This is the story of our journey from deciding to go into business to being in business for ourselves. A number of friends asked for details of the actual process, particularly any pitfalls - so that others can learn from our mistakes!
Tuesday, December 31, 2019
Monday, December 30, 2019
Today's work on/in the business - Sat 28 December
1. Work on our server. (2hrs 20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (4hrs 40mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (4hrs 40mins)
Today's work on/in the business - Fri 27 December
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 50mins)
3. Work on our server. (2hr 30mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 50mins)
3. Work on our server. (2hr 30mins)
Friday, December 27, 2019
Today's work on/in the business - Tues 24 December
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 50mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 50mins)
Tuesday, December 24, 2019
Today's work on/in the business - Mon 23 December
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (4hrs 55mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (4hrs 55mins)
Monday, December 23, 2019
Today's work on/in the business - Fri 20 December
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 20mins)
Friday was stinking hot!
And then we went to a friend's house for a really good farewell dinner for another friend who is moving overseas. Sadly, it was still in the 40's when we had to go out, so the planned outdoor dinner became an indoor dinner with every fan they owned going, so that everyone was comfortable. But it was a really good evening anyway, with lots of good interaction and conversation.
So Saturday was partly recovery from the heat and late night (no point in trying to go to bed before about 1.30am - then the 'change' came through - about a dozen spots of rain, but the air did get cooler!). Also, collecting the potential replacement washing machine.... Replacement onto trailer - OK. Replacement part way out of trailer for investigation - sort of OK. Original out of laundry - REALLY difficult. Replacement out of trailer and into laundry - difficult. Unable to get replacement to actually start - the fact that the only manuals I could find were in Czech and Russian NOT helping...! Then another friend came over - issues were identified - investigation of original washing machine led to it working again - they removed replacement one without much issue - returned original one to laundry with less effort than it took getting it out! WIN - original washing machine working like a dream!
Sunday - track racing at Blackburn - a great day!
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 20mins)
Friday was stinking hot!
And then we went to a friend's house for a really good farewell dinner for another friend who is moving overseas. Sadly, it was still in the 40's when we had to go out, so the planned outdoor dinner became an indoor dinner with every fan they owned going, so that everyone was comfortable. But it was a really good evening anyway, with lots of good interaction and conversation.
So Saturday was partly recovery from the heat and late night (no point in trying to go to bed before about 1.30am - then the 'change' came through - about a dozen spots of rain, but the air did get cooler!). Also, collecting the potential replacement washing machine.... Replacement onto trailer - OK. Replacement part way out of trailer for investigation - sort of OK. Original out of laundry - REALLY difficult. Replacement out of trailer and into laundry - difficult. Unable to get replacement to actually start - the fact that the only manuals I could find were in Czech and Russian NOT helping...! Then another friend came over - issues were identified - investigation of original washing machine led to it working again - they removed replacement one without much issue - returned original one to laundry with less effort than it took getting it out! WIN - original washing machine working like a dream!
Sunday - track racing at Blackburn - a great day!
Friday, December 20, 2019
Today's work on/in the business - Thurs 19 December
1. Update my record of time worked. (5mins)
2. Work to remove error from our server. (40mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 10mins)
2. Work to remove error from our server. (40mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 10mins)
Thursday, December 19, 2019
Today's work on/in the business - Wed 18 December
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 15mins)
Wednesday, December 18, 2019
Today's work on/in the business - Tues 17 December
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs)
Tuesday, December 17, 2019
Today's work on/in the business - Mon 16 December
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 30mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 30mins)
Monday, December 16, 2019
Today's work on/in the business - Sun 15 December
1. Recording time. (15mins)
Saturday out having fun again - Christmas event - then later Sunday another Christmas event - must be that time of year...!
Saturday out having fun again - Christmas event - then later Sunday another Christmas event - must be that time of year...!
Today's work on/in the business - Fri 13 December
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 5mins)
Friday, December 13, 2019
Today's work on/in the business - Thurs 12 December
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 25mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 25mins)
Thursday, December 12, 2019
Today's work on/in the business - Wed 11 December
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 30mins)
3. Next session with student ET - includes travel time. (2hrs 10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 30mins)
3. Next session with student ET - includes travel time. (2hrs 10mins)
Wednesday, December 11, 2019
Today's work on/in the business - Tues 10 December
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 35mins)
Most of the morning spent collecting a friend from hospital and getting her home safely.
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 35mins)
Most of the morning spent collecting a friend from hospital and getting her home safely.
Tuesday, December 10, 2019
Today's work on/in the business - Mon 9 December
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 45mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 45mins)
Monday, December 9, 2019
Today's work on/in the business - Sun 8 December
1. Next session with student LM - includes travel time. (2hrs 15mins)
Today's work on/in the business - Sat 7 December
1. Update my record of time worked. (5mins)
2. Recording time. (20mins)
2. Recording time. (20mins)
Saturday, December 7, 2019
Today's work on/in the business - Fri 6 December
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 55mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 55mins)
Friday, December 6, 2019
Today's work on/in the business - Thurs 5 December
1. Update my record of time worked. (5mins)
2. Working on process for new Events setup - review events. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 35mins)
4. Next session with student AF - includes travel time. (1hr 45mins)
2. Working on process for new Events setup - review events. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 35mins)
4. Next session with student AF - includes travel time. (1hr 45mins)
Thursday, December 5, 2019
Today's work on/in the business - Wed 4 December
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 5mins)
3. Next session with student ET - includes travel time. (1hr 50mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 5mins)
3. Next session with student ET - includes travel time. (1hr 50mins)
Wednesday, December 4, 2019
Today's work on/in the business - Tues 3 December
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 50mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 50mins)
Tuesday, December 3, 2019
Today's work on/in the business - Mon 2 December
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 25mins)
3. Next sessions with students AZ and SS - includes travel time. (2hrs 50mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 25mins)
3. Next sessions with students AZ and SS - includes travel time. (2hrs 50mins)
Monday, December 2, 2019
Today's work on/in the business - Sun 1 December
1. Recording time. (30mins)
2. Update my record of time worked. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (4hrs 10mins)
4. Working on process for new Events setup - review events and enter regular events. (1hr 5mins)
2. Update my record of time worked. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (4hrs 10mins)
4. Working on process for new Events setup - review events and enter regular events. (1hr 5mins)
Sunday, December 1, 2019
Today's work on/in the business - Sat 30 November
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 55mins)
3. Working on process for new Events setup - review events. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 55mins)
3. Working on process for new Events setup - review events. (5mins)
Saturday, November 30, 2019
Today's work on/in the business - Fri 29 November
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 45mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 45mins)
Friday, November 29, 2019
Today's work on/in the business - Thurs 28 November
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 20mins)
3. Next sessions with students AF and AZ - includes travel time. (3hrs 5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 20mins)
3. Next sessions with students AF and AZ - includes travel time. (3hrs 5mins)
Thursday, November 28, 2019
Today's work on/in the business - Wed 27 November
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 25mins)
3. Next session with student AK - includes travel time. (1hr 15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 25mins)
3. Next session with student AK - includes travel time. (1hr 15mins)
Wednesday, November 27, 2019
Today's work on/in the business - Tues 26 November
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 55mins)
3. Next session with student EH - includes travel time. (1hr 50mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 55mins)
3. Next session with student EH - includes travel time. (1hr 50mins)
Tuesday, November 26, 2019
Today's work on/in the business - Mon 25 November
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 55mins)
3. Next sessions with students AZ, SS and AK - includes travel time. (4hrs 5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 55mins)
3. Next sessions with students AZ, SS and AK - includes travel time. (4hrs 5mins)
Monday, November 25, 2019
Today's work on/in the business - Sun 24 November
No work yesterday - a long but fun day out celebrating my partner's birthday!
1. Recording time and next session with student LM - includes travel time. (2hrs 45mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (3hrs 15mins)
1. Recording time and next session with student LM - includes travel time. (2hrs 45mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (3hrs 15mins)
Today's work on/in the business - Fri 22 November
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 55mins)
3. Next session with student AK - includes travel time. (2hrs)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 55mins)
3. Next session with student AK - includes travel time. (2hrs)
Friday, November 22, 2019
Today's work on/in the business - Thurs 21 November
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 25mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 25mins)
Thursday, November 21, 2019
Today's work on/in the business - Wed 20 November
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 15mins)
3. Next sessions with students ET and AS - includes travel time. (3hrs)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 15mins)
3. Next sessions with students ET and AS - includes travel time. (3hrs)
Wednesday, November 20, 2019
Today's work on/in the business - Tues 19 November
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 10mins)
3. Next sessions with students SH and EH - includes travel time. (2hrs 35mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 10mins)
3. Next sessions with students SH and EH - includes travel time. (2hrs 35mins)
Tuesday, November 19, 2019
Today's work on/in the business - Mon 18 November
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 15mins)
3. Next sessions with students AZ, SS and AK - includes travel time. (4hrs 10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 15mins)
3. Next sessions with students AZ, SS and AK - includes travel time. (4hrs 10mins)
Monday, November 18, 2019
Today's work on/in the business - Sun 17 November
1. Next session with student LM - includes travel time. (2hrs 10mins)
Today's work on/in the business - Sat 16 November
1. Update my record of time worked. (15mins)
2. Recording time. (20mins)
Then off for a beautiful wedding with friends and family!
2. Recording time. (20mins)
Then off for a beautiful wedding with friends and family!
Saturday, November 16, 2019
Today's work on/in the business - Fri 15 November
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs)
3. Next session with student Ak - includes travel time. (1hr 25mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs)
3. Next session with student Ak - includes travel time. (1hr 25mins)
Friday, November 15, 2019
Today's work on/in the business - Thurs 14 November
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 50mins)
3. Review progress made last week and ensure the schedule is right for this week. (30mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 50mins)
3. Review progress made last week and ensure the schedule is right for this week. (30mins)
Thursday, November 14, 2019
Today's work on/in the business - Wed 13 November
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs)
3. Next sessions with students ET and AS - includes travel time. (3hrs 20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs)
3. Next sessions with students ET and AS - includes travel time. (3hrs 20mins)
Wednesday, November 13, 2019
Today's work on/in the business - Tues 12 November
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 5mins)
Tuesday, November 12, 2019
Today's work on/in the business - Mon 11 November
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs)
3. Next sessions with students AZ and SS - includes travel time. (2hrs 40mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs)
3. Next sessions with students AZ and SS - includes travel time. (2hrs 40mins)
Monday, November 11, 2019
Today's work on/in the business - Sun 10 November
1. Update my record of time worked. (35mins)
2. Recording time and next session with student LM - includes travel time. (2hrs 40mins)
2. Recording time and next session with student LM - includes travel time. (2hrs 40mins)
Sunday, November 10, 2019
Today's work on/in the business - Sat 9 November
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs)
Saturday, November 9, 2019
Today's work on/in the business - Fri 8 November
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 30mins)
3. Next sessions with students AK and AS - includes travel time. (2hrs 40mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 30mins)
3. Next sessions with students AK and AS - includes travel time. (2hrs 40mins)
Friday, November 8, 2019
Today's work on/in the business - Thurs 7 November
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 35mins)
3. Next session with student AF - includes travel time. (1hr 45mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 35mins)
3. Next session with student AF - includes travel time. (1hr 45mins)
Thursday, November 7, 2019
Today's work on/in the business - Wed 6 November
1. Update my record of time worked. (30mins)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Backup mail locally. (15mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 5mins)
5. Next session with student ET - includes travel time. (1hr 25mins)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Backup mail locally. (15mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 5mins)
5. Next session with student ET - includes travel time. (1hr 25mins)
Wednesday, November 6, 2019
Today's work on/in the business - Tues 5 November
3. Next sessions with students SH, EH and EK - includes travel time. (5hrs 15mins)
Today's work on/in the business - Mon 4 November
1. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs)
2. Update my record of time worked. (5mins)
3. Next session with student AZ - includes travel time. (1hr 55mins)
2. Update my record of time worked. (5mins)
3. Next session with student AZ - includes travel time. (1hr 55mins)
Monday, November 4, 2019
Today's work on/in the business - Sun 3 November
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 15mins)
Sunday, November 3, 2019
Today's work on/in the business - Sat 2 November
1. Next session with student LM and recording time - includes travel time. (3hrs 5mins)
2. Update my record of time worked. (55mins)
2. Update my record of time worked. (55mins)
Saturday, November 2, 2019
Today's work on/in the business - Fri 1 November
1. Update my record of time worked. (15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 45mins)
3. Next session with student SS - includes travel time. (1hr 55mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 45mins)
3. Next session with student SS - includes travel time. (1hr 55mins)
Friday, November 1, 2019
Today's work on/in the business - Thurs 31 October
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (11hrs 25mins)
3. Next session with student AK - includes travel time. (1hr 30mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (11hrs 25mins)
3. Next session with student AK - includes travel time. (1hr 30mins)
Thursday, October 31, 2019
Today's work on/in the business - Wed 30 October
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs)
3. Next sessions with students ET and EK - includes travel time. (3hrs 30mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs)
3. Next sessions with students ET and EK - includes travel time. (3hrs 30mins)
Wednesday, October 30, 2019
Today's work on/in the business - Tues 29 October
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 25mins)
3. Next sessions with students JH and SH - includes travel time. (3hrs 20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 25mins)
3. Next sessions with students JH and SH - includes travel time. (3hrs 20mins)
Tuesday, October 29, 2019
Today's work on/in the business - Mon 28 October
1. Update my record of time worked. (15mins)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Backup mail locally. (15mins)
4. Working on process for new Events setup - review events and enter regular events. (1hr)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (4hrs 10mins)
6. Post BAS. (25mins)
7. Next sessions with students AZ and SS - includes travel time. (3hrs 15mins)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Backup mail locally. (15mins)
4. Working on process for new Events setup - review events and enter regular events. (1hr)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (4hrs 10mins)
6. Post BAS. (25mins)
7. Next sessions with students AZ and SS - includes travel time. (3hrs 15mins)
Monday, October 28, 2019
Today's work on/in the business - Sun 27 October
1. Update my record of time worked. (20mins)
2. Recording time. (20mins)
3. Accounting. (4hrs 30mins)
4. BAS. (15mins)
2. Recording time. (20mins)
3. Accounting. (4hrs 30mins)
4. BAS. (15mins)
Sunday, October 27, 2019
Today's work on/in the business - Fri 25 October
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 15mins)
3. Next sessions with students AK and EK - includes travel time. (3hrs 15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 15mins)
3. Next sessions with students AK and EK - includes travel time. (3hrs 15mins)
Friday, October 25, 2019
Today's work on/in the business - Thurs 24 October
1. Update my record of time worked. (15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs)
Thursday, October 24, 2019
Today's work on/in the business - Wed 23 October
1. Update my record of time worked. (20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 30mins)
3. Next session with student ET - includes travel time. (1hr 30mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 30mins)
3. Next session with student ET - includes travel time. (1hr 30mins)
Wednesday, October 23, 2019
Today's work on/in the business - Tues 22 October
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 20mins)
3. Next session with student JH - includes travel time. (2hrs)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 20mins)
3. Next session with student JH - includes travel time. (2hrs)
Tuesday, October 22, 2019
Today's work on/in the business - Mon 21 October
1. Update my record of time worked. (15mins)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Backup mail locally. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 55mins)
5. Next session with student SS - includes travel time. (1hr 30mins)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Backup mail locally. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 55mins)
5. Next session with student SS - includes travel time. (1hr 30mins)
Monday, October 21, 2019
Today's work on/in the business - Sun 20 October
1. Update my record of time worked. (20mins)
2. Recording time and next session with student LM - includes travel time. (2hrs 45mins)
2. Recording time and next session with student LM - includes travel time. (2hrs 45mins)
Sunday, October 20, 2019
Today's work on/in the business - Sat 19 October
1. Next session with student MK - includes travel time. (1hr 30mins)
Today's work on/in the business - Fri 18 October
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs)
3. Next session with student AS - includes travel time. (1hr 30mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs)
3. Next session with student AS - includes travel time. (1hr 30mins)
Friday, October 18, 2019
Today's work on/in the business - Thurs 17 October
1. Update my record of time worked. (35mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 30mins)
3. Next session with student AF - includes travel time. (1hr 40mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 30mins)
3. Next session with student AF - includes travel time. (1hr 40mins)
Thursday, October 17, 2019
Today's work on/in the business - Wed 16 October
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 20mins)
3. Working on process for new Events setup - review events. (25mins)
4. Next sessions with students ET and EK - includes travel time. (3hrs 20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 20mins)
3. Working on process for new Events setup - review events. (25mins)
4. Next sessions with students ET and EK - includes travel time. (3hrs 20mins)
Wednesday, October 16, 2019
Today's work on/in the business - Tues 15 October
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 45mins)
3. Next sessions with students JH, SH and EH - includes travel time. (4hrs 30mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 45mins)
3. Next sessions with students JH, SH and EH - includes travel time. (4hrs 30mins)
Tuesday, October 15, 2019
Today's work on/in the business - Mon 14 October
1. Update my record of time worked. (5mins)
2. Review progress made last week and ensure the schedule is right for this week. (10mins)
3. Backup mail locally - including backing up another account. (3hrs 10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (4hrs 35mins)
5. Next sessions with students AZ and SS - includes travel time. (2hrs 55mins)
2. Review progress made last week and ensure the schedule is right for this week. (10mins)
3. Backup mail locally - including backing up another account. (3hrs 10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (4hrs 35mins)
5. Next sessions with students AZ and SS - includes travel time. (2hrs 55mins)
Monday, October 14, 2019
Today's work on/in the business - Sun 13 October
1. Update my record of time worked. (20mins)
2. Recording time. (30mins)
Then a lovely afternoon out with friends listening to jazz and remembering a friend that we lost.
2. Recording time. (30mins)
Then a lovely afternoon out with friends listening to jazz and remembering a friend that we lost.
Sunday, October 13, 2019
Today's work on/in the business - Sat 12 October
1. Next session with student MK - includes travel time. (1hr 30mins)
Today's work on/in the business - Fri 11 October
1. Update my record of time worked. (40mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 55mins)
3. Next sessions with students AK and AS - includes travel time. (2hrs 55mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 55mins)
3. Next sessions with students AK and AS - includes travel time. (2hrs 55mins)
Friday, October 11, 2019
Today's work on/in the business - Thurs 10 October
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 15mins)
3. Next session with student AF - includes travel time. (1hr 45mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 15mins)
3. Next session with student AF - includes travel time. (1hr 45mins)
Thursday, October 10, 2019
Today's work on/in the business - Wed 9 October
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 40mins)
3. Next sessions with students ET and EK - includes travel time. (3hrs 20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 40mins)
3. Next sessions with students ET and EK - includes travel time. (3hrs 20mins)
Wednesday, October 9, 2019
Today's work on/in the business - Tues 8 October
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 25mins)
3. Next sessions with students JH, SH and EH - includes travel time. (4hrs 25mins)
Then we finally made it across for the singing session - lovely to catch up with good friends, but a loooong day!
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 25mins)
3. Next sessions with students JH, SH and EH - includes travel time. (4hrs 25mins)
Then we finally made it across for the singing session - lovely to catch up with good friends, but a loooong day!
Tuesday, October 8, 2019
Today's work on/in the business - Mon 7 October
1. Update my record of time worked. (15mins)
2. Review progress made last week and ensure the schedule is right for this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 45mins)
4. Next sessions with students AZ and SS - includes travel time. (2hrs 45mins)
2. Review progress made last week and ensure the schedule is right for this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 45mins)
4. Next sessions with students AZ and SS - includes travel time. (2hrs 45mins)
Monday, October 7, 2019
Today's work on/in the business - Sun 6 October
1. Recording time. (10mins)
2. Update my record of time worked. (20mins)
No work yesterday - a fun but tiring day out with friends!
2. Update my record of time worked. (20mins)
No work yesterday - a fun but tiring day out with friends!
Sunday, October 6, 2019
Today's work on/in the business - Fri 4 October
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 25mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 25mins)
Friday, October 4, 2019
Today's work on/in the business - Thurs 3 October
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 10mins)
Thursday, October 3, 2019
Today's work on/in the business - Wed 2 October
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 45mins)
3. Backup mail locally. (10mins)
4. Working on process for new Events setup - review events - also investigate editing issue. (15mins)
5. Next session with student EK - includes travel time. (1hr 35mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 45mins)
3. Backup mail locally. (10mins)
4. Working on process for new Events setup - review events - also investigate editing issue. (15mins)
5. Next session with student EK - includes travel time. (1hr 35mins)
Wednesday, October 2, 2019
Today's work on/in the business - Tues 1 October
1. Update my record of time worked. (15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (4hrs 50mins)
3. Next sessions with students SH and EH - includes preparation and travel time. (3hrs 45mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (4hrs 50mins)
3. Next sessions with students SH and EH - includes preparation and travel time. (3hrs 45mins)
Tuesday, October 1, 2019
Today's work on/in the business - Mon 30 September
1. Update my record of time worked (caught up). (7hrs 20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 20mins)
3. Review progress made last week and ensure the schedule is right for this week. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 20mins)
3. Review progress made last week and ensure the schedule is right for this week. (10mins)
Monday, September 30, 2019
Today's work on/in the business - Sun 29 September
1. Recording time. (10mins)
2. Working on process for new Events setup - review events - also investigate editing issue. (40mins)
2. Working on process for new Events setup - review events - also investigate editing issue. (40mins)
Today's work on/in the business - Sat 28 September
1. Next session with student MK - includes travel time. (1hr 40mins)
Today's work on/in the business - Fri 27 September
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 15mins)
Friday, September 27, 2019
Today's work on/in the business - Thurs 26 September
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 5mins)
3. Working on process for new Events setup - review events and enter regular events - also investigate editing issue. (2hrs 5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 5mins)
3. Working on process for new Events setup - review events and enter regular events - also investigate editing issue. (2hrs 5mins)
Thursday, September 26, 2019
Today's work on/in the business - Wed 25 September
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 30mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 30mins)
Wednesday, September 25, 2019
Today's work on/in the business - Tues 24 September
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 10mins)
3. Next sessions with students JH, SH and EH - includes travel time. (5hrs 10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 10mins)
3. Next sessions with students JH, SH and EH - includes travel time. (5hrs 10mins)
Tuesday, September 24, 2019
Today's work on/in the business - Mon 23 September
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (11hrs 30mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (11hrs 30mins)
Monday, September 23, 2019
Today's work on/in the business - Sun 22 September
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs)
Sunday, September 22, 2019
Today's work on/in the business - Sat 21 September
1. Next session with student MK - includes travel time and recording time. (2hrs 25mins)
2. Update my record of time worked. (5mins)
2. Update my record of time worked. (5mins)
Saturday, September 21, 2019
Today's work on/in the business - Fri 20 September
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs)
Friday, September 20, 2019
Today's work on/in the business - Thurs 19 September
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (11hrs 20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (11hrs 20mins)
Thursday, September 19, 2019
Today's work on/in the business - Wed 18 September
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 30mins)
3. Next session with student ET - includes travel time. (1hrs 50mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 30mins)
3. Next session with student ET - includes travel time. (1hrs 50mins)
Wednesday, September 18, 2019
Today's work on/in the business - Tues 17 September
1. Update my record of time worked. (15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 50mins)
3. Next sessions with students SH and EH - includes travel time. (2hrs 55mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 50mins)
3. Next sessions with students SH and EH - includes travel time. (2hrs 55mins)
Tuesday, September 17, 2019
Today's work on/in the business - Mon 16 September
1. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (4hrs 45mins)
2. Next session with student EK - includes travel time. (2hrs)
And added excitement through not checking things out properly....!
2. Next session with student EK - includes travel time. (2hrs)
And added excitement through not checking things out properly....!
Today's work on/in the business - Sun 15 September
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 20mins)
Sunday, September 15, 2019
Today's work on/in the business - Sat 14 September
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 15mins)
3. Recording time. (30mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 15mins)
3. Recording time. (30mins)
Saturday, September 14, 2019
Today's work on/in the business - Fri 13 September
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 5mins)
Friday, September 13, 2019
Today's work on/in the business - Thurs 12 September
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 50mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 50mins)
Thursday, September 12, 2019
Today's work on/in the business - Wed 11 September
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 30mins)
3. Next sessions with students ET and EK - includes travel time. (3hrs 5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 30mins)
3. Next sessions with students ET and EK - includes travel time. (3hrs 5mins)
Wednesday, September 11, 2019
Today's work on/in the business - Tues 10 September
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 5mins)
3. Next sessions with students JH, EH and SH - includes travel time. (4hrs 50mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 5mins)
3. Next sessions with students JH, EH and SH - includes travel time. (4hrs 50mins)
Tuesday, September 10, 2019
Today's work on/in the business - Mon 9 September
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 15mins)
3. Next sessions with students AZ, SS and DW - includes travel time. (4hrs 25mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 15mins)
3. Next sessions with students AZ, SS and DW - includes travel time. (4hrs 25mins)
Monday, September 9, 2019
Today's work on/in the business - Sun 8 September
1. Update my record of time worked. (5mins)
2. Recording time and next session with student LM - includes travel time. (2hrs 25mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (4hrs 45mins)
2. Recording time and next session with student LM - includes travel time. (2hrs 25mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (4hrs 45mins)
Sunday, September 8, 2019
Today's work on/in the business - Sat 7 September
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 15mins)
Saturday, September 7, 2019
Today's work on/in the business - Fri 6 September
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs)
3. Next sessions with students AK and SS - includes travel time. (2hrs 35mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs)
3. Next sessions with students AK and SS - includes travel time. (2hrs 35mins)
Friday, September 6, 2019
Today's work on/in the business - Thurs 5 September
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 5mins)
3. Next session with student AF - includes travel time. (2hrs 15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 5mins)
3. Next session with student AF - includes travel time. (2hrs 15mins)
Thursday, September 5, 2019
Today's work on/in the business - Wed 4 September
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 25mins)
3. Next sessions with students ET and EK - includes travel time. (2hrs 45mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 25mins)
3. Next sessions with students ET and EK - includes travel time. (2hrs 45mins)
Wednesday, September 4, 2019
Today's work on/in the business - Tues 3 September
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 30mins)
3. Next session with student JH - includes travel time. (1hr 55mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 30mins)
3. Next session with student JH - includes travel time. (1hr 55mins)
Tuesday, September 3, 2019
Today's work on/in the business - Mon 2 September
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 30mins)
3. Next sessions with students AZ, AS and DW - includes travel time. (4hrs 30mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 30mins)
3. Next sessions with students AZ, AS and DW - includes travel time. (4hrs 30mins)
Monday, September 2, 2019
Today's work on/in the business - Sun 1 September
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (2hrs 25mins)
3. Next session with student LM - includes travel time. (2hrs 20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (2hrs 25mins)
3. Next session with student LM - includes travel time. (2hrs 20mins)
Sunday, September 1, 2019
Today's work on/in the business - Sat 31 August
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 50mins)
3. Recording time. (30mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 50mins)
3. Recording time. (30mins)
Saturday, August 31, 2019
Today's work on/in the business - Fri 30 August
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 25mins)
3. Next session with student AK - includes travel time. (1hr 55mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 25mins)
3. Next session with student AK - includes travel time. (1hr 55mins)
Friday, August 30, 2019
Today's work on/in the business - Thurs 29 August
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (13hrs)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (13hrs)
Thursday, August 29, 2019
Today's work on/in the business - Wed 28 August
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 35mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 35mins)
Wednesday, August 28, 2019
Today's work on/in the business - Tues 27 August
1. Update my record of time worked. (15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 25mins)
3. Next sessions with students JH, SH and EH - includes travel time. (4hrs 10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 25mins)
3. Next sessions with students JH, SH and EH - includes travel time. (4hrs 10mins)
Tuesday, August 27, 2019
Today's work on/in the business - Mon 26 August
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 40mins)
3. Working on process for new Events setup - review events and enter regular events - also investigate editing issue. (3hrs 25mins)
4. Next sessions with students AZ, SS and DW - includes preparation and travel time. (4hrs 35mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 40mins)
3. Working on process for new Events setup - review events and enter regular events - also investigate editing issue. (3hrs 25mins)
4. Next sessions with students AZ, SS and DW - includes preparation and travel time. (4hrs 35mins)
Monday, August 26, 2019
Today's work on/in the business - Sun 25 August
1. Update my record of time worked. (5mins)
2. Recording time. (45mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 20mins)
2. Recording time. (45mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 20mins)
Sunday, August 25, 2019
Today's work on/in the business - Sat 24 August
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 55mins)
3. Next session with student MK - includes travel time. (1hr 20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 55mins)
3. Next session with student MK - includes travel time. (1hr 20mins)
Saturday, August 24, 2019
Today's work on/in the business - Fri 23 August
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 35mins)
3. Next session with student AS - includes travel time. (2hrs 20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 35mins)
3. Next session with student AS - includes travel time. (2hrs 20mins)
Friday, August 23, 2019
Today's work on/in the business - Thurs 22 August
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 35mins)
3. Next session with student AF - includes travel time. (2hrs 25mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 35mins)
3. Next session with student AF - includes travel time. (2hrs 25mins)
Thursday, August 22, 2019
Today's work on/in the business - Wed 21 August
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 10mins)
3. Next sessions with students ET and EK - includes travel time. (2hrs 40mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 10mins)
3. Next sessions with students ET and EK - includes travel time. (2hrs 40mins)
Wednesday, August 21, 2019
Today's work on/in the business - Tues 20 August
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 50mins)
3. Next sessions with students JH, SH and EH - includes travel time. (4hrs 25mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 50mins)
3. Next sessions with students JH, SH and EH - includes travel time. (4hrs 25mins)
Tuesday, August 20, 2019
Today's work on/in the business - Mon 19 August
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs)
3. Next sessions with students AZ and SS - includes travel time. (3hrs 5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs)
3. Next sessions with students AZ and SS - includes travel time. (3hrs 5mins)
Monday, August 19, 2019
Today's work on/in the business - Sun 18 August
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 25mins)
3. Next session with student LM - includes travel time. (1hr 50mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 25mins)
3. Next session with student LM - includes travel time. (1hr 50mins)
Sunday, August 18, 2019
Today's work on/in the business - Sat 17 August
1. Next session with student MK - includes travel time and recording time. (2hrs)
2. Update my record of time worked. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (3hrs 15mins)
2. Update my record of time worked. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (3hrs 15mins)
Saturday, August 17, 2019
Today's work on/in the business - Fri 16 August
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 50mins)
3. Next session with student AK - includes travel time. (1hrs 35mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 50mins)
3. Next session with student AK - includes travel time. (1hrs 35mins)
Friday, August 16, 2019
Today's work on/in the business - Thurs 15 August
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 10mins)
Thursday, August 15, 2019
Today's work on/in the business - Wed 14 August
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 25mins)
3. Next session with student ET - includes travel time. (1hr 45mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 25mins)
3. Next session with student ET - includes travel time. (1hr 45mins)
Wednesday, August 14, 2019
Today's work on/in the business - Tues 13 August
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 40mins)
3. Next sessions with students JH, SH and EH - includes travel time. (4hrs 30mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 40mins)
3. Next sessions with students JH, SH and EH - includes travel time. (4hrs 30mins)
Tuesday, August 13, 2019
Today's work on/in the business - Mon 12 August
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 5mins)
3. Backup mail locally. (5mins)
4. Next session with student AZ - includes travel time. (1hr 50mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 5mins)
3. Backup mail locally. (5mins)
4. Next session with student AZ - includes travel time. (1hr 50mins)
Monday, August 12, 2019
Today's work on/in the business - Sun 11 August
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (4hrs 25mins)
3. Next sessions with students LM and MK - includes travel time. (3hrs)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (4hrs 25mins)
3. Next sessions with students LM and MK - includes travel time. (3hrs)
Sunday, August 11, 2019
Today's work on/in the business - Sat 10 August
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (2hrs 55mins)
3. First session with student MP - includes preparation and travel time as well as recording time. (4hrs 25mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (2hrs 55mins)
3. First session with student MP - includes preparation and travel time as well as recording time. (4hrs 25mins)
Saturday, August 10, 2019
Today's work on/in the business - Fri 9 August
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs)
3. Next sessions with student AK and AS - includes travel time. (3hrs 35mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs)
3. Next sessions with student AK and AS - includes travel time. (3hrs 35mins)
Friday, August 9, 2019
Today's work on/in the business - Thurs 8 August
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 25mins)
3. Next session with student AF - includes travel time. (2hrs 5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 25mins)
3. Next session with student AF - includes travel time. (2hrs 5mins)
Thursday, August 8, 2019
Today's work on/in the business - Wed 7 August
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 35mins)
3. Working on process for new Events setup - review events. (50mins)
4. Next sessions with students ET and EK - includes travel time. (3hrs)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 35mins)
3. Working on process for new Events setup - review events. (50mins)
4. Next sessions with students ET and EK - includes travel time. (3hrs)
Wednesday, August 7, 2019
Today's work on/in the business - Tues 6 August
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 40mins)
3. Working on process for new Events setup - review events. (50mins)
4. Next sessions with students EH and SH - includes travel time. (4hrs)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 40mins)
3. Working on process for new Events setup - review events. (50mins)
4. Next sessions with students EH and SH - includes travel time. (4hrs)
Tuesday, August 6, 2019
Today's work on/in the business - Mon 5 August
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 15mins)
3. Next sessions with student AZ, SS and DW - includes travel time. (4hrs 20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 15mins)
3. Next sessions with student AZ, SS and DW - includes travel time. (4hrs 20mins)
Monday, August 5, 2019
Today's work on/in the business - Sun 4 August
1. Update my record of time worked. (25mins)
2. Recording time and next session with student LM. (25mins)
2. Recording time and next session with student LM. (25mins)
Sunday, August 4, 2019
Today's work on/in the business - Sat 3 August
1. Next sessions with students MK and LM - includes preparation and travel time. (3hrs 30mins)
2. Update my record of time worked. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (1hr 50mins)
2. Update my record of time worked. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (1hr 50mins)
Saturday, August 3, 2019
Today's work on/in the business - Fri 2 August
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 45mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 45mins)
Friday, August 2, 2019
Today's work on/in the business - Thurs 1 August
1. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 10mins)
2. Update my record of time worked. (45mins)
3. Review progress made last week and ensure the schedule is right for this week. (10mins)
4. Working on process for new Events setup - review events. (5mins)
5. Next session with student AF - includes travel time. (1hr 50mins)
2. Update my record of time worked. (45mins)
3. Review progress made last week and ensure the schedule is right for this week. (10mins)
4. Working on process for new Events setup - review events. (5mins)
5. Next session with student AF - includes travel time. (1hr 50mins)
Thursday, August 1, 2019
Today's work on/in the business - Wed 31 July
1. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 50mins)
2. Update my record of time worked. (5mins)
3. Working on process for new Events setup - review events. (5mins)
4. Next sessions with student ET and EK - includes travel time. (2hrs 50mins)
2. Update my record of time worked. (5mins)
3. Working on process for new Events setup - review events. (5mins)
4. Next sessions with student ET and EK - includes travel time. (2hrs 50mins)
Wednesday, July 31, 2019
Today's work on/in the business - Tues 30 July
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 30mins)
3. Next sessions with student JH, SH and EH - includes travel time. (4hrs 15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 30mins)
3. Next sessions with student JH, SH and EH - includes travel time. (4hrs 15mins)
Tuesday, July 30, 2019
Today's work on/in the business - Mon 29 July
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 35mins)
3. Working on process for new Events setup - review events. (10mins)
4. Next sessions with student AZ, SS and DW - includes travel time. (5hrs)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 35mins)
3. Working on process for new Events setup - review events. (10mins)
4. Next sessions with student AZ, SS and DW - includes travel time. (5hrs)
Monday, July 29, 2019
Today's work on/in the business - Sun 28 July
1. Recording time and next session with student LM - includes travel time. (2hrs 30mins)
2. Update my record of time worked. (55mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (1hr 55mins)
2. Update my record of time worked. (55mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (1hr 55mins)
Sunday, July 28, 2019
Today's work on/in the business - Sat 27 July
1. Next session with student MK - includes travel time. (1hr 20mins)
2. Working on process for new Events setup - review events and enter regular events. (1hr)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (2hrs 50mins)
2. Working on process for new Events setup - review events and enter regular events. (1hr)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (2hrs 50mins)
Today's work on/in the business - Fri 26 July
1. Update my record of time worked. (5mins)
2. Accounting. (4hrs 15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (1hr 15mins)
4. BAS. (25mins)
5. Next sessions with student AK and AS - includes preparation and travel time. (2hrs 55mins)
2. Accounting. (4hrs 15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (1hr 15mins)
4. BAS. (25mins)
5. Next sessions with student AK and AS - includes preparation and travel time. (2hrs 55mins)
Friday, July 26, 2019
Today's work on/in the business - Thurs 25 July
1. Update my record of time worked. (5mins)
2. Organise first session with student AF and have first session with student AF - includes preparation and travel time. (2hrs 10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 25mins)
2. Organise first session with student AF and have first session with student AF - includes preparation and travel time. (2hrs 10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 25mins)
Thursday, July 25, 2019
Today's work on/in the business - Wed 24 July
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs)
3. First session with student ET and next session with student EK - includes preparation and travel time. (3hrs 15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs)
3. First session with student ET and next session with student EK - includes preparation and travel time. (3hrs 15mins)
Wednesday, July 24, 2019
Today's work on/in the business - Tues 23 July
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 40mins)
3. Next session with student JH - includes travel time. (2hrs 35mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 40mins)
3. Next session with student JH - includes travel time. (2hrs 35mins)
Tuesday, July 23, 2019
Today's work on/in the business - Mon 22 July
1. Update my record of time worked. (50mins)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Backup mail locally. (5mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 35mins)
5. Next sessions with students AZ, SS and DW - includes travel time. (4hrs 15mins)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Backup mail locally. (5mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 35mins)
5. Next sessions with students AZ, SS and DW - includes travel time. (4hrs 15mins)
Monday, July 22, 2019
Today's work on/in the business - Sun 21 July
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (2hrs)
3. Next session with student LM - includes preparation and travel time. (2hrs 30mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (2hrs)
3. Next session with student LM - includes preparation and travel time. (2hrs 30mins)
Sunday, July 21, 2019
Today's work on/in the business - Sat 20 July
1. Next session with student MK - includes travel time - and recording time. (2hrs)
2. Update my record of time worked. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 55mins)
2. Update my record of time worked. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 55mins)
Saturday, July 20, 2019
Today's work on/in the business - Fri 19 July
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 10mins)
3. Next session with student AK - includes travel time. (1hr 40mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 10mins)
3. Next session with student AK - includes travel time. (1hr 40mins)
Friday, July 19, 2019
Today's work on/in the business - Thurs 18 July
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 50mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 50mins)
Thursday, July 18, 2019
Today's work on/in the business - Wed 17 July
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 40mins)
3. Next session with student EK - includes travel time. (1hr 55mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 40mins)
3. Next session with student EK - includes travel time. (1hr 55mins)
Wednesday, July 17, 2019
Today's work on/in the business - Tues 16 July
1. Backup mail locally. (25mins)
2. Update my record of time worked. (30mins)
3. Review progress made last week and ensure the schedule is right for this week. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 10mins)
5. Next session with student EH - includes travel time. (1hr 40mins)
2. Update my record of time worked. (30mins)
3. Review progress made last week and ensure the schedule is right for this week. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 10mins)
5. Next session with student EH - includes travel time. (1hr 40mins)
Tuesday, July 16, 2019
Today's work on/in the business - Mon 15 July
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 10mins)
3. Next sessions with students JH and AZ - includes travel time. (3hrs 15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 10mins)
3. Next sessions with students JH and AZ - includes travel time. (3hrs 15mins)
Monday, July 15, 2019
Today's work on/in the business - Sun 14 July
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 20mins)
Sunday, July 14, 2019
Today's work on/in the business - Sat 13 July
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 10mins)
3. Recording time. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 10mins)
3. Recording time. (5mins)
Saturday, July 13, 2019
Today's work on/in the business - Fri 12 July
1. Update my record of time worked. (25mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (11hrs 20mins)
3. Install Thunderbird on new laptop - but no connection to svr2. (15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (11hrs 20mins)
3. Install Thunderbird on new laptop - but no connection to svr2. (15mins)
Friday, July 12, 2019
Today's work on/in the business - Thurs 11 July
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 45mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 45mins)
Thursday, July 11, 2019
Today's work on/in the business - Wed 10 July
1. Update my record of time worked. (20mins)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 35mins)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 35mins)
Wednesday, July 10, 2019
Today's work on/in the business - Tues 9 July
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 40mins)
3. Next session with student JH - includes travel time and preparation time for EK. (2hrs 10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 40mins)
3. Next session with student JH - includes travel time and preparation time for EK. (2hrs 10mins)
Tuesday, July 9, 2019
Today's work on/in the business - Mon 8 July
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (11hrs 20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (11hrs 20mins)
Monday, July 8, 2019
Today's work on/in the business - Sun 7 July
1. Update my record of time worked. (15mins)
2. Recording time. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs)
2. Recording time. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs)
Sunday, July 7, 2019
Today's work on/in the business - Sat 6 July
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 20mins)
Saturday, July 6, 2019
Today's work on/in the business - Fri 5 July
1. Update my record of time worked. (35mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 55mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 55mins)
Friday, July 5, 2019
Today's work on/in the business - Thurs 4 July
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 10mins)
Thursday, July 4, 2019
Today's work on/in the business - Wed 3 July
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 40mins)
3. Working on process for new Events setup - review events. (10mins)
4. Next session with student EK - includes travel time. (2hrs)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 40mins)
3. Working on process for new Events setup - review events. (10mins)
4. Next session with student EK - includes travel time. (2hrs)
Wednesday, July 3, 2019
Today's work on/in the business - Tues 2 July
1. Update my record of time worked. (15mins)
2. Review progress made last week and ensure the schedule is right for this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 50mins)
4. Next session with student JH - includes travel time. (2hrs 10mins)
2. Review progress made last week and ensure the schedule is right for this week. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 50mins)
4. Next session with student JH - includes travel time. (2hrs 10mins)
Tuesday, July 2, 2019
Today's work on/in the business - Mon 1 July
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 25mins)
3. Working on process for new Events setup - review events and enter regular events. (50mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 25mins)
3. Working on process for new Events setup - review events and enter regular events. (50mins)
Monday, July 1, 2019
Today's work on/in the business - Sun 30 June
1. Update my record of time worked. (15mins)
2. Recording time and next session with student LM - includes preparation and travel time. (2hrs 35mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 30mins)
2. Recording time and next session with student LM - includes preparation and travel time. (2hrs 35mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 30mins)
Sunday, June 30, 2019
Today's work on/in the business - Sat 29 June
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 45mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 45mins)
Saturday, June 29, 2019
Today's work on/in the business - Fri 28 June
1. Update my record of time worked. (15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 15mins)
Friday, June 28, 2019
Today's work on/in the business - Thurs 27 June
1. Update my record of time worked. (1hr 25mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 50mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 50mins)
Thursday, June 27, 2019
Today's work on/in the business - Wed 26 June
1. Update my record of time worked. (2hrs 40mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 30mins)
3. Next session with student EK - includes travel time. (1hr 45mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 30mins)
3. Next session with student EK - includes travel time. (1hr 45mins)
Wednesday, June 26, 2019
Today's work on/in the business - Tues 25 June
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 20mins)
3. Next sessions with students SH and EH - includes travel time. (2hrs 40mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 20mins)
3. Next sessions with students SH and EH - includes travel time. (2hrs 40mins)
Tuesday, June 25, 2019
Today's work on/in the business - Mon 24 June
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 25mins)
3. Next session with student DW - includes travel time. (2hrs 15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 25mins)
3. Next session with student DW - includes travel time. (2hrs 15mins)
Monday, June 24, 2019
Today's work on/in the business - Sun 23 June
1. Recording time. (20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (4hrs 45mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (4hrs 45mins)
Today's work on/in the business - Sat 22 June
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 20mins)
3. Next session with student MK - includes travel time. (1hr 30mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 20mins)
3. Next session with student MK - includes travel time. (1hr 30mins)
Saturday, June 22, 2019
Today's work on/in the business - Fri 21 June
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 45mins)
3. Next sessions with students AK and AS - includes travel time. (3hrs)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 45mins)
3. Next sessions with students AK and AS - includes travel time. (3hrs)
Friday, June 21, 2019
Today's work on/in the business - Thurs 20 June
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (11hrs 55mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (11hrs 55mins)
Thursday, June 20, 2019
Today's work on/in the business - Wed 19 June
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (11hrs 55mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (11hrs 55mins)
Wednesday, June 19, 2019
Today's work on/in the business - Tues 18 June
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 20mins)
3. Next sessions with students JH, SH and EH - includes travel time. (4hrs 45mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 20mins)
3. Next sessions with students JH, SH and EH - includes travel time. (4hrs 45mins)
Tuesday, June 18, 2019
Today's work on/in the business - Mon 17 June
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 35mins)
3. Next sessions with students AZ and SS - includes travel time. (3hrs 5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 35mins)
3. Next sessions with students AZ and SS - includes travel time. (3hrs 5mins)
Monday, June 17, 2019
Today's work on/in the business - Sun 16 June
1. Update my record of time worked. (5mins)
2. Recording time and next session with student LM - includes travel time. (2hrs 40mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 15mins)
2. Recording time and next session with student LM - includes travel time. (2hrs 40mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 15mins)
Sunday, June 16, 2019
Today's work on/in the business - Sat 15 June
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 45mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 45mins)
Saturday, June 15, 2019
Today's work on/in the business - Fri 14 June
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 15mins)
3. Next session with student AS - includes travel time. (1hr 50mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 15mins)
3. Next session with student AS - includes travel time. (1hr 50mins)
Friday, June 14, 2019
Today's work on/in the business - Thurs 13 June
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (12hrs)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (12hrs)
Thursday, June 13, 2019
Today's work on/in the business - Wed 12 June
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 10mins)
3. Next sessions with students AK and EK - includes travel time. (3hrs 10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 10mins)
3. Next sessions with students AK and EK - includes travel time. (3hrs 10mins)
Wednesday, June 12, 2019
Today's work on/in the business - Tues 11 June
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 55mins)
3. Next sessions with students JH and AZ - includes travel time. (3hrs 40mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 55mins)
3. Next sessions with students JH and AZ - includes travel time. (3hrs 40mins)
Tuesday, June 11, 2019
Today's work on/in the business - Mon 10 June
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 50mins)
3. Next session with student DW - includes travel time. (2hrs 25mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 50mins)
3. Next session with student DW - includes travel time. (2hrs 25mins)
Monday, June 10, 2019
Today's work on/in the business - Sun 9 June
1. Update my record of time worked. (5mins)
2. Recording time and next session with student LM - includes preparation and travel time. (2hrs 25mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 20mins)
2. Recording time and next session with student LM - includes preparation and travel time. (2hrs 25mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 20mins)
Sunday, June 9, 2019
Today's work on/in the business - Sat 8 June
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 30mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 30mins)
Saturday, June 8, 2019
Today's work on/in the business - Fri 7 June
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs)
3. Next session with student AK - includes travel time. (2hrs 10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs)
3. Next session with student AK - includes travel time. (2hrs 10mins)
Friday, June 7, 2019
Today's work on/in the business - Thurs 6 June
1. Update my record of time worked. (30mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 50mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 50mins)
Thursday, June 6, 2019
Today's work on/in the business - Wed 5 June
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 50mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 50mins)
Wednesday, June 5, 2019
Today's work on/in the business - Tues 4 June
1. Update my record of time worked. (10mins)
2. Working on process for new Events setup - review events. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 55mins)
2. Working on process for new Events setup - review events. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 55mins)
Tuesday, June 4, 2019
Today's work on/in the business - Mon 3 June
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 25mins)
3. Next sessions with students AZ, SS and DW - includes travel time. (4hrs 35mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 25mins)
3. Next sessions with students AZ, SS and DW - includes travel time. (4hrs 35mins)
Monday, June 3, 2019
Today's work on/in the business - Sun 2 June
1. Update my record of time worked. (20mins)
2. Recording time. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 35mins)
2. Recording time. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 35mins)
Sunday, June 2, 2019
Today's work on/in the business - Sat 1 June
1. Next session with student MK - includes travel time. (1hr 20mins)
2. Working on process for new Events setup - review events. (20mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 50mins)
2. Working on process for new Events setup - review events. (20mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 50mins)
Today's work on/in the business - Fri 31 May
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 30mins)
3. Next session with student AK - includes travel time. (1hr 30mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 30mins)
3. Next session with student AK - includes travel time. (1hr 30mins)
Friday, May 31, 2019
Today's work on/in the business - Thurs 30 May
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 10mins)
3. Next session with student AK - includes travel time. (1hr 50mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 10mins)
3. Next session with student AK - includes travel time. (1hr 50mins)
Thursday, May 30, 2019
Today's work on/in the business - Wed 29 May
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (12hrs 10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (12hrs 10mins)
Wednesday, May 29, 2019
Today's work on/in the business - Tues 28 May
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 25mins)
3. Next sessions with students JH, SH and EH - includes travel time. (4hrs 30mins)
4. Working on process for new Events setup - review events and enter regular events. (15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 25mins)
3. Next sessions with students JH, SH and EH - includes travel time. (4hrs 30mins)
4. Working on process for new Events setup - review events and enter regular events. (15mins)
Tuesday, May 28, 2019
Today's work on/in the business - Mon 27 May
1. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (11hrs 35mins)
2. Update my record of time worked. (10mins)
3. Next session with student DW - includes preparation and travel time. (2hrs 5mins)
2. Update my record of time worked. (10mins)
3. Next session with student DW - includes preparation and travel time. (2hrs 5mins)
Monday, May 27, 2019
Today's work on/in the business - Sun 26 May
1. Recording time and next session with student LM - includes travel time. (2hrs 40mins)
Today's work on/in the business - Sat 25 May
1. Next sessions with students EK and MK - includes travel time. (2hrs 40mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 55mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 55mins)
Today's work on/in the business - Fri 24 May
1. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (11hrs)
Today's work on/in the business - Thurs 23 May
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 55mins)
3. Next session with student AK - includes travel time. (1hr 45mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 55mins)
3. Next session with student AK - includes travel time. (1hr 45mins)
Thursday, May 23, 2019
Today's work on/in the business - Wed 22 May
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 50mins)
3. Next session with student EK - includes travel time. (1hr 55mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 50mins)
3. Next session with student EK - includes travel time. (1hr 55mins)
Wednesday, May 22, 2019
Today's work on/in the business - Tues 21 May
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 50mins)
3. Next session with student JH - includes travel time. (2hrs 20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 50mins)
3. Next session with student JH - includes travel time. (2hrs 20mins)
Tuesday, May 21, 2019
Today's work on/in the business - Mon 20 May
1. Update my record of time worked. (15mins)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 50mins)
4. Next sessions with student AZ and SS - includes travel time. (3hrs)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 50mins)
4. Next sessions with student AZ and SS - includes travel time. (3hrs)
Monday, May 20, 2019
Today's work on/in the business - Sun 19 May
1. Update my record of time worked. (1hr 5mins)
2. Recording time and next session with student LM - includes travel time. (2hrs 25mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (3hrs 55mins)
2. Recording time and next session with student LM - includes travel time. (2hrs 25mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (3hrs 55mins)
Sunday, May 19, 2019
Today's work on/in the business - Sat 18 May
1. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 50mins)
2. Next session with student MK - includes travel time. (1hr 30mins)
2. Next session with student MK - includes travel time. (1hr 30mins)
Today's work on/in the business - Fri 17 May
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 20mins)
3. Next sessions with students AK and AS - includes preparation and travel time. (3hrs)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 20mins)
3. Next sessions with students AK and AS - includes preparation and travel time. (3hrs)
Friday, May 17, 2019
Today's work on/in the business - Thurs 16 May
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 55mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 55mins)
Thursday, May 16, 2019
Today's work on/in the business - Wed 15 May
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 50mins)
3. Next session with student EK - includes travel time. (1hr 30mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 50mins)
3. Next session with student EK - includes travel time. (1hr 30mins)
Wednesday, May 15, 2019
Today's work on/in the business - Tues 14 May
1. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 50mins)
2. Update my record of time worked. (5mins)
3. Next sessions with students JH, SH and EH - includes travel time. (4hrs 20mins)
2. Update my record of time worked. (5mins)
3. Next sessions with students JH, SH and EH - includes travel time. (4hrs 20mins)
Tuesday, May 14, 2019
Today's work on/in the business - Mon 13 May
1. Update my record of time worked. (15mins)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 30mins)
4. Next sessions with student AZ and SS - includes travel time. (3hrs 10mins)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 30mins)
4. Next sessions with student AZ and SS - includes travel time. (3hrs 10mins)
Monday, May 13, 2019
Today's work on/in the business - Sun 12 May
1. Update my record of time worked. (35mins)
2. Recording time and next session with student LM - includes travel time. (2hrs 5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (1hr 15mins)
2. Recording time and next session with student LM - includes travel time. (2hrs 5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (1hr 15mins)
Sunday, May 12, 2019
Today's work on/in the business - Sat 11 May
1. Next session with student MK - includes travel time. (1hr 20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 15mins)
Today's work on/in the business - Fri 10 May
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 30mins)
3. Next sessions with students AK and AS - includes travel time. (3hrs 10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 30mins)
3. Next sessions with students AK and AS - includes travel time. (3hrs 10mins)
Friday, May 10, 2019
Today's work on/in the business - Thurs 9 May
1. Update my record of time worked. (15mins)
2. Working on process for new Events setup - review events. (40mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 15mins)
4. Next session with student JH - includes travel time. (1hr 50mins)
2. Working on process for new Events setup - review events. (40mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 15mins)
4. Next session with student JH - includes travel time. (1hr 50mins)
Thursday, May 9, 2019
Today's work on/in the business - Wed 8 May
1. Update my record of time worked. (15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 25mins)
3. Next session with student EK - includes travel time. (1hr 30mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 25mins)
3. Next session with student EK - includes travel time. (1hr 30mins)
Wednesday, May 8, 2019
Today's work on/in the business - Tues 7 May
1. Update my record of time worked. (15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 40mins)
3. Working on process for new Events setup - review events. (5mins)
4. Next session with students SH and EH - includes preparation and travel time. (2hrs 40mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 40mins)
3. Working on process for new Events setup - review events. (5mins)
4. Next session with students SH and EH - includes preparation and travel time. (2hrs 40mins)
Tuesday, May 7, 2019
Today's work on/in the business - Mon 6 May
1. Update my record of time worked. (10mins)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 30mins)
4. Next sessions with student AZ and DW - includes travel time. (3hrs)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 30mins)
4. Next sessions with student AZ and DW - includes travel time. (3hrs)
Monday, May 6, 2019
Today's work on/in the business - Sun 5 May
1. Next session with student LM - includes preparation and travel time as well as recording time. (3hrs 15mins)
2. Update my record of time worked. (1hr 15mins)
2. Update my record of time worked. (1hr 15mins)
Sunday, May 5, 2019
Today's work on/in the business - Sat 4 May
1. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 35mins)
2. Next session with student MK - includes travel time. (1hr 5mins)
2. Next session with student MK - includes travel time. (1hr 5mins)
Today's work on/in the business - Fri 3 May
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 25mins)
3. Next sessions with students AK and AS - includes travel time. (3hrs 15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 25mins)
3. Next sessions with students AK and AS - includes travel time. (3hrs 15mins)
Friday, May 3, 2019
Today's work on/in the business - Thurs 2 May
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 40mins)
3. Working on process for new Events setup - review events. (15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 40mins)
3. Working on process for new Events setup - review events. (15mins)
Thursday, May 2, 2019
Today's work on/in the business - Wed 1 May
1. Update my record of time worked. (10mins)
2. Working on process for new Events setup - review events. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 55mins)
2. Working on process for new Events setup - review events. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 55mins)
Wednesday, May 1, 2019
Today's work on/in the business - Tues 30 April
1. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 15mins)
2. Working on process for new Events setup - review events. (20mins)
3. Next sessions with students JH, SH and EH - includes preparation and travel time. (5hrs 15mins)
2. Working on process for new Events setup - review events. (20mins)
3. Next sessions with students JH, SH and EH - includes preparation and travel time. (5hrs 15mins)
Today's work on/in the business - Mon 29 April
1. Update my record of time worked. (40mins)
2. Review progress made last week and ensure the schedule is right for this week. (10mins)
3. Working on process for new Events setup - review events and enter regular events. (35mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (4hrs 40mins)
5. Next sessions with student AZ and DW - includes travel time. (3hrs 15mins)
2. Review progress made last week and ensure the schedule is right for this week. (10mins)
3. Working on process for new Events setup - review events and enter regular events. (35mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (4hrs 40mins)
5. Next sessions with student AZ and DW - includes travel time. (3hrs 15mins)
Monday, April 29, 2019
Today's work on/in the business - Sun 28 April
1. Recording time and next session with student LM - includes preparation and travel time. (2hrs 10mins)
Today's work on/in the business - Sat 27 April
1. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (3hrs 45mins)
2. Anti virus scan on laptop. (2hrs 35mins)
2. Anti virus scan on laptop. (2hrs 35mins)
Today's work on/in the business - Fri 26 April
1. Update my record of time worked. (45mins)
2. Accounting. (1hr 30mins)
3. BAS. (30mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (2hrs 25mins)
5. Next session with student AK - includes travel time and time to purchase new supplies. (2hrs 30mins)
2. Accounting. (1hr 30mins)
3. BAS. (30mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (2hrs 25mins)
5. Next session with student AK - includes travel time and time to purchase new supplies. (2hrs 30mins)
Friday, April 26, 2019
Today's work on/in the business - Thurs 25 April
1. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 50mins)
Today's work on/in the business - Wed 24 April
1. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (14hrs 55mins)
2. Next session with student EK - includes travel time. (1hr 40mins)
2. Next session with student EK - includes travel time. (1hr 40mins)
Today's work on/in the business - Tues 23 April
1. Update my record of time worked. (20mins)
2. Review progress made last week and ensure the schedule is right for this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 45mins)
4. Next session with student JH, EH and SH - includes travel time. (3hrs 55mins)
2. Review progress made last week and ensure the schedule is right for this week. (10mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 45mins)
4. Next session with student JH, EH and SH - includes travel time. (3hrs 55mins)
Tuesday, April 23, 2019
Today's work on/in the business - Mon 22 April
1. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (2hrs 55mins)
Today's work on/in the business - Sun 21 April
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 15mins)
Sunday, April 21, 2019
Today's work on/in the business - Sat 20 April
1. Update my record of time worked - including clearing space on other laptop. (55mins)
2. Recording time. (5mins)
2. Recording time. (5mins)
Saturday, April 20, 2019
Today's work on/in the business - Fri 19 April
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 50mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 50mins)
Friday, April 19, 2019
Today's work on/in the business - Thurs 18 April
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 10mins)
Thursday, April 18, 2019
Today's work on/in the business - Wed 17 April
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 25mins)
3. Next session with student EK - includes travel time. (1hr 55mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 25mins)
3. Next session with student EK - includes travel time. (1hr 55mins)
Wednesday, April 17, 2019
Today's work on/in the business - Tues 16 April
1. Update my record of time worked. (15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (11hrs)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (11hrs)
Tuesday, April 16, 2019
Today's work on/in the business - Mon 15 April
1. Update my record of time worked. (10mins)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Backup mail locally. (25mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 40mins)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Backup mail locally. (25mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 40mins)
Monday, April 15, 2019
Today's work on/in the business - Fri 12 April
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (11hrs 50mins)
3. Recording time. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (11hrs 50mins)
3. Recording time. (5mins)
Friday, April 12, 2019
Today's work on/in the business - Thurs 11 April
1. Update my record of time worked. (15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 25mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 25mins)
Thursday, April 11, 2019
Today's work on/in the business - Wed 10 April
1. Update my record of time worked. (25mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 20mins)
Wednesday, April 10, 2019
Today's work on/in the business - Tues 9 April
1. Update my record of time worked. (20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 50mins)
3. Next session with student JH - includes travel time. (2hrs 10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 50mins)
3. Next session with student JH - includes travel time. (2hrs 10mins)
Tuesday, April 9, 2019
Today's work on/in the business - Mon 8 April
1. Update my record of time worked. (5mins)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Backup mail locally. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 15mins)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Backup mail locally. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 15mins)
Monday, April 8, 2019
Today's work on/in the business - Sun 7 April
1. Update my record of time worked. (15mins)
2. Recording time. (20mins)
2. Recording time. (20mins)
Sunday, April 7, 2019
Today's work on/in the business - Sat 6 April
1. Next sessions with students MK and LM - includes travel time. (3hrs 20mins)
Today's work on/in the business - Fri 5 April
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 55mins)
3. Next session with student AK - includes travel time. (1hr 20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 55mins)
3. Next session with student AK - includes travel time. (1hr 20mins)
Friday, April 5, 2019
Today's work on/in the business - Thurs 4 April
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 50mins)
3. Accounting. (25mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 50mins)
3. Accounting. (25mins)
Thursday, April 4, 2019
Today's work on/in the business - Wed 3 April
1. Update my record of time worked. (20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 35mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 35mins)
Wednesday, April 3, 2019
Today's work on/in the business - Tues 2 April
1. Update my record of time worked. (15mins)
2. Working on process for new Events setup - review events. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 25mins)
4. Next sessions with students JH, EH and SH - includes travel time. (4hrs 40mins)
2. Working on process for new Events setup - review events. (5mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 25mins)
4. Next sessions with students JH, EH and SH - includes travel time. (4hrs 40mins)
Tuesday, April 2, 2019
Today's work on/in the business - Mon 1 April
1. Update my record of time worked. (15mins)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Backup mail locally. (5mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 30mins)
5. Next session with student DW - includes travel time. (1hr 45mins)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Backup mail locally. (5mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 30mins)
5. Next session with student DW - includes travel time. (1hr 45mins)
Monday, April 1, 2019
Today's work on/in the business - Sun 31 March
1. Update my record of time worked. (25mins)
2. Recording time. (30mins)
2. Recording time. (30mins)
Sunday, March 31, 2019
Today's work on/in the business - Sat 30 March
1. Next sessions with students MK and LM - includes travel time. (3hrs 15mins)
Today's work on/in the business - Fri 29 March
1. Update my record of time worked. (20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 10mins)
3. Next session with student AS - includes travel time. (2hrs)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 10mins)
3. Next session with student AS - includes travel time. (2hrs)
Friday, March 29, 2019
Today's work on/in the business - Thurs 28 March
1. Update my record of time worked. (15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 45mins)
3. Working on process for new Events setup - review events and enter regular events. (40mins)
4. Next session with student SS - includes travel time. (1hr 20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 45mins)
3. Working on process for new Events setup - review events and enter regular events. (40mins)
4. Next session with student SS - includes travel time. (1hr 20mins)
Thursday, March 28, 2019
Today's work on/in the business - Wed 27 March
1. Update my record of time worked. (15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs)
3. Next sessions with students EK and AK - includes travel time. (2hrs 50mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs)
3. Next sessions with students EK and AK - includes travel time. (2hrs 50mins)
Wednesday, March 27, 2019
Today's work on/in the business - Tues 26 March
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 30mins)
3. Next sessions with students JH, EH and SH - includes travel time. (4hrs 35mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 30mins)
3. Next sessions with students JH, EH and SH - includes travel time. (4hrs 35mins)
Tuesday, March 26, 2019
Today's work on/in the business - Mon 25 March
1. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs)
2. Update my record of time worked. (5mins)
3. Review progress made last week and ensure the schedule is right for this week. (10mins)
4. Backup mail locally. (10mins)
5. Next sessions with students AZ and DW - includes travel time. (3hrs 20mins)
2. Update my record of time worked. (5mins)
3. Review progress made last week and ensure the schedule is right for this week. (10mins)
4. Backup mail locally. (10mins)
5. Next sessions with students AZ and DW - includes travel time. (3hrs 20mins)
Monday, March 25, 2019
Today's work on/in the business - Sun 24 March
1. Update my record of time worked. (40mins)
2. Recording time. (25mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 30mins)
2. Recording time. (25mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 30mins)
Sunday, March 24, 2019
Today's work on/in the business - Sat 23 March
1. Next session with student MK - includes travel time. (1hr 25mins)
Today's work on/in the business - Fri 22 March
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 50mins)
3. Next session with student SS - includes travel time. (2hrs 10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 50mins)
3. Next session with student SS - includes travel time. (2hrs 10mins)
Friday, March 22, 2019
Today's work on/in the business - Thurs 21 March
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (11hrs 5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (11hrs 5mins)
Thursday, March 21, 2019
Today's work on/in the business - Wed 20 March
1. Update my record of time worked. (15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 40mins)
3. Next session with student EK - includes travel time. (1hr 45mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 40mins)
3. Next session with student EK - includes travel time. (1hr 45mins)
Wednesday, March 20, 2019
Today's work on/in the business - Tues 19 March
1. Update my record of time worked. (15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 30mins)
3. Next sessions with students JH, EH and SH - includes travel time. (4hrs 50mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 30mins)
3. Next sessions with students JH, EH and SH - includes travel time. (4hrs 50mins)
Tuesday, March 19, 2019
Today's work on/in the business - Mon 18 March
1. Update my record of time worked. (20mins)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Backup mail locally. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 50mins)
5. Next sessions with students AZ and DW - includes preparation and travel time. (2hrs 50mins)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Backup mail locally. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 50mins)
5. Next sessions with students AZ and DW - includes preparation and travel time. (2hrs 50mins)
Monday, March 18, 2019
Today's work on/in the business - Sun 17 March
1. Update my record of time worked. (25mins)
2. Next session with student LM - includes preparation and travel time, as well as recording time. (2hrs 20mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (2hrs 25mins)
2. Next session with student LM - includes preparation and travel time, as well as recording time. (2hrs 20mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (2hrs 25mins)
Sunday, March 17, 2019
Today's work on/in the business - Sat 16 March
1. Next session with student MK - includes travel time. (1hr 25mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 15mins)
Today's work on/in the business - Fri 15 March
1. Update my record of time worked. (20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 5mins)
3. Next sessions with students AK and SS - includes travel time. (3hrs 5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 5mins)
3. Next sessions with students AK and SS - includes travel time. (3hrs 5mins)
Friday, March 15, 2019
Today's work on/in the business - Thurs 14 March
1. Update my record of time worked. (20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 25mins)
3. Next session with student AS - includes travel time. (1hr 20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 25mins)
3. Next session with student AS - includes travel time. (1hr 20mins)
Thursday, March 14, 2019
Today's work on/in the business - Wed 13 March
1. Update my record of time worked. (15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 45mins)
3. Next session with student EK - includes travel time. (1hr 25mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 45mins)
3. Next session with student EK - includes travel time. (1hr 25mins)
Wednesday, March 13, 2019
Today's work on/in the business - Tues 12 March
1. Update my record of time worked. (15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 15mins)
3. Next session with student JH - includes travel time. (2hrs 35mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 15mins)
3. Next session with student JH - includes travel time. (2hrs 35mins)
Tuesday, March 12, 2019
Today's work on/in the business - Mon 11 March
1. Update my record of time worked. (15mins)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Backup mail locally. (25mins)
4. Next session with student DW - includes travel time. (1hr 55mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (50mins)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Backup mail locally. (25mins)
4. Next session with student DW - includes travel time. (1hr 55mins)
5. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (50mins)
Monday, March 11, 2019
Today's work on/in the business - Sat 9 March
1. Next sessions with students MK and LM - includes travel time, as well as recording time. (3hrs 40mins)
2. Update my record of time worked. (25mins)
No work on Sunday - club event all day.
2. Update my record of time worked. (25mins)
No work on Sunday - club event all day.
Saturday, March 9, 2019
Today's work on/in the business - Fri 8 March
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 35mins)
3. Next sessions with students AK and SS - includes travel time. (3hrs 5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 35mins)
3. Next sessions with students AK and SS - includes travel time. (3hrs 5mins)
Friday, March 8, 2019
Today's work on/in the business - Thurs 7 March
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 5mins)
3. Next session with student AS - includes travel time. (1hr 25mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 5mins)
3. Next session with student AS - includes travel time. (1hr 25mins)
Thursday, March 7, 2019
Today's work on/in the business - Wed 6 March
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 15mins)
Then the final meeting on setting up the club event.
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 15mins)
Then the final meeting on setting up the club event.
Wednesday, March 6, 2019
Today's work on/in the business - Tues 5 March
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 25mins)
3. Next sessions with students JH, EH and SH - includes travel time. (3hrs 55mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 25mins)
3. Next sessions with students JH, EH and SH - includes travel time. (3hrs 55mins)
Tuesday, March 5, 2019
Today's work on/in the business - Mon 4 March
1. Update my record of time worked. (20mins)
2. Review progress made last week and ensure the schedule is right for this week. (10mins)
3. Backup mail locally. (25mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 5mins)
5. Next sessions with students AZ and DW - includes travel time. (3hrs)
2. Review progress made last week and ensure the schedule is right for this week. (10mins)
3. Backup mail locally. (25mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 5mins)
5. Next sessions with students AZ and DW - includes travel time. (3hrs)
Monday, March 4, 2019
Today's work on/in the business - Sun 3 March
1. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 25mins)
2. Next session with student LM - includes travel time. (2hrs 15mins)
2. Next session with student LM - includes travel time. (2hrs 15mins)
Today's work on/in the business - Sat 2 March
1. Update my record of time worked. (15mins)
2. Recording time. (25mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 15mins)
2. Recording time. (25mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 15mins)
Saturday, March 2, 2019
Today's work on/in the business - Fri 1 March
1. Update my record of time worked. (20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 5mins)
3. Working on process for new Events setup - review events. (15mins)
4. Next session with student AK - includes travel time. (1hr 30mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 5mins)
3. Working on process for new Events setup - review events. (15mins)
4. Next session with student AK - includes travel time. (1hr 30mins)
Friday, March 1, 2019
Today's work on/in the business - Thurs 28 February
1. Update my record of time worked. (15mins)
2. Accounting. (1hr)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 35mins)
4. BAS. (15mins)
5. Next session with student SS - includes travel time. (1hr 25mins)
2. Accounting. (1hr)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 35mins)
4. BAS. (15mins)
5. Next session with student SS - includes travel time. (1hr 25mins)
Thursday, February 28, 2019
Today's work on/in the business - Wed 27 February
1. Update my record of time worked. (20mins)
2. Accounting. (5hrs 45mins)
3. Next session with student EK - includes travel time. (1hr 45mins)
Visit to friend in hospital in the middle of the day, then the next meeting to discuss progress on setting up the club event in the evening.
2. Accounting. (5hrs 45mins)
3. Next session with student EK - includes travel time. (1hr 45mins)
Visit to friend in hospital in the middle of the day, then the next meeting to discuss progress on setting up the club event in the evening.
Wednesday, February 27, 2019
Today's work on/in the business - Tues 26 February
1. Update my record of time worked. (15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 25mins)
3. Next sessions with students JH, EH and SH - includes travel time. (4hrs 30mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 25mins)
3. Next sessions with students JH, EH and SH - includes travel time. (4hrs 30mins)
Tuesday, February 26, 2019
Today's work on/in the business - Mon 25 February
1. Update my record of time worked. (20mins)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Backup mail locally. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 35mins)
5. Next sessions with students AZ and DW - includes travel time. (2hrs 45mins)
2. Review progress made last week and ensure the schedule is right for this week. (5mins)
3. Backup mail locally. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 35mins)
5. Next sessions with students AZ and DW - includes travel time. (2hrs 45mins)
Monday, February 25, 2019
Today's work on/in the business - Sun 24 February
1. Update my record of time worked. (35mins)
2. Recording time and next session with student LM - includes preparation and travel time. (3hrs)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (1hr)
2. Recording time and next session with student LM - includes preparation and travel time. (3hrs)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (1hr)
Sunday, February 24, 2019
Today's work on/in the business - Sat 23 February
1. Next session with student MK - includes travel time. (1hr 20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (1hr 25mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (1hr 25mins)
Today's work on/in the business - Fri 22 February
1. Update my record of time worked. (15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 20mins)
3. Working on process for new Events setup - review events and enter regular events. (1hr 40mins)
4. Next sessions with students AK and SS - includes preparation and travel time. (2hrs 55mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 20mins)
3. Working on process for new Events setup - review events and enter regular events. (1hr 40mins)
4. Next sessions with students AK and SS - includes preparation and travel time. (2hrs 55mins)
Friday, February 22, 2019
Today's work on/in the business - Thurs 21 February
1. Update my record of time worked. (20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 50mins)
3. Next session with student AS - includes preparation and travel time. (1hr 55mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 50mins)
3. Next session with student AS - includes preparation and travel time. (1hr 55mins)
Thursday, February 21, 2019
Today's work on/in the business - Wed 20 February
1. Update my record of time worked. (20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 40mins)
3. Network dropped out - router/WiFi issue - run scans on my laptop to check it. (2hrs 45mins)
4. First session for the year with student EK - includes travel time. (1hr 45mins)
Then the next meeting to discuss progress on setting up the club event.
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 40mins)
3. Network dropped out - router/WiFi issue - run scans on my laptop to check it. (2hrs 45mins)
4. First session for the year with student EK - includes travel time. (1hr 45mins)
Then the next meeting to discuss progress on setting up the club event.
Wednesday, February 20, 2019
Today's work on/in the business - Tues 19 February
1. Update my record of time worked. (15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 35mins)
3. Next sessions with students JH, EH and SH - includes travel time. (5hrs 15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (5hrs 35mins)
3. Next sessions with students JH, EH and SH - includes travel time. (5hrs 15mins)
Tuesday, February 19, 2019
Today's work on/in the business - Mon 18 February
1. Update my record of time worked. (10mins)
2. Review progress made last week and ensure the schedule is right for this week. (10mins)
3. Backup mail locally. (5mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. Includes cutover from UAT to Production setup. (11hrs 50mins)
2. Review progress made last week and ensure the schedule is right for this week. (10mins)
3. Backup mail locally. (5mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. Includes cutover from UAT to Production setup. (11hrs 50mins)
Monday, February 18, 2019
Today's work on/in the business - Sun 17 February
1. Update my record of time worked. (20mins)
2. Recording time. (25mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs)
2. Recording time. (25mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs)
Sunday, February 17, 2019
Today's work on/in the business - Sat 16 February
1. Next session with student MK - includes travel time. (1hr 10mins)
Today's work on/in the business - Fri 15 February
1. Update my record of time worked. (20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 10mins)
3. Next sessions with students AK, AS and SS - includes travel time. (3hrs 15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 10mins)
3. Next sessions with students AK, AS and SS - includes travel time. (3hrs 15mins)
Friday, February 15, 2019
Today's work on/in the business - Thurs 14 February
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (11hrs 15mins)
Working from bed to try to get rid of a head cold quickly, so no tutoring.
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (11hrs 15mins)
Working from bed to try to get rid of a head cold quickly, so no tutoring.
Thursday, February 14, 2019
Today's work on/in the business - Wed 13 February
1. Update my record of time worked. (20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 15mins)
3. First session for the year with student DW - includes travel time. (2hrs)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 15mins)
3. First session for the year with student DW - includes travel time. (2hrs)
Wednesday, February 13, 2019
Today's work on/in the business - Tues 12 February
1. Update my record of time worked. (20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs)
3. First session for the year with student JH and next sessions with students EH and SH - includes preparation and travel time. (4hrs 30mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs)
3. First session for the year with student JH and next sessions with students EH and SH - includes preparation and travel time. (4hrs 30mins)
Tuesday, February 12, 2019
Today's work on/in the business - Mon 11 February
1. Update my record of time worked. (15mins)
2. Review progress made last week and ensure the schedule is right for this week. (10mins)
3. Backup mail locally. (15mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 35mins)
5. Next session with student AZ - includes travel time. (1hr 30mins)
2. Review progress made last week and ensure the schedule is right for this week. (10mins)
3. Backup mail locally. (15mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 35mins)
5. Next session with student AZ - includes travel time. (1hr 30mins)
Monday, February 11, 2019
Today's work on/in the business - Sun 10 February
1. Update my record of time worked. (20mins)
2. Recording time. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 50mins)
2. Recording time. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 50mins)
Sunday, February 10, 2019
Today's work on/in the business - Sat 9 February
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (4hrs 45mins)
3. Next sessions with students MK and LM - includes travel time. (3hrs 20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (4hrs 45mins)
3. Next sessions with students MK and LM - includes travel time. (3hrs 20mins)
Saturday, February 9, 2019
Today's work on/in the business - Fri 8 February
1. Update my record of time worked. (20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 40mins)
3. First session for the year with student AK and first session with student SS - includes travel time. (3hrs 15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 40mins)
3. First session for the year with student AK and first session with student SS - includes travel time. (3hrs 15mins)
Friday, February 8, 2019
Today's work on/in the business - Thurs 7 February
1. Update my record of time worked. (20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs)
3. First session for the year with student AS - includes travel time. (2hrs 40mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs)
3. First session for the year with student AS - includes travel time. (2hrs 40mins)
Thursday, February 7, 2019
Today's work on/in the business - Wed 6 February
1. Update my record of time worked. (15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 15mins)
Then the next meeting to discuss progress on setting up the club event.
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 15mins)
Then the next meeting to discuss progress on setting up the club event.
Wednesday, February 6, 2019
Today's work on/in the business - Tues 5 February
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 25mins)
3. Next sessions with students EH and SH - includes preparation and travel time. (2hrs 40mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 25mins)
3. Next sessions with students EH and SH - includes preparation and travel time. (2hrs 40mins)
Tuesday, February 5, 2019
Today's work on/in the business - Mon 4 February
1. Update my record of time worked. (15mins)
2. Review progress made last week and ensure the schedule is right for this week. (15mins)
3. Backup mail locally. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 20mins)
5. First session for the year with student AZ - includes travel time. (1hr 45mins)
2. Review progress made last week and ensure the schedule is right for this week. (15mins)
3. Backup mail locally. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (7hrs 20mins)
5. First session for the year with student AZ - includes travel time. (1hr 45mins)
Monday, February 4, 2019
Today's work on/in the business - Sun 3 February
1. Update my record of time worked. (10mins)
2. Recording time. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 30mins)
2. Recording time. (15mins)
3. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs 30mins)
Sunday, February 3, 2019
Today's work on/in the business - Sat 2 February
1. Update my record of time worked. (5mins)
2. First session for the year with student MK and next session with student LM - includes preparation and travel time. (3hrs 55mins)
2. First session for the year with student MK and next session with student LM - includes preparation and travel time. (3hrs 55mins)
Saturday, February 2, 2019
Today's work on/in the business - Fri 1 February
1. Update my record of time worked. (20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 20mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 20mins)
Friday, February 1, 2019
Today's work on/in the business - Thurs 31 January
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (10hrs 10mins)
Thursday, January 31, 2019
Today's work on/in the business - Wed 30 January
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 30mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (9hrs 30mins)
Wednesday, January 30, 2019
Today's work on/in the business - Tues 29 January
1. Update my record of time worked. (15mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs)
3. Working on process for new Events setup - review events and enter regular events. (1hr)
4. Next sessions with students EH and SH - includes travel time. (2hrs 30mins)
2. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (6hrs)
3. Working on process for new Events setup - review events and enter regular events. (1hr)
4. Next sessions with students EH and SH - includes travel time. (2hrs 30mins)
Tuesday, January 29, 2019
Today's work on/in the business - Mon 28 January
1. Update my record of time worked. (10mins)
2. Review progress made last week and ensure the schedule is right for this week. (10mins)
3. Backup mail locally. (20mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 50mins)
2. Review progress made last week and ensure the schedule is right for this week. (10mins)
3. Backup mail locally. (20mins)
4. Investigate process for next version of software project for new customer - investigation for new process, particularly use of a proxy. Working on integration of new OCR product. (8hrs 50mins)