - review events and enter regular events. (1hr 30mins)
4. BAS - post the form. (30mins)
5. New project - working on the next set of urgent changes. (5hrs 35mins)
2. Review progress made this week. (15mins)
3. Working on process for new Events setup - review events and enter regular events. (1hr 30mins)
4. BAS - post the form. (30mins)
5. New project - working on the next set of urgent changes. (5hrs 35mins)
Tuesday, April 28, 2015
Today's work on/in the business - Mon 27 April
1. Update my record of time worked. (10mins)
2. Review progress made this week. (5mins)
3. Accounting. (30mins)
4. BAS. (40mins)
5. New project - working on the next set of urgent changes. (6hrs)
6. Working on process for new Events setup - review events. (10mins)
2. Review progress made this week. (5mins)
3. Accounting. (30mins)
4. BAS. (40mins)
5. New project - working on the next set of urgent changes. (6hrs)
6. Working on process for new Events setup - review events. (10mins)
Monday, April 27, 2015
Today's work on/in the business - Sun 26 April
1. Update my record of time worked. (10mins)
2. Working on process for new Events setup - review events. (10mins)
3. Review progress made this week. (5mins)
4. New project - working on the next set of urgent changes. (4hrs 15mins)
2. Working on process for new Events setup - review events. (10mins)
3. Review progress made this week. (5mins)
4. New project - working on the next set of urgent changes. (4hrs 15mins)
Sunday, April 26, 2015
Today's work on/in the business - Sat 25 April
1. Anti virus and malware scans on laptops, as this needs to be done
regularly to be sure they are clean - upgrade first one on my laptop.
(5mins)
2. Update my record of time worked. (5mins)
3. Review progress made this week and ensure the schedule is right for next week. (25mins)
4. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
5. Backup my mail locally. (15mins)
6. New project - working on the next set of urgent changes. (10hrs 15mins)
2. Update my record of time worked. (5mins)
3. Review progress made this week and ensure the schedule is right for next week. (25mins)
4. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
5. Backup my mail locally. (15mins)
6. New project - working on the next set of urgent changes. (10hrs 15mins)
Saturday, April 25, 2015
Today's work on/in the business - Fri 24 April
1. Investigate process for next version of software project for new
customer - investigation for new process, particularly use of a proxy - demonstration (includes travel into the city and back). (5hrs 20mins)
2. Update my record of time worked. (15mins)
3. Review progress made this week. (25mins)
4. Top up mobile phone. (5mins)
5. Working on process for new Events setup - review events. (10mins)
6. New project - working on the next set of urgent changes. (3hrs)
2. Update my record of time worked. (15mins)
3. Review progress made this week. (25mins)
4. Top up mobile phone. (5mins)
5. Working on process for new Events setup - review events. (10mins)
6. New project - working on the next set of urgent changes. (3hrs)
Friday, April 24, 2015
Today's work on/in the business - Thurs 23 April
1. Update my record of time worked. (5mins)
2. Review progress made this week. (40mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy - preparation for a demonstration. (3hrs)
4. New project - working on the next set of urgent changes. (6hrs 35mins)
5. ADSL upgrade to ADSL2+ - investigate settings, then ended up calling them - they had to make some changes on their end as well! (2hrs)
2. Review progress made this week. (40mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy - preparation for a demonstration. (3hrs)
4. New project - working on the next set of urgent changes. (6hrs 35mins)
5. ADSL upgrade to ADSL2+ - investigate settings, then ended up calling them - they had to make some changes on their end as well! (2hrs)
Thursday, April 23, 2015
Today's work on/in the business - Wed 22 April
1. Update my record of time worked. (10mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy - preparation for a demonstration. (9hrs 20mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy - preparation for a demonstration. (9hrs 20mins)
Wednesday, April 22, 2015
Today's work on/in the business - Tues 21 April
1. Update my record of time worked. (20mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy - preparation for a demonstration. (8hrs 40mins)
4. Backup my mail locally. (15mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy - preparation for a demonstration. (8hrs 40mins)
4. Backup my mail locally. (15mins)
Tuesday, April 21, 2015
Today's work on/in the business - Mon 20 April
1. Update my record of time worked. (5mins)
2. Review progress made last week and ensure the schedule is right for this week. (30mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. New project - working on the next set of urgent changes. (14hrs 10mins)
2. Review progress made last week and ensure the schedule is right for this week. (30mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. New project - working on the next set of urgent changes. (14hrs 10mins)
Monday, April 20, 2015
Today's work on/in the business - Sat 18 April
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. New project - working on the next set of urgent changes. (10hrs 40mins)
2. Review progress made this week. (10mins)
3. New project - working on the next set of urgent changes. (10hrs 40mins)
Saturday, April 18, 2015
Today's work on/in the business - Fri 17 April
1. Update my record of time worked. (10mins)
2. Review progress made this week. (15mins)
3. New project - working on the next set of urgent changes. (11hrs 15mins)
4. Website support - low on space, so downloaded older backups and deleted one (the others need checking for integrity). (50mins)
2. Review progress made this week. (15mins)
3. New project - working on the next set of urgent changes. (11hrs 15mins)
4. Website support - low on space, so downloaded older backups and deleted one (the others need checking for integrity). (50mins)
Friday, April 17, 2015
Today's work on/in the business - Thurs 16 April
1. Update my record of time worked. (20mins)
2. Review progress made this week. (20mins)
3. Website support - thought site was OK, turned out that .htaccess file had been chewed by an automatic WordPress update - found and fixed that eventually. (1hr 10mins)
4. New project - start the next set of urgent changes. (8hrs 25mins)
2. Review progress made this week. (20mins)
3. Website support - thought site was OK, turned out that .htaccess file had been chewed by an automatic WordPress update - found and fixed that eventually. (1hr 10mins)
4. New project - start the next set of urgent changes. (8hrs 25mins)
Thursday, April 16, 2015
Today's work on/in the business - Wed 15 April
1. Update my record of time worked. (10mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (35mins)
4. Meeting covering new website work as well as other matters. (4hrs 45mins)
5. New project - meeting to specify the next set of urgent changes. (2hrs 15mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (35mins)
4. Meeting covering new website work as well as other matters. (4hrs 45mins)
5. New project - meeting to specify the next set of urgent changes. (2hrs 15mins)
Wednesday, April 15, 2015
Today's work on/in the business - Tues 14 April
1. Update my record of time worked. (10mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy - including phone call to update on progress. (8hrs 5mins)
4. New project - review potential changes in preparation for probable meeting tomorrow afternoon. (5mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy - including phone call to update on progress. (8hrs 5mins)
4. New project - review potential changes in preparation for probable meeting tomorrow afternoon. (5mins)
Tuesday, April 14, 2015
Today's work on/in the business - Mon 13 April
1. Update my record of time worked. (5mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 20mins)
4. Assist with fixing issues with forms for new website customer. (1hr 55mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 20mins)
4. Assist with fixing issues with forms for new website customer. (1hr 55mins)
Monday, April 13, 2015
Today's work on/in the business - Sun 12 April
1. Anti virus and malware scans on laptops, as this needs to be done
regularly to be sure they are clean - finished first scan on Dell laptop and run second scan, sadly both found some nasties.
(10hrs 20mins)
2. Update my record of time worked. (10mins)
3. Review progress made this week and ensure the schedule is right for next week. (20mins)
4. Read IT blogs. (10mins)
5. Backup my mail locally. (1hr 30mins)
2. Update my record of time worked. (10mins)
3. Review progress made this week and ensure the schedule is right for next week. (20mins)
4. Read IT blogs. (10mins)
5. Backup my mail locally. (1hr 30mins)
Sunday, April 12, 2015
Today's work on/in the business - Sat 11 April
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Anti virus and malware scans on laptops, as this needs to be done regularly to be sure they are clean - run first scan on Dell laptop. (5hrs 30mins)
2. Review progress made this week. (10mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Anti virus and malware scans on laptops, as this needs to be done regularly to be sure they are clean - run first scan on Dell laptop. (5hrs 30mins)
Saturday, April 11, 2015
Today's work on/in the business - Fri 10 April
1. Investigate why our internet connection was down, top up mobile broadband and use it instead. (1hr 30mins)
2. Paperwork for insurance renewal, including setting up scanner to work with the other laptop. (2hrs 30mins)
3. Review progress made this week. (25mins)
4. Update my record of time worked. (10mins)
The morning was spent registering the trailer and shopping - then I got home to no internet...
2. Paperwork for insurance renewal, including setting up scanner to work with the other laptop. (2hrs 30mins)
3. Review progress made this week. (25mins)
4. Update my record of time worked. (10mins)
The morning was spent registering the trailer and shopping - then I got home to no internet...
Friday, April 10, 2015
Today's work on/in the business - Thurs 9 April
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 40mins)
4. Backup my mail locally. (20mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (7hrs 40mins)
4. Backup my mail locally. (20mins)
Thursday, April 9, 2015
Today's work on/in the business - Wed 8 April
1. Update my record of time worked. (5mins)
2. Review progress made this week. (20mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 50mins)
2. Review progress made this week. (20mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 50mins)
Wednesday, April 8, 2015
Today's work on/in the business - Tues 7 April
1. Update my record of time worked. (50mins)
2. Review progress made this week. (20mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 30mins)
2. Review progress made this week. (20mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 30mins)
Tuesday, April 7, 2015
Today's work on/in the business - Mon 6 April
1. Update my record of time worked. (10mins)
2. Review progress made last week and ensure the schedule is right for this week. (25mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Investigate more possibilities for prospect - look at plugins for the next part of the site. (1hr 40mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 30mins)
2. Review progress made last week and ensure the schedule is right for this week. (25mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Investigate more possibilities for prospect - look at plugins for the next part of the site. (1hr 40mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (6hrs 30mins)
Monday, April 6, 2015
Today's work on/in the business - Fri 3 April
1. Update my record of time worked. (5mins)
2. Review progress made this week. (20mins)
3. Working on process for new Events setup - review events. (20mins)
4. Continue development changes for new project - more changes as requested by James in phone call this morning. (4hrs 55mins)
2. Review progress made this week. (20mins)
3. Working on process for new Events setup - review events. (20mins)
4. Continue development changes for new project - more changes as requested by James in phone call this morning. (4hrs 55mins)
Friday, April 3, 2015
Today's work on/in the business - Thurs 2 April
1. Update my record of time worked. (5mins)
2. Review progress made this week. (15mins)
3. Continue development changes for new project - more changes as requested by James in phone call this morning. (10hrs 55mins)
2. Review progress made this week. (15mins)
3. Continue development changes for new project - more changes as requested by James in phone call this morning. (10hrs 55mins)
Thursday, April 2, 2015
Today's work on/in the business - Wed 1 April
1. Update my record of time worked. (15mins)
2. Review progress made this week. (10ins)
3. Continue development changes for new project - more changes as requested by James in phone call this morning. (4hrs 15mins)
2. Review progress made this week. (10ins)
3. Continue development changes for new project - more changes as requested by James in phone call this morning. (4hrs 15mins)
Wednesday, April 1, 2015
Today's work on/in the business - Tues 31 March
1. Update my record of time worked. (10mins)
2. Review progress made this week. (15mins)
3. Working on process for new Events setup - review events and enter regular events. (3hrs 25mins)
4. Continue development changes for new project - more changes as requested by James in phone call this morning. (4hrs 50mins)
2. Review progress made this week. (15mins)
3. Working on process for new Events setup - review events and enter regular events. (3hrs 25mins)
4. Continue development changes for new project - more changes as requested by James in phone call this morning. (4hrs 50mins)
Tuesday, March 31, 2015
Today's work on/in the business - Mon 30 March
1. Update my record of time worked. (10mins)
2. Review progress made this week. (20mins)
3. Continue development changes for new project - more changes as requested by James in phone call this morning. (7hrs)
4.Renew domain names. (Didn't actually spend all this time on this - but that's how long between start and finish - not chargeable anyway, so leave it as this). (1hr 15mins)
2. Review progress made this week. (20mins)
3. Continue development changes for new project - more changes as requested by James in phone call this morning. (7hrs)
4.Renew domain names. (Didn't actually spend all this time on this - but that's how long between start and finish - not chargeable anyway, so leave it as this). (1hr 15mins)
Monday, March 30, 2015
Today's work on/in the business - Sat 28 March
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup my mail locally. (15mins)
5. Continue development changes for new project - more changes as requested by James in phone call this morning. (9hrs 10mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup my mail locally. (15mins)
5. Continue development changes for new project - more changes as requested by James in phone call this morning. (9hrs 10mins)
Saturday, March 28, 2015
Today's work on/in the business - Fri 27 March
1. Update my record of time worked. (5mins)
2. Review progress made this week. (25mins)
3. Continue development changes for new project - finalise deployment to live server and get DNS pointed at the site. (5hrs 40mins)
4. Invoice reconciliation - one timesheet and three invoices created and sent. (3hrs 55mins)
2. Review progress made this week. (25mins)
3. Continue development changes for new project - finalise deployment to live server and get DNS pointed at the site. (5hrs 40mins)
4. Invoice reconciliation - one timesheet and three invoices created and sent. (3hrs 55mins)
Friday, March 27, 2015
Today's work on/in the business - Thurs 26 March
1. Update my record of time worked. (25mins)
2. Review progress made this week. (15mins)
3. Continue development changes for new project - make more changes, continue deployment to live server. (9hrs 20mins)
2. Review progress made this week. (15mins)
3. Continue development changes for new project - make more changes, continue deployment to live server. (9hrs 20mins)
Thursday, March 26, 2015
Today's work on/in the business - Wed 25 March
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Continue development changes for new project - make more changes, continue deployment to live server - needs some software changes. (5hrs 15mins)
4. Accounting. (3hrs 35mins)
2. Review progress made this week. (10mins)
3. Continue development changes for new project - make more changes, continue deployment to live server - needs some software changes. (5hrs 15mins)
4. Accounting. (3hrs 35mins)
Wednesday, March 25, 2015
Today's work on/in the business - Tues 24 March
1. Update my record of time worked. (15mins)
2. Review progress made this week. (10mins)
3. Continue development changes for new project - make more changes and deploy to test setup, start deployment to live server. (8hrs 45mins)
2. Review progress made this week. (10mins)
3. Continue development changes for new project - make more changes and deploy to test setup, start deployment to live server. (8hrs 45mins)
Tuesday, March 24, 2015
Today's work on/in the business - Mon 23 March
1. Update my record of time worked. (10mins)
2. Review progress made last week and ensure the schedule is right for this week. (25mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup my mail locally. (20mins)
5. Continue development changes for new project - more changes as requested. (5hrs 25mins)
2. Review progress made last week and ensure the schedule is right for this week. (25mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup my mail locally. (20mins)
5. Continue development changes for new project - more changes as requested. (5hrs 25mins)
Saturday, March 21, 2015
Today's work on/in the business - Fri 20 March
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Continue development changes for new project - make more changes and deploy to test setup. (5hrs)
2. Review progress made this week. (10mins)
3. Continue development changes for new project - make more changes and deploy to test setup. (5hrs)
Friday, March 20, 2015
Today's work on/in the business - Thurs 19 March
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Accounting. (5mins)
4. Continue development changes for new project - finish import of new data and make more changes. (8hrs 25mins)
2. Review progress made this week. (10mins)
3. Accounting. (5mins)
4. Continue development changes for new project - finish import of new data and make more changes. (8hrs 25mins)
Thursday, March 19, 2015
Today's work on/in the business - Wed 18 March
1. Update my record of time worked. (5mins)
2. Review progress made this week. (15mins)
3. Continue development changes for new project - continue import of new data. (10hrs 30mins)
2. Review progress made this week. (15mins)
3. Continue development changes for new project - continue import of new data. (10hrs 30mins)
Wednesday, March 18, 2015
Today's work on/in the business - Tues 17 March
1. Update my record of time worked. (20mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (30mins)
4. Continue development changes for new project - continue import of new data and make more changes. (2hrs 55mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (30mins)
4. Continue development changes for new project - continue import of new data and make more changes. (2hrs 55mins)
Tuesday, March 17, 2015
Today's work on/in the business - Mon 16 March
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Continue development changes for new project - continue import of new data. (55mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 15mins)
2. Review progress made this week. (10mins)
3. Continue development changes for new project - continue import of new data. (55mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 15mins)
Monday, March 16, 2015
Today's work on/in the business - Sun 15 March
1. Update my record of time worked. (10mins)
2. Review progress made this week and ensure the schedule is right for next week. (15mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup my mail locally. (50mins)
5. Continue development changes for new project - continue import of new data. (5hrs 55mins)
2. Review progress made this week and ensure the schedule is right for next week. (15mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup my mail locally. (50mins)
5. Continue development changes for new project - continue import of new data. (5hrs 55mins)
Sunday, March 15, 2015
Today's work on/in the business - Fri 13 March
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Continue development changes for new project - send new SSL certificate request, start new data import. (7hrs 15mins)
2. Review progress made this week. (10mins)
3. Continue development changes for new project - send new SSL certificate request, start new data import. (7hrs 15mins)
Friday, March 13, 2015
Today's work on/in the business - Thurs 12 March
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 35mins)
4. Continue development changes for new project - further correspondence re SSL certificate issues. (15mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 35mins)
4. Continue development changes for new project - further correspondence re SSL certificate issues. (15mins)
Thursday, March 12, 2015
Today's work on/in the business - Wed 11 March
1. Update my record of time worked. (10mins)
2. Review progress made this week. (20mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 50mins)
2. Review progress made this week. (20mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs 50mins)
Wednesday, March 11, 2015
Today's work on/in the business - Tues 10 March
1. Update my record of time worked. (20mins)
2. Review progress made this week. (15mins)
3. Determine whether we met the KPIs (Key Performance Indicators) for February 2015. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise and we need to work on contacting new prospects too (still). Sadly, networking also lost out again like last month. (10mins)
4. Continue development changes for new project - collate list of entries which did not import and send to customer. Also respond to SSL certificate issues. (4hrs 30mins)
5. Investigate more possibilities for prospect - look at test setups. (2hrs 10mins)
6. Working on process for new Events setup - review events. (15mins)
2. Review progress made this week. (15mins)
3. Determine whether we met the KPIs (Key Performance Indicators) for February 2015. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise and we need to work on contacting new prospects too (still). Sadly, networking also lost out again like last month. (10mins)
4. Continue development changes for new project - collate list of entries which did not import and send to customer. Also respond to SSL certificate issues. (4hrs 30mins)
5. Investigate more possibilities for prospect - look at test setups. (2hrs 10mins)
6. Working on process for new Events setup - review events. (15mins)
Tuesday, March 10, 2015
Today's work on/in the business - Mon 9 March
1. Review progress made this week and ensure the schedule is right for next week. (55mins)
2. Update my record of time worked. (10mins)
3. Advise customer of details of forms for website customer while their email system was down again. (25mins)
4. Continue development changes for new project - continue import of real data. (3hrs 50mins)
5. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
2. Update my record of time worked. (10mins)
3. Advise customer of details of forms for website customer while their email system was down again. (25mins)
4. Continue development changes for new project - continue import of real data. (3hrs 50mins)
5. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
Monday, March 9, 2015
Today's work on/in the business - Sat 7 March
1. Update my record of time worked. (10mins)
2. Review progress made this week. (5mins)
3. Continue development changes for new project - continue import of real data. (9hrs 55mins)
4. Backup my mail locally. (15mins)
2. Review progress made this week. (5mins)
3. Continue development changes for new project - continue import of real data. (9hrs 55mins)
4. Backup my mail locally. (15mins)
Saturday, March 7, 2015
Today's work on/in the business - Fri 6 March
1. Update my record of time worked. (35mins)
2. Review progress made this week. (35mins)
3. Working on process for new Events setup - review events. (10mins)
4. Continue development changes for new project - continue import of real data. (4hrs 45mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 30mins)
2. Review progress made this week. (35mins)
3. Working on process for new Events setup - review events. (10mins)
4. Continue development changes for new project - continue import of real data. (4hrs 45mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (5hrs 30mins)
Friday, March 6, 2015
Today's work on/in the business - Thurs 5 March
1. Update my record of time worked. (10mins)
2. Review progress made this week. (20mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Also assist with response to RFP. (6hrs 10mins)
4. Advise customer of details of forms for website customer while their email system was down. (20mins)
5. Continue development changes for new project - continue import of real data, including checking it still functions after changes to make it work as required. Also create a new test user. (5hrs 55mins)
2. Review progress made this week. (20mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Also assist with response to RFP. (6hrs 10mins)
4. Advise customer of details of forms for website customer while their email system was down. (20mins)
5. Continue development changes for new project - continue import of real data, including checking it still functions after changes to make it work as required. Also create a new test user. (5hrs 55mins)
Thursday, March 5, 2015
Today's work on/in the business - Wed 4 March
1. Update my record of time worked. (10mins)
2. Review progress made this week. (1hr 5mins)
3. Continue development changes for new project - continue import of real data, including changes to make it function as actually required. (6hrs 30mins)
4. Working on process for new Events setup - review events. (15mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 5mins)
2. Review progress made this week. (1hr 5mins)
3. Continue development changes for new project - continue import of real data, including changes to make it function as actually required. (6hrs 30mins)
4. Working on process for new Events setup - review events. (15mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (3hrs 5mins)
Wednesday, March 4, 2015
Today's work on/in the business - Tues 3 March
1. Update my record of time worked. (25mins)
2. Continue development changes for new project - continue import of real data. (1hr 50mins)
3. Investigate process for potential new project for existing customer. Continue setting up test environment for proof of concept work. (5hrs 5mins)
4. Backup files from my laptop, as it was making nasty noises. (3hrs 35mins)
2. Continue development changes for new project - continue import of real data. (1hr 50mins)
3. Investigate process for potential new project for existing customer. Continue setting up test environment for proof of concept work. (5hrs 5mins)
4. Backup files from my laptop, as it was making nasty noises. (3hrs 35mins)
Tuesday, March 3, 2015
Today's work on/in the business - Mon 2 March
1. Update my record of time worked. (5mins)
2. Continue development changes for new project - continue import of real data. (2hrs 30mins)
3. Working on process for new Events setup - review events. (25mins)
4. Investigate process for potential new project for existing customer. Continue setting up test environment for proof of concept work. (7hrs 45mins)
5. BAS (15mins)
2. Continue development changes for new project - continue import of real data. (2hrs 30mins)
3. Working on process for new Events setup - review events. (25mins)
4. Investigate process for potential new project for existing customer. Continue setting up test environment for proof of concept work. (7hrs 45mins)
5. BAS (15mins)
Monday, March 2, 2015
Today's work on/in the business - Sun 1 March
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Continue development changes for new project - continue import of real data, work on Phase 1 testing issue reported. (9hrs 55mins)
2. Review progress made this week. (10mins)
3. Continue development changes for new project - continue import of real data, work on Phase 1 testing issue reported. (9hrs 55mins)
Sunday, March 1, 2015
Today's work on/in the business - Sat 28 February
1. Update my record of time worked. (10mins)
2. Review progress made this week and ensure the schedule is right for next week. (30mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup my mail locally. (10mins)
5. Continue development changes for new project - continue import of real data. (2hrs 50mins)
6. Investigate process for potential new project for existing customer. Continue setting up test environment for proof of concept work. (6hrs 40mins)
2. Review progress made this week and ensure the schedule is right for next week. (30mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup my mail locally. (10mins)
5. Continue development changes for new project - continue import of real data. (2hrs 50mins)
6. Investigate process for potential new project for existing customer. Continue setting up test environment for proof of concept work. (6hrs 40mins)
Saturday, February 28, 2015
Today's work on/in the business - Fri 27 February
1. Update my record of time worked. (10mins)
2. Continue development changes for new project - continue import of real data. (1hr 25mins)
3. Working on process for new Events setup - review events. (15mins)
4. Review progress made this week. (25mins)
5. Determine whether we met the KPIs (Key Performance Indicators) for January 2015. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise and we need to work on contacting new prospects too (still). Sadly, networking also lost out again like last month. (15mins)
6. Investigate process for potential new project for existing customer. Decided on basic structure, setting up test environment for proof of concept work. (6hrs 45mins)
2. Continue development changes for new project - continue import of real data. (1hr 25mins)
3. Working on process for new Events setup - review events. (15mins)
4. Review progress made this week. (25mins)
5. Determine whether we met the KPIs (Key Performance Indicators) for January 2015. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise and we need to work on contacting new prospects too (still). Sadly, networking also lost out again like last month. (15mins)
6. Investigate process for potential new project for existing customer. Decided on basic structure, setting up test environment for proof of concept work. (6hrs 45mins)
Friday, February 27, 2015
Today's work on/in the business - Thurs 26 February
1. Update my record of time worked. (5mins)
2. Continue development changes for new project - continue import of real data, start some of the Phase 2 work. (8hrs 35mins)
3. Review progress made this week. (20mins)
4. Working on process for new Events setup - enter regular events. (40mins)
5. Investigate more possibilities for prospect - look at test setups. (50mins)
6. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs)
2. Continue development changes for new project - continue import of real data, start some of the Phase 2 work. (8hrs 35mins)
3. Review progress made this week. (20mins)
4. Working on process for new Events setup - enter regular events. (40mins)
5. Investigate more possibilities for prospect - look at test setups. (50mins)
6. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (4hrs)
Thursday, February 26, 2015
Today's work on/in the business - Wed 25 February
1. Continue development
changes for new project - continue import of real data, start some of the Phase 2 work. (12hrs 5mins)
2. Update my record of time worked. (5mins)
3. Review progress made this week. (15mins)
4. Make changes to form for website customer. (20mins)
5. Working on process for new Events setup - review events. (1hr 50mins)
2. Update my record of time worked. (5mins)
3. Review progress made this week. (15mins)
4. Make changes to form for website customer. (20mins)
5. Working on process for new Events setup - review events. (1hr 50mins)
Wednesday, February 25, 2015
Today's work on/in the business - Tues 24 February
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Continue development changes for new project - investigate issues raised from testing and start to import real data. (13hrs 45mins)
4. Investigate more possibilities for prospect. (20mins)
2. Review progress made this week. (10mins)
3. Continue development changes for new project - investigate issues raised from testing and start to import real data. (13hrs 45mins)
4. Investigate more possibilities for prospect. (20mins)
Tuesday, February 24, 2015
Today's work on/in the business - Mon 23 February
1. Update my record of time worked. (5mins)
2. Review progress made this week. (5mins)
3. Continue development changes for new project - investigate issues raised from testing and new feature requested. (5hrs 15mins)
2. Review progress made this week. (5mins)
3. Continue development changes for new project - investigate issues raised from testing and new feature requested. (5hrs 15mins)
Monday, February 23, 2015
Today's work on/in the business - Sun 22 February
1. Update my record of time worked. (10mins)
2. Review progress made this week. (20mins)
3. Windows updates on my laptop. (20mins)
4. Invoice reconciliation - 1 updated. (35mins)
2. Review progress made this week. (20mins)
3. Windows updates on my laptop. (20mins)
4. Invoice reconciliation - 1 updated. (35mins)
Sunday, February 22, 2015
Today's work on/in the business - Sat 21 February
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup my mail locally. (20mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup my mail locally. (20mins)
Saturday, February 21, 2015
Today's work on/in the business - Fri 20 February
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Continue development changes for new project - investigate issues raised from testing and new feature requested. (9hrs)
2. Review progress made this week. (10mins)
3. Continue development changes for new project - investigate issues raised from testing and new feature requested. (9hrs)
Friday, February 20, 2015
Today's work on/in the business - Thurs 19 February
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Continue development changes for new project - investigate issue raised from testing. (9hrs)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (1hr)
2. Review progress made this week. (10mins)
3. Continue development changes for new project - investigate issue raised from testing. (9hrs)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (1hr)
Thursday, February 19, 2015
Today's work on/in the business - Wed 18 February
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. He called for an update. (1hr 15mins)
4. Continue development changes for new project - investigate issue raised from testing. (8hrs 10mins)
5. Called prospect to verify that she is still interested in moving ahead with this. (5mins)
2. Review progress made this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. He called for an update. (1hr 15mins)
4. Continue development changes for new project - investigate issue raised from testing. (8hrs 10mins)
5. Called prospect to verify that she is still interested in moving ahead with this. (5mins)
Wednesday, February 18, 2015
Today's work on/in the business - Tues 17 February
1. Update my record of time worked. (10mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 35mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. (8hrs 35mins)
Tuesday, February 17, 2015
Today's work on/in the business - Mon 16 February
1. Update my record of time worked. (5mins)
2. Review progress made last week and ensure the schedule is right for this week. (50mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup my mail locally. (10mins)
5. Continue development changes for new project - finalise Phase 1 development, ready for user testing. (4hrs 45mins)
6. Investigate more possibility for prospect. Need to call her to verify that she is still interested in moving ahead with this. (1hr)
2. Review progress made last week and ensure the schedule is right for this week. (50mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup my mail locally. (10mins)
5. Continue development changes for new project - finalise Phase 1 development, ready for user testing. (4hrs 45mins)
6. Investigate more possibility for prospect. Need to call her to verify that she is still interested in moving ahead with this. (1hr)
Sunday, February 15, 2015
Today's work on/in the business - Fri 13 February
1. Update my record of time worked. (5mins)
2. Review progress made this week. (15mins)
3. Continue development changes for new project. (7hrs 40mins)
2. Review progress made this week. (15mins)
3. Continue development changes for new project. (7hrs 40mins)
Friday, February 13, 2015
Today's work on/in the business - Thurs 12 February
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Continue development changes for new project. (7hrs 30mins)
4. Phone calls and investigation re connection issue for support customer. (30mins)
2. Review progress made this week. (10mins)
3. Continue development changes for new project. (7hrs 30mins)
4. Phone calls and investigation re connection issue for support customer. (30mins)
Thursday, February 12, 2015
Today's work on/in the business - Wed 11 February
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Continue development changes for new project. (12hrs 10mins)
2. Review progress made this week. (10mins)
3. Continue development changes for new project. (12hrs 10mins)
Wednesday, February 11, 2015
Today's work on/in the business - Tues 10 February
1. Update my record of time worked. (5mins)
2. Review progress made this week. (5mins)
3. Continue development changes for new project. (9hrs)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy - confirm that existing process actually works, ready for demonstration next week. (10mins)
5. Review document responding to proposal for website upgrade by others for new website customer. (15mins)
2. Review progress made this week. (5mins)
3. Continue development changes for new project. (9hrs)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy - confirm that existing process actually works, ready for demonstration next week. (10mins)
5. Review document responding to proposal for website upgrade by others for new website customer. (15mins)
Tuesday, February 10, 2015
Today's work on/in the business - Mon 9 February
1. Update my record of time worked. (5mins)
2. Review progress made this week. (5mins)
3. Continue development changes for new project. (8hrs 30mins)
2. Review progress made this week. (5mins)
3. Continue development changes for new project. (8hrs 30mins)
Monday, February 9, 2015
Today's work on/in the business - Sun 8 February
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Invoice reconciliation - caught up on a lot of the backlog - not all of it, but a chunk. (5hrs 45mins)
2. Review progress made this week. (10mins)
3. Invoice reconciliation - caught up on a lot of the backlog - not all of it, but a chunk. (5hrs 45mins)
Sunday, February 8, 2015
Today's work on/in the business - Sat 7 February
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (15mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup my mail locally. (15mins)
5. Accounting - finally up to date! (4hrs 30mins)
2. Review progress made this week and ensure the schedule is right for next week. (15mins)
3. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
4. Backup my mail locally. (15mins)
5. Accounting - finally up to date! (4hrs 30mins)
Saturday, February 7, 2015
Today's work on/in the business - Fri 6 February
1. Update my record of time worked. (5mins)
2. Review progress made this week. (15mins)
3. Continue development changes for new project. (7hrs 10mins)
2. Review progress made this week. (15mins)
3. Continue development changes for new project. (7hrs 10mins)
Friday, February 6, 2015
Today's work on/in the business - Thurs 5 February
1. Update my record of time worked. (5mins)
2. Assist with setting up new form for new website customer. (25mins)
3. Review progress made this week. (15mins)
4. Continue development changes for new project. (8hrs 20mins)
2. Assist with setting up new form for new website customer. (25mins)
3. Review progress made this week. (15mins)
4. Continue development changes for new project. (8hrs 20mins)
Thursday, February 5, 2015
Today's work on/in the business - Wed 4 February
1. Update my record of time worked. (10mins)
2. Review progress made this week. (10mins)
3. Continue development changes for new project. (7hrs 30mins)
4. Advise how many forms were completed for website customer. (15mins)
5. Assist with setting up new form for new website customer. (10mins)
2. Review progress made this week. (10mins)
3. Continue development changes for new project. (7hrs 30mins)
4. Advise how many forms were completed for website customer. (15mins)
5. Assist with setting up new form for new website customer. (10mins)
Wednesday, February 4, 2015
Today's work on/in the business - Tues 3 February
1. Update my record of time worked. (5mins)
2. Review progress made this week. (10mins)
3. Continue development changes for new project. (5hrs 30mins)
4. Assist with upgrades for new website customer. (25mins)
2. Review progress made this week. (10mins)
3. Continue development changes for new project. (5hrs 30mins)
4. Assist with upgrades for new website customer. (25mins)
Tuesday, February 3, 2015
Today's work on/in the business - Mon 2 February
1. Update my record of time worked. (10mins)
2. Review progress made this week. (40mins)
3. Continue development changes for new project. (6hrs 25mins)
4. Download site backup for new website customer. (1hr 50mins)
5. Working on process for new Events setup - review events. (25mins)
2. Review progress made this week. (40mins)
3. Continue development changes for new project. (6hrs 25mins)
4. Download site backup for new website customer. (1hr 50mins)
5. Working on process for new Events setup - review events. (25mins)
Monday, February 2, 2015
Today's work on/in the business - Sun 1 February
1. Update my record of time worked. (10mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Make changes to form for website customer after issues were reported. (40mins)
4. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
5. Backup my mail locally. (15mins)
6. Continue development changes for new project. (4hrs 20mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Make changes to form for website customer after issues were reported. (40mins)
4. Review the project schedules, adjusted all projects based on actual progress and added a week to software schedules. (5mins)
5. Backup my mail locally. (15mins)
6. Continue development changes for new project. (4hrs 20mins)
Sunday, February 1, 2015
Today's work on/in the business - Sat 31 January
1. Update my record of time worked. (10mins)
2. Review progress made this week. (20mins)
3. Continue development changes for new project. (6hrs 15mins)
4. Assist with work for support customer. (25mins)
2. Review progress made this week. (20mins)
3. Continue development changes for new project. (6hrs 15mins)
4. Assist with work for support customer. (25mins)
Saturday, January 31, 2015
Today's work on/in the business - Fri 30 January
1. Assist with work for support customer. (30mins)
2. Update my record of time worked. (5mins)
3. Review progress made this week. (5mins)
4. Continue development changes for new project. (4hrs 50mins)
5. Make changes to form for website customer. (1hr)
6. Working on process for new Events setup - review events and enter regular events. (1hr 55mins)
7. Invoice reconciliation - follow up on one customer again. (10mins)
2. Update my record of time worked. (5mins)
3. Review progress made this week. (5mins)
4. Continue development changes for new project. (4hrs 50mins)
5. Make changes to form for website customer. (1hr)
6. Working on process for new Events setup - review events and enter regular events. (1hr 55mins)
7. Invoice reconciliation - follow up on one customer again. (10mins)
Friday, January 30, 2015
Today's work on/in the business - Thurs 29 January
1. Update my record of time worked. (10mins)
2. Assist with work for support customer. (1hr 30mins)
3. Review progress made this week. (15mins)
4. Continue development changes for new project. (7hrs 15mins)
2. Assist with work for support customer. (1hr 30mins)
3. Review progress made this week. (15mins)
4. Continue development changes for new project. (7hrs 15mins)
Thursday, January 29, 2015
Today's work on/in the business - Wed 28 January
1. Update my record of time worked. (5mins)
2. Review progress made this week. (20mins)
3. Assist with work for support customer. (15mins)
4. Continue development changes for new project. (9hrs 50mins)
2. Review progress made this week. (20mins)
3. Assist with work for support customer. (15mins)
4. Continue development changes for new project. (9hrs 50mins)