1. Update my record of time worked. (10mins)
2. Review progress made this week. (40mins)
3. Working on process for new Events setup - review events. (15mins)
4. Investigate process for next version of software project for new customer - investigation for new process. (3hrs 10mins)
5. Accounting. (5mins)
6. Read IT blogs. (45mins)
Tuesday, December 31, 2013
Monday, December 30, 2013
Today's work on/in the business - Sun 29 Dec
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process. (3hrs 15mins)
3. Assist with setup of test website for upgrade for website customer. (20mins)
4. Review progress made this week and ensure the schedule is right for next week. (45mins)
5. Backup my mail locally - started this, then realised the server was inaccessible. (5mins)
6. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (10mins)
7. Read IT blogs. (25mins)
8. Create a blog post. (20mins)
2. Investigate process for next version of software project for new customer - investigation for new process. (3hrs 15mins)
3. Assist with setup of test website for upgrade for website customer. (20mins)
4. Review progress made this week and ensure the schedule is right for next week. (45mins)
5. Backup my mail locally - started this, then realised the server was inaccessible. (5mins)
6. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (10mins)
7. Read IT blogs. (25mins)
8. Create a blog post. (20mins)
Sunday, December 29, 2013
Today's work on/in the business - Sat 28 Dec
1. Read IT blogs. (45mins)
A wonderful lunch to celebrate my parents' Golden Wedding Anniversary!
A wonderful lunch to celebrate my parents' Golden Wedding Anniversary!
Today's work on/in the business - Fri 27 Dec
1. Update my record of time worked. (5mins)
2. Review progress made this week. (30mins)
3. Continue searching for work done previously on website upgrade. (1hr 55mins)
4. Investigate process for next version of software project for new customer - investigation for new process. (5hrs 40mins)
2. Review progress made this week. (30mins)
3. Continue searching for work done previously on website upgrade. (1hr 55mins)
4. Investigate process for next version of software project for new customer - investigation for new process. (5hrs 40mins)
Friday, December 27, 2013
Today's work on/in the business - Thurs 26 Dec
1. Update my record of time worked. (15mins)
2. Review progress made this week. (1hr)
3. Anti virus scan on my laptop, as this needs to be done regularly to be sure it is clean - fourth one run and reported clean. (5hrs 10mins)
2. Review progress made this week. (1hr)
3. Anti virus scan on my laptop, as this needs to be done regularly to be sure it is clean - fourth one run and reported clean. (5hrs 10mins)
Thursday, December 26, 2013
Today's work on/in the business - Wed 25 Dec
1. Anti virus scan on my laptop, as this needs to be done regularly to be sure it is clean - third one run and reported clean. (3hrs 55mins)
2. Working on process for new Events setup - review events. (20mins)
2. Working on process for new Events setup - review events. (20mins)
Today's work on/in the business - Tues 24 Dec
1. Anti virus scan on my laptop, as this needs to be done regularly to be sure it is clean - first one run and reported clean, second one run and reported clean. (2hrs 50mins)
2. Update my record of time worked. (15mins)
3. Review progress made this week. (20mins)
4. Working on process for new Events setup - review events, create regular events, create and download full backup. (4hrs 40mins)
5. Free space on my laptop. (2hrs 45mins)
6. Search for work done previously on website upgrade. (1hr 5mins)
2. Update my record of time worked. (15mins)
3. Review progress made this week. (20mins)
4. Working on process for new Events setup - review events, create regular events, create and download full backup. (4hrs 40mins)
5. Free space on my laptop. (2hrs 45mins)
6. Search for work done previously on website upgrade. (1hr 5mins)
Tuesday, December 24, 2013
Today's work on/in the business - Mon 23 Dec
1. Update my record of time worked. (15mins)
2. Read small business blogs. (25mins)
3. Review progress made this week. (50mins)
4. Topup mobile broadband. (5mins)
5. Anti virus scan on my laptop, as this needs to be done regularly to be sure it is clean - first one running. (4hrs 50mins)
6. Investigate process for next version of software project for new customer - investigation for new process. (2hrs 10mins)
2. Read small business blogs. (25mins)
3. Review progress made this week. (50mins)
4. Topup mobile broadband. (5mins)
5. Anti virus scan on my laptop, as this needs to be done regularly to be sure it is clean - first one running. (4hrs 50mins)
6. Investigate process for next version of software project for new customer - investigation for new process. (2hrs 10mins)
Monday, December 23, 2013
Today's work on/in the business - Sat 21 Dec
1. Update my record of time worked. (10mins)
2. Review progress made this week and ensure the schedule is right for next week. (40mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Read small business blogs. (1hr 5mins)
2. Review progress made this week and ensure the schedule is right for next week. (40mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Read small business blogs. (1hr 5mins)
Saturday, December 21, 2013
Today's work on/in the business - Fri 20 Dec
1. Update my record of time worked. (10mins)
2. Review progress made this week. (45mins)
3. Accounting. (1hr 30mins)
4. Invoice reconciliation - 4 updated, 2 started. (2hrs 5mins)
5. Free space on my laptop. (20mins)
6. Backup my mail locally. (1hr 10mins)
2. Review progress made this week. (45mins)
3. Accounting. (1hr 30mins)
4. Invoice reconciliation - 4 updated, 2 started. (2hrs 5mins)
5. Free space on my laptop. (20mins)
6. Backup my mail locally. (1hr 10mins)
Friday, December 20, 2013
Today's work on/in the business - Thurs 19 Dec
1. Update my record of time worked. (5mins)
2. Review progress made this week. (30mins)
3. Assist with changes to website in response to ranking query from website customer. (1hr 45mins)
4. Work on WordPress plugin changes for new customer - install. (50mins)
5. Working on process for new Events setup - review events. (10mins)
6. Anti virus scan on my laptop, as this needs to be done regularly to be sure it is clean - fourth one run and reported clean. (7hrs 55mins)
7. Backup my mail locally. (5mins)
8. Assist with changing password for support customer. (50mins)
2. Review progress made this week. (30mins)
3. Assist with changes to website in response to ranking query from website customer. (1hr 45mins)
4. Work on WordPress plugin changes for new customer - install. (50mins)
5. Working on process for new Events setup - review events. (10mins)
6. Anti virus scan on my laptop, as this needs to be done regularly to be sure it is clean - fourth one run and reported clean. (7hrs 55mins)
7. Backup my mail locally. (5mins)
8. Assist with changing password for support customer. (50mins)
Thursday, December 19, 2013
Today's work on/in the business - Wed 18 Dec
1. Anti virus scan on my laptop, as this needs to be done regularly to be sure it is clean - second one finished, third one run and reported clean. (7hrs 5mins)
2. Work on WordPress plugin changes for new customer - test system complete. (4hrs 10mins)
3. Update my record of time worked. (5mins)
4. Review progress made this week. (35mins)
2. Work on WordPress plugin changes for new customer - test system complete. (4hrs 10mins)
3. Update my record of time worked. (5mins)
4. Review progress made this week. (35mins)
Wednesday, December 18, 2013
Today's work on/in the business - Tues 17 Dec
1. Anti virus scan on my laptop, as this needs to be done regularly to be sure it is clean - first one finished and reported clean, second one running and found a trojan running in memory. (8hrs 5mins)
2. Update my record of time worked. (10mins)
3. Work on WordPress plugin changes for new customer. (3hrs 45mins)
4. Review progress made this week. (35mins)
2. Update my record of time worked. (10mins)
3. Work on WordPress plugin changes for new customer. (3hrs 45mins)
4. Review progress made this week. (35mins)
Tuesday, December 17, 2013
Today's work on/in the business - Mon 16 Dec
1. Update my record of time worked. (5mins)
2. Review progress made last week and ensure the schedule is right for this week. (30mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Work on WordPress plugin changes for new customer. (5hrs 20mins)
5. Anti virus scan on my laptop, as this needs to be done regularly to be sure it is clean - first one running. (1hr 15mins)
2. Review progress made last week and ensure the schedule is right for this week. (30mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Work on WordPress plugin changes for new customer. (5hrs 20mins)
5. Anti virus scan on my laptop, as this needs to be done regularly to be sure it is clean - first one running. (1hr 15mins)
Monday, December 16, 2013
Today's work on/in the business - Sat 14 Dec
1. Update my record of time worked. (5mins)
2. Review progress made this week. (45mins)
3. Investigate process for next version of software project for new customer - investigation for new process. (6hrs 40mins)
And I refused to do any work yesterday (Sunday) - went for a bike ride and tried to relax!
2. Review progress made this week. (45mins)
3. Investigate process for next version of software project for new customer - investigation for new process. (6hrs 40mins)
And I refused to do any work yesterday (Sunday) - went for a bike ride and tried to relax!
Saturday, December 14, 2013
Today's work on/in the business - Fri 13 Dec
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process. (7hrs)
3. Review progress made this week. (35mins)
4. Updates to Windows on my laptop. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process. (7hrs)
3. Review progress made this week. (35mins)
4. Updates to Windows on my laptop. (10mins)
Friday, December 13, 2013
Today's work on/in the business - Thurs 12 Dec
1. Update my record of time worked. (5mins)
2. Review progress made this week. (45mins)
3. Investigate process for next version of software project for new customer - investigation for new process. (8hrs 25mins)
4. Assist with changes to website in response to ranking query from website customer. (20mins)
2. Review progress made this week. (45mins)
3. Investigate process for next version of software project for new customer - investigation for new process. (8hrs 25mins)
4. Assist with changes to website in response to ranking query from website customer. (20mins)
Thursday, December 12, 2013
Today's work on/in the business - Wed 11 Dec
1. Update my record of time worked. (5mins)
2. Review progress made this week. (35mins)
3. Updates to Windows on my laptop. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process. (3hrs 10mins)
My morning was filled by a wonderful coffee catch-up with my sister - a good start to the day!
2. Review progress made this week. (35mins)
3. Updates to Windows on my laptop. (10mins)
4. Investigate process for next version of software project for new customer - investigation for new process. (3hrs 10mins)
My morning was filled by a wonderful coffee catch-up with my sister - a good start to the day!
Wednesday, December 11, 2013
Today's work on/in the business - Tues 10 Dec
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process. (7hrs 30mins)
3. Quote for work on WordPress plugin changes for new customer, including phone call to give the go ahead. (35mins)
4. Review progress made this week. (50mins)
2. Investigate process for next version of software project for new customer - investigation for new process. (7hrs 30mins)
3. Quote for work on WordPress plugin changes for new customer, including phone call to give the go ahead. (35mins)
4. Review progress made this week. (50mins)
Tuesday, December 10, 2013
Today's work on/in the business - Mon 9 Dec
1. Update my record of time worked. (5mins)
2. Review progress made last week and ensure the schedule is right for this week. (1hr)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Investigate process for next version of software project for new customer - investigation for new process. (10hrs 50mins)
5. Create a blog post outline. (5mins)
2. Review progress made last week and ensure the schedule is right for this week. (1hr)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Investigate process for next version of software project for new customer - investigation for new process. (10hrs 50mins)
5. Create a blog post outline. (5mins)
Monday, December 9, 2013
Today's work on/in the business - Sun 8 Dec
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process. (1hr 10mins)
2. Investigate process for next version of software project for new customer - investigation for new process. (1hr 10mins)
Sunday, December 8, 2013
Today's work on/in the business - Sat 7 Dec
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation for new process. (50mins)
3. Backup my mail locally. (1hr 30mins)
2. Investigate process for next version of software project for new customer - investigation for new process. (50mins)
3. Backup my mail locally. (1hr 30mins)
Saturday, December 7, 2013
Today's work on/in the business - Fri 6 Dec
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - investigation for new process. (2hrs 50mins)
3. Review progress made this week. (35mins)
4. Work on WordPress plugin changes for new customer, including phone call to clarify requirements. (1hr 55mins)
2. Investigate process for next version of software project for new customer - investigation for new process. (2hrs 50mins)
3. Review progress made this week. (35mins)
4. Work on WordPress plugin changes for new customer, including phone call to clarify requirements. (1hr 55mins)
Friday, December 6, 2013
Today's work on/in the business - Thurs 5 Dec
1. Update my record of time worked. (10mins)
2. Review progress made this week. (25mins)
3. Investigate process for next version of software project for new customer - investigation for new process. (8hrs 15mins)
4. Work on WordPress plugin changes for new customer, including phone call to clarify requirements. (10mins)
2. Review progress made this week. (25mins)
3. Investigate process for next version of software project for new customer - investigation for new process. (8hrs 15mins)
4. Work on WordPress plugin changes for new customer, including phone call to clarify requirements. (10mins)
Thursday, December 5, 2013
Today's work on/in the business - Wed 4 Dec
1. Update my record of time worked. (10mins)
2. Review progress made this week. (45mins)
3. Working on process for new Events setup - review events. (25mins)
4. Work on WordPress plugin changes for new customer. (2hrs)
5. Investigate process for next version of software project for new customer - investigation for new process. (4hrs 35mins)
2. Review progress made this week. (45mins)
3. Working on process for new Events setup - review events. (25mins)
4. Work on WordPress plugin changes for new customer. (2hrs)
5. Investigate process for next version of software project for new customer - investigation for new process. (4hrs 35mins)
Wednesday, December 4, 2013
Today's work on/in the business - Tues 3 Dec
1. Anti virus scan on my laptop, as this needs to be done regularly to be sure it is clean - fourth one finished, one threat found and removed. (5mins)
2. Update my record of time worked. (10mins)
3. Review progress made this week. (30mins)
4. Investigate process for next version of software project for new customer - finished testing process for next steps. (6hrs 30mins)
2. Update my record of time worked. (10mins)
3. Review progress made this week. (30mins)
4. Investigate process for next version of software project for new customer - finished testing process for next steps. (6hrs 30mins)
Tuesday, December 3, 2013
Today's work on/in the business - Mon 2 Dec
1. Update my record of time worked. (5mins)
2. Review progress made last week and ensure the schedule is right for this week. (45mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Determine whether we met the KPIs (Key Performance Indicators) for November 2013. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise (although I have been riding more and I'm now doing weights regularly) and we need to work on contacting new prospects too (still). This time, the online networking KPI was met, which is great. (10mins)
5. Anti virus and malware scans on my laptop, as this needs to be done regularly to be sure it is clean - third one run and reported clean, fourth one running. (10hrs 30mins)
6. Investigate process for next version of software project for new customer - testing process for next steps and phone discussion with customer re current status and next outline document. (25mins)
I also had a chance to investigate a friend's Microsoft Surface - interesting and has more functionality than I realised. My current laptop is on its last legs, so I am looking into a replacement.
2. Review progress made last week and ensure the schedule is right for this week. (45mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Determine whether we met the KPIs (Key Performance Indicators) for November 2013. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise (although I have been riding more and I'm now doing weights regularly) and we need to work on contacting new prospects too (still). This time, the online networking KPI was met, which is great. (10mins)
5. Anti virus and malware scans on my laptop, as this needs to be done regularly to be sure it is clean - third one run and reported clean, fourth one running. (10hrs 30mins)
6. Investigate process for next version of software project for new customer - testing process for next steps and phone discussion with customer re current status and next outline document. (25mins)
I also had a chance to investigate a friend's Microsoft Surface - interesting and has more functionality than I realised. My current laptop is on its last legs, so I am looking into a replacement.
Monday, December 2, 2013
Today's work on/in the business - Sun 1 Dec
1. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - first two finished and reported clean. (9hrs 35mins)
2. Update my record of time worked. (15mins)
3. Read IT blogs. (2hrs 15mins)
4. Cross post blog post on our Facebook page. (5mins)
2. Update my record of time worked. (15mins)
3. Read IT blogs. (2hrs 15mins)
4. Cross post blog post on our Facebook page. (5mins)
Sunday, December 1, 2013
Today's work on/in the business - Sat 30 Nov
1. Update my record of time worked. (5mins)
2. Review progress made this week. (30mins)
3. Backup my mail locally. (1hr 20mins)
4. Investigate process for next version of software project for new customer - testing process for next steps and review next outline document. (1hr 45mins)
5. Create a blog post. (20mins)
6. Read small business blogs. (1hr 45mins)
7. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - first two running. (3hrs 40mins)
2. Review progress made this week. (30mins)
3. Backup my mail locally. (1hr 20mins)
4. Investigate process for next version of software project for new customer - testing process for next steps and review next outline document. (1hr 45mins)
5. Create a blog post. (20mins)
6. Read small business blogs. (1hr 45mins)
7. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - first two running. (3hrs 40mins)
Saturday, November 30, 2013
Today's work on/in the business - Fri 29 Nov
1. Update my record of time worked. (5mins)
2. Review progress made this week. (25mins)
3. Investigate process for next version of software project for new customer - testing process for next steps. (5hrs 10mins)
4. Working on process for new Events setup - review events. (10mins)
2. Review progress made this week. (25mins)
3. Investigate process for next version of software project for new customer - testing process for next steps. (5hrs 10mins)
4. Working on process for new Events setup - review events. (10mins)
Friday, November 29, 2013
Today's work on/in the business - Thurs 28 Nov
1. Update my record of time worked. (10mins)
2. Review progress made this week. (25mins)
3. Topup mobile phone. (5mins)
4. Investigate process for next version of software project for new customer - testing process for next steps. (7hrs 15mins)
2. Review progress made this week. (25mins)
3. Topup mobile phone. (5mins)
4. Investigate process for next version of software project for new customer - testing process for next steps. (7hrs 15mins)
Thursday, November 28, 2013
Today's work on/in the business - Wed 27 Nov
1. Update my record of time worked. (5mins)
2. Review progress made this week. (25mins)
3. Working on process for new Events setup - review events. (15mins)
4. Small business and IT webinars. (2hrs 10mins)
5. Investigate process for next version of software project for new customer - testing process for next steps. (3hrs 5mins)
6. Read IT blogs. (30mins)
2. Review progress made this week. (25mins)
3. Working on process for new Events setup - review events. (15mins)
4. Small business and IT webinars. (2hrs 10mins)
5. Investigate process for next version of software project for new customer - testing process for next steps. (3hrs 5mins)
6. Read IT blogs. (30mins)
Wednesday, November 27, 2013
Today's work on/in the business - Tues 26 Nov
1. Update my record of time worked. (10mins)
2. Review progress made this week. (30mins)
3. Read small business blogs. (2hrs 10mins)
4. Working on process for new Events setup - review events and enter regular events. (1hr 35mins)
2. Review progress made this week. (30mins)
3. Read small business blogs. (2hrs 10mins)
4. Working on process for new Events setup - review events and enter regular events. (1hr 35mins)
Tuesday, November 26, 2013
Today's work on/in the business - Mon 25 Nov
1. Anti virus and malware scans on my laptop, as this needs to be done regularly to be sure it is clean - second one clean, third and fourth run and clean. (13hrs 10mins)
2. Continue next changes for website customer. (5mins)
3. Update my record of time worked. (10mins)
4. Accounting. (25mins)
5. Review progress made this week. (30mins)
6. Read small business blogs. (40mins)
2. Continue next changes for website customer. (5mins)
3. Update my record of time worked. (10mins)
4. Accounting. (25mins)
5. Review progress made this week. (30mins)
6. Read small business blogs. (40mins)
Monday, November 25, 2013
Today's work on/in the business - Sun 24 Nov
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (55mins)
3. Invoice reconciliation - 2 updated, 1 started. (15mins)
4. Continue next changes for website customer. (20mins)
5. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - second one running. (30mins)
2. Review progress made this week and ensure the schedule is right for next week. (55mins)
3. Invoice reconciliation - 2 updated, 1 started. (15mins)
4. Continue next changes for website customer. (20mins)
5. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - second one running. (30mins)
Sunday, November 24, 2013
Today's work on/in the business - Sat 23 Nov
1. Update my record of time worked. (10mins)
2. Review progress made this week. (20mins)
3. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - first one run and reported clean again. (7hrs 30mins)
4. Start process for next changes for website customer. (35mins)
5. Invoice reconciliation - 2 paid. (10mins)
2. Review progress made this week. (20mins)
3. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - first one run and reported clean again. (7hrs 30mins)
4. Start process for next changes for website customer. (35mins)
5. Invoice reconciliation - 2 paid. (10mins)
Saturday, November 23, 2013
Today's work on/in the business - Fri 22 Nov
1. Update my record of time worked. (10mins)
2. Read small business blogs. (10mins)
3. Review progress made this week. (1hr)
4. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (10mins)
5. Backup my mail locally. (2hrs 25mins)
6. Create a blog post and post on our Facebook page. (1hr)
2. Read small business blogs. (10mins)
3. Review progress made this week. (1hr)
4. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (10mins)
5. Backup my mail locally. (2hrs 25mins)
6. Create a blog post and post on our Facebook page. (1hr)
Friday, November 22, 2013
Today's work on/in the business - Thurs 21 Nov
1. Update my record of time worked. (10mins)
2. Review progress made this week. (40mins)
3. Confirm issue with Google results fixed for website customer. (10mins)
4. Assist with updates to our website. (40mins)
5. Investigate process for next version of software project for new customer - determine process for next steps. (50mins)
6. Read information about next changes for website customer. (5mins)
7. Read small business blogs. (2hrs 15mins)
2. Review progress made this week. (40mins)
3. Confirm issue with Google results fixed for website customer. (10mins)
4. Assist with updates to our website. (40mins)
5. Investigate process for next version of software project for new customer - determine process for next steps. (50mins)
6. Read information about next changes for website customer. (5mins)
7. Read small business blogs. (2hrs 15mins)
Thursday, November 21, 2013
Today's work on/in the business - Wed 20 Nov
1. Update my record of time worked. (10mins)
2. Review progress made this week. (25mins)
3. Identify issue with Google results for website customer. (10mins)
4. Small business webinar. (1hr)
5. Cross post blog post on our Facebook page. (10mins)
6. Topup mobile phone. (5mins)
7. Investigate process for next version of software project for new customer - raise queries about next steps. (10mins)
8. Read small business blogs. (2hrs)
2. Review progress made this week. (25mins)
3. Identify issue with Google results for website customer. (10mins)
4. Small business webinar. (1hr)
5. Cross post blog post on our Facebook page. (10mins)
6. Topup mobile phone. (5mins)
7. Investigate process for next version of software project for new customer - raise queries about next steps. (10mins)
8. Read small business blogs. (2hrs)
Wednesday, November 20, 2013
Today's work on/in the business - Tues 19 Nov
1. Update my record of time worked. (10mins)
2. Review progress made this week. (25mins)
3. Read small business blogs. (2hrs)
A day where I could not focus on work. But in the afternoon, I took a friend out for a 'remember how to ride a bike' ride, which went really well!
2. Review progress made this week. (25mins)
3. Read small business blogs. (2hrs)
A day where I could not focus on work. But in the afternoon, I took a friend out for a 'remember how to ride a bike' ride, which went really well!
Tuesday, November 19, 2013
Today's work on/in the business - Mon 18 Nov
1. Update my record of time worked. (10mins)
2. Review progress made this week. (25mins)
3. Investigate process for next version of software project for new customer - working on next change. (2hrs 10mins)
4. Assist with updates to our website. (15mins)
And then a great bike ride in the afternoon and setting up to help a friend remember how to ride a bike.
2. Review progress made this week. (25mins)
3. Investigate process for next version of software project for new customer - working on next change. (2hrs 10mins)
4. Assist with updates to our website. (15mins)
And then a great bike ride in the afternoon and setting up to help a friend remember how to ride a bike.
Monday, November 18, 2013
Today's work on/in the business - Sun 17 Nov
1. Updates to Windows on my laptop. (15mins)
2. Update my record of time worked. (10mins)
3. Review progress made this week and ensure the schedule is right for next week. (30mins)
4. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - second one run and reported clean again. (9hrs 25mins)
5. Read small business blogs. (2hrs 35mins)
2. Update my record of time worked. (10mins)
3. Review progress made this week and ensure the schedule is right for next week. (30mins)
4. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - second one run and reported clean again. (9hrs 25mins)
5. Read small business blogs. (2hrs 35mins)
Sunday, November 17, 2013
Today's work on/in the business - Sat 16 Nov
1. Update my record of time worked. (5mins)
2. Review progress made this week. (45mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (10mins)
4. Backup my mail locally. (1hr 35mins)
5. Updates to Windows on my laptop. (15mins)
6. Invoice reconciliation - 1 paid, 3 updated, 1 started. (35mins)
7. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - first one run and reported clean again. (5hrs 45mins)
2. Review progress made this week. (45mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (10mins)
4. Backup my mail locally. (1hr 35mins)
5. Updates to Windows on my laptop. (15mins)
6. Invoice reconciliation - 1 paid, 3 updated, 1 started. (35mins)
7. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - first one run and reported clean again. (5hrs 45mins)
Saturday, November 16, 2013
Today's work on/in the business - Fri 15 Nov
1. Update my record of time worked. (10mins)
2. Review progress made this week. (40mins)
3. Working on process for new Events setup - review events. (15mins)
4. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - fourth one run and reported clean. (6hrs 40mins)
5. Investigate process for next version of software project for new customer - working on next change. (3hrs 5mins)
2. Review progress made this week. (40mins)
3. Working on process for new Events setup - review events. (15mins)
4. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - fourth one run and reported clean. (6hrs 40mins)
5. Investigate process for next version of software project for new customer - working on next change. (3hrs 5mins)
Friday, November 15, 2013
Today's work on/in the business - Thurs 14 Nov
1. Review progress made this week. (25mins)
2. Update my record of time worked. (10mins)
3. Add new link to website for website customer. (2hrs 5mins)
4. Investigate process for next version of software project for new customer - working on next change. (3hrs 5mins)
5. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - third one run and reported clean. (2hrs 15mins)
2. Update my record of time worked. (10mins)
3. Add new link to website for website customer. (2hrs 5mins)
4. Investigate process for next version of software project for new customer - working on next change. (3hrs 5mins)
5. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - third one run and reported clean. (2hrs 15mins)
Thursday, November 14, 2013
Today's work on/in the business - Wed 13 Nov
1. Update my record of time worked. (10mins)
2. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - second one finished and reported clean. (5hrs 50mins)
3. Assist with changes to website in response to ranking query from website customer. (50mins)
4. Read IT blogs. (3hrs)
5. Review progress made last week and ensure the schedule is right for this week. (1hr 25mins)
2. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - second one finished and reported clean. (5hrs 50mins)
3. Assist with changes to website in response to ranking query from website customer. (50mins)
4. Read IT blogs. (3hrs)
5. Review progress made last week and ensure the schedule is right for this week. (1hr 25mins)
Wednesday, November 13, 2013
Today's work on/in the business - Tues 12 Nov
1. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - first one finished - Adobe Reader update contained a trojan AGAIN, second one started. (8hrs)
2. Update my record of time worked. (10mins)
3. Assist with changes to website in response to ranking query from website customer. (35mins)
4. Create a blog post and post on our Facebook page. (10mins)
5. Read small business blogs. (2hrs 35mins)
2. Update my record of time worked. (10mins)
3. Assist with changes to website in response to ranking query from website customer. (35mins)
4. Create a blog post and post on our Facebook page. (10mins)
5. Read small business blogs. (2hrs 35mins)
Tuesday, November 12, 2013
Today's work on/in the business - Mon 11 Nov
1. Update my record of time worked. (5mins)
2. Review progress made last week and ensure the schedule is right for this week. (45mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Backup my mail locally. (1hr 25mins)
5. Invoice reconciliation - 1 finalised and sent out, CRM updated. (50mins)
6. Accounting. (25mins)
7. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - first one started. (5hrs 10mins)
2. Review progress made last week and ensure the schedule is right for this week. (45mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Backup my mail locally. (1hr 25mins)
5. Invoice reconciliation - 1 finalised and sent out, CRM updated. (50mins)
6. Accounting. (25mins)
7. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - first one started. (5hrs 10mins)
Monday, November 11, 2013
Today's work on/in the business - Sun 10 Nov
1. Working on process for new Events setup - review events. (5mins)
And then go out and listen to more music!
And then go out and listen to more music!
Today's work on/in the business - Fri 8 Nov
1. Update my record of time worked. (15mins)
And listen to music and relax!
And listen to music and relax!
Friday, November 8, 2013
Today's work on/in the business - Thurs 7 Nov
1. Update my record of time worked. (15mins)
2. Investigate process for next version of software project for new customer - working on next changes and send updated timesheet. (1hr)
3. Review progress made this week. (30mins)
Then off to Bendigo for a long weekend away, to listen to music!
2. Investigate process for next version of software project for new customer - working on next changes and send updated timesheet. (1hr)
3. Review progress made this week. (30mins)
Then off to Bendigo for a long weekend away, to listen to music!
Thursday, November 7, 2013
Today's work on/in the business - Wed 6 Nov
1. Update my record of time worked. (5mins)
2. Review progress made this week. (1hr 10mins)
3. Investigate process for next version of software project for new customer - working on next changes and send updated timesheet. (2hrs 45mins)
4. Assist with changes to website in response to ranking query from website customer. (1hr 30mins)
2. Review progress made this week. (1hr 10mins)
3. Investigate process for next version of software project for new customer - working on next changes and send updated timesheet. (2hrs 45mins)
4. Assist with changes to website in response to ranking query from website customer. (1hr 30mins)
Wednesday, November 6, 2013
Today's work on/in the business - Tues 5 Nov
1. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - first one completed - found a couple of trojans, third one reported clean. (11hrs 30mins)
2. Update my record of time worked. (10mins)
3. Read small business blogs. (1hr 45mins)
4. Investigate process for next version of software project for new customer - updated timesheet. (5mins)
2. Update my record of time worked. (10mins)
3. Read small business blogs. (1hr 45mins)
4. Investigate process for next version of software project for new customer - updated timesheet. (5mins)
Tuesday, November 5, 2013
Today's work on/in the business - Mon 4 Nov
1. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - first one may have hung, although it reports that it is still running, second one reported clean. (9hrs 30mins)
2. Cross post latest blog post on our Facebook page. (10mins)
3. Update my record of time worked. (10mins)
4. Invoice reconciliation - 3 sent out, 4 statements sent out. (40mins)
5. Investigate process for next version of software project for new customer - working on next changes and send updated timesheet. (3hrs 30mins)
2. Cross post latest blog post on our Facebook page. (10mins)
3. Update my record of time worked. (10mins)
4. Invoice reconciliation - 3 sent out, 4 statements sent out. (40mins)
5. Investigate process for next version of software project for new customer - working on next changes and send updated timesheet. (3hrs 30mins)
Monday, November 4, 2013
Today's work on/in the business - Sun 3 Nov
1. Update my record of time worked. (10mins)
2. Review progress made this week and ensure the schedule is right for next week. (45mins)
3. Invoice reconciliation - 5 updated, 2 finalised, 5 statements created. (1hr 10mins)
4. Accounting. (15mins)
5. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - first one found a trojan. (7hrs 25mins)
2. Review progress made this week and ensure the schedule is right for next week. (45mins)
3. Invoice reconciliation - 5 updated, 2 finalised, 5 statements created. (1hr 10mins)
4. Accounting. (15mins)
5. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - first one found a trojan. (7hrs 25mins)
Sunday, November 3, 2013
Today's work on/in the business - Sat 2 Nov
1. Update my record of time worked. (10mins)
2. Review progress made this week. (15mins)
3. Read small business blogs. (1hr 15mins)
2. Review progress made this week. (15mins)
3. Read small business blogs. (1hr 15mins)
Saturday, November 2, 2013
Today's work on/in the business - Fri 1 Nov
1. Update my record of time worked. (10mins)
2. Review progress made this week. (50mins)
3. Determine whether we met the KPIs (Key Performance Indicators) for October 2013. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise (although I have been riding more and I'm now doing weights regularly) and we need to work on contacting new prospects too (still). This time, the online networking KPI was met, which is great. (10mins)
4. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
5. Backup my mail locally. (1hr 20mins)
6. Send email to Plone support prospect. (20mins)
7. Investigate process for next version of software project for new customer - working on next changes. (2hrs 35mins)
8. Read small business blogs. (4hrs 25mins)
2. Review progress made this week. (50mins)
3. Determine whether we met the KPIs (Key Performance Indicators) for October 2013. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise (although I have been riding more and I'm now doing weights regularly) and we need to work on contacting new prospects too (still). This time, the online networking KPI was met, which is great. (10mins)
4. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
5. Backup my mail locally. (1hr 20mins)
6. Send email to Plone support prospect. (20mins)
7. Investigate process for next version of software project for new customer - working on next changes. (2hrs 35mins)
8. Read small business blogs. (4hrs 25mins)
Friday, November 1, 2013
Today's work on/in the business - Thurs 31 Oct
1. Update my record of time worked. (5mins)
2. Review progress made this week. (55mins)
3. Investigate process for next version of software project for new customer - working on next changes. (4hrs 45mins)
4. Call from Plone support prospect. (10mins)
2. Review progress made this week. (55mins)
3. Investigate process for next version of software project for new customer - working on next changes. (4hrs 45mins)
4. Call from Plone support prospect. (10mins)
Thursday, October 31, 2013
Today's work on/in the business - Wed 30 Oct
1. Update my record of time worked. (5mins)
2. Working on process for new Events setup - review events. (30mins)
3. Review progress made this week. (25mins)
4. Investigate process for next version of software project for new customer - working on next changes. (3hrs 30mins)
5. Free space on laptop. (10mins)
2. Working on process for new Events setup - review events. (30mins)
3. Review progress made this week. (25mins)
4. Investigate process for next version of software project for new customer - working on next changes. (3hrs 30mins)
5. Free space on laptop. (10mins)
Wednesday, October 30, 2013
Today's work on/in the business - Tues 29 Oct
1. Update my record of time worked. (15mins)
2. Review progress made this week. (50mins)
3. Working on process for new Events setup - review events. (20mins)
4. Investigate process for next version of software project for new customer - working on next changes. (7hrs 35mins)
5. Free space on laptop. (3hrs)
2. Review progress made this week. (50mins)
3. Working on process for new Events setup - review events. (20mins)
4. Investigate process for next version of software project for new customer - working on next changes. (7hrs 35mins)
5. Free space on laptop. (3hrs)
Tuesday, October 29, 2013
Today's work on/in the business - Mon 28 Oct
1. Review progress made this week. (45mins)
2. Update my record of time worked. (5mins)
3. Accounting. (15mins)
4. Invoice reconciliation - 2 paid, 2 created, 3 updated. (1hr 20mins)
5. Working on process for new Events setup - review events and enter regular events. (1hr 15mins)
6. Investigate process for next version of software project for new customer - working on next changes. (7hrs 30mins)
2. Update my record of time worked. (5mins)
3. Accounting. (15mins)
4. Invoice reconciliation - 2 paid, 2 created, 3 updated. (1hr 20mins)
5. Working on process for new Events setup - review events and enter regular events. (1hr 15mins)
6. Investigate process for next version of software project for new customer - working on next changes. (7hrs 30mins)
Monday, October 28, 2013
Today's work on/in the business - Sun 27 Oct
1. Anti virus and malware scans on my laptop, as this needs to be done regularly to be sure it is clean - other two reported clean. (10hrs 45mins)
2. Update my record of time worked. (25mins)
3. Review progress made this week and ensure the schedule is right for next week. (20mins)
2. Update my record of time worked. (25mins)
3. Review progress made this week and ensure the schedule is right for next week. (20mins)
Sunday, October 27, 2013
Today's work on/in the business - Sat 26 Oct
1. Finish scanning customer's laptop hard drive, to confirm it is clean - except it still had issues. (1hr 15mins)
2. Update my record of time worked. (15mins)
3. Review progress made this week. (15mins)
4. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (10mins)
5. Backup my mail locally. (1hr 50mins)
6. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - first one reported clean. (9hrs)
2. Update my record of time worked. (15mins)
3. Review progress made this week. (15mins)
4. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (10mins)
5. Backup my mail locally. (1hr 50mins)
6. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - first one reported clean. (9hrs)
Saturday, October 26, 2013
Today's work on/in the business - Fri 25 Oct
1. Update my record of time worked. (5mins)
2. Review progress made this week. (55mins)
3. Free space on laptop. (1hr 50mins)
4. Investigate process for next version of software project for new customer - working on next changes. (5hrs 5mins)
5. Start scanning customer's laptop hard drive, to confirm it is clean. (3hrs 15mins)
2. Review progress made this week. (55mins)
3. Free space on laptop. (1hr 50mins)
4. Investigate process for next version of software project for new customer - working on next changes. (5hrs 5mins)
5. Start scanning customer's laptop hard drive, to confirm it is clean. (3hrs 15mins)
Friday, October 25, 2013
Today's work on/in the business - Thurs 24 Oct
1. Update my record of time worked. (10mins)
2. Review progress made this week. (30mins)
3. Read small business blogs. (2hrs 20mins)
4. Update a blog post to confirm that we can edit each other's posts. (10mins)
5. Trip to bank cheque and post BAS form. (45mins)
2. Review progress made this week. (30mins)
3. Read small business blogs. (2hrs 20mins)
4. Update a blog post to confirm that we can edit each other's posts. (10mins)
5. Trip to bank cheque and post BAS form. (45mins)
Thursday, October 24, 2013
Today's work on/in the business - Wed 23 Oct
1. Update my record of time worked. (5mins)
2. Review progress made this week. (30mins)
3. Send email to prospect. (5mins)
4. BAS. (35mins)
5. Finalise testing new files created (recreated) for support customer - complete run through of processes to confirm all functionality. (50mins)
6. Very basic draft of another blog post. (5mins)
7. Investigate issues with server in back office. (2hrs 15mins)
House inspection tomorrow, so some time taken up with cleaning and tidying.
2. Review progress made this week. (30mins)
3. Send email to prospect. (5mins)
4. BAS. (35mins)
5. Finalise testing new files created (recreated) for support customer - complete run through of processes to confirm all functionality. (50mins)
6. Very basic draft of another blog post. (5mins)
7. Investigate issues with server in back office. (2hrs 15mins)
House inspection tomorrow, so some time taken up with cleaning and tidying.
Wednesday, October 23, 2013
Today's work on/in the business - Tues 22 Oct
1. Update my record of time worked. (10mins)
2. Review progress made this week. (25mins)
3. Work on draft email for prospect - includes cleaning up information on associate's server. (4hrs)
4. Read small business blogs. (4hrs)
5. Write a blog post. (35mins)
6. Working on process for new Events setup - look for password, confirm account is suspended. (20mins)
2. Review progress made this week. (25mins)
3. Work on draft email for prospect - includes cleaning up information on associate's server. (4hrs)
4. Read small business blogs. (4hrs)
5. Write a blog post. (35mins)
6. Working on process for new Events setup - look for password, confirm account is suspended. (20mins)
Tuesday, October 22, 2013
Today's work on/in the business - Mon 21 Oct
1. Malware scan on my laptop, as this needs to be done regularly to be sure it is clean - finished. (30mins)
2. Update my record of time worked. (5mins)
3. Review progress made this week. (25mins)
4. Work on draft email for prospect - includes cleaning up information on associate's server. (7hrs 15mins)
5. Working on process for new Events setup - membership updates. (10mins)
2. Update my record of time worked. (5mins)
3. Review progress made this week. (25mins)
4. Work on draft email for prospect - includes cleaning up information on associate's server. (7hrs 15mins)
5. Working on process for new Events setup - membership updates. (10mins)
Monday, October 21, 2013
Today's work on/in the business - Sun 20 Oct
1. Anti virus and malware scans on my laptop, as this needs to be done regularly to be sure it is clean - other two reported clean. (12hrs 10mins)
2. Update my record of time worked. (5mins)
2. Update my record of time worked. (5mins)
Sunday, October 20, 2013
Today's work on/in the business - Sat 19 Oct
1. Update my record of time worked. (20mins)
2. Review progress made this week and ensure the schedule is right for next week. (40mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (15mins)
4. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - first one reported clean. (12hrs 35mins)
2. Review progress made this week and ensure the schedule is right for next week. (40mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (15mins)
4. Anti virus scans on my laptop, as this needs to be done regularly to be sure it is clean - first one reported clean. (12hrs 35mins)
Saturday, October 19, 2013
Today's work on/in the business - Fri 18 Oct
1. Update my record of time worked. (10mins)
2. Review progress made this week. (45mins)
3. Accounting. (25mins)
4. Draft email for prospect. (50mins)
5. Write one blog post and setup outlines for a couple more. (55mins)
6. Read small business blogs. (45mins)
7. Invoice reconciliation - 4 updated, 1 sent out. (40mins)
8. Backup my mail locally. (2hrs)
2. Review progress made this week. (45mins)
3. Accounting. (25mins)
4. Draft email for prospect. (50mins)
5. Write one blog post and setup outlines for a couple more. (55mins)
6. Read small business blogs. (45mins)
7. Invoice reconciliation - 4 updated, 1 sent out. (40mins)
8. Backup my mail locally. (2hrs)
Friday, October 18, 2013
Today's work on/in the business - Thurs 17 Oct
1. Update my record of time worked. (5mins)
2. Review progress made this week. (1hr)
3. Review software re another project for software customer. (1hr 50mins)
4. Filing! (2hrs 15mins)
5. Contact prospects - 2 messages sent and one followed up. (35mins)
6. Read small business blogs. (2hrs 20mins)
7. Trip to bank cheque. (30mins)
2. Review progress made this week. (1hr)
3. Review software re another project for software customer. (1hr 50mins)
4. Filing! (2hrs 15mins)
5. Contact prospects - 2 messages sent and one followed up. (35mins)
6. Read small business blogs. (2hrs 20mins)
7. Trip to bank cheque. (30mins)
Thursday, October 17, 2013
Today's work on/in the business - Wed 16 Oct
1. Update my record of time worked. (10mins)
2. Review progress made this week. (35mins)
3. Continue testing new files created (recreated) for support customer - basic check of existing processes work - still need to do complete run through of processes to confirm all functionality. (5hrs 15mins)
4. Working on process for new Events setup - still issues with her setup. (10mins)
5. Read small business blogs. (35mins)
2. Review progress made this week. (35mins)
3. Continue testing new files created (recreated) for support customer - basic check of existing processes work - still need to do complete run through of processes to confirm all functionality. (5hrs 15mins)
4. Working on process for new Events setup - still issues with her setup. (10mins)
5. Read small business blogs. (35mins)
Wednesday, October 16, 2013
Today's work on/in the business - Tues 15 Oct
1. Update my record of time worked. (10mins)
2. Review progress made this week. (30mins)
3. Read small business blogs. (1hr 35mins)
4. Continue testing new files created (recreated) for support customer - almost all right, now I have it running properly. (3hrs 30mins)
5. Working on process for new Events setup - membership queries. (10mins)
2. Review progress made this week. (30mins)
3. Read small business blogs. (1hr 35mins)
4. Continue testing new files created (recreated) for support customer - almost all right, now I have it running properly. (3hrs 30mins)
5. Working on process for new Events setup - membership queries. (10mins)
Tuesday, October 15, 2013
Today's work on/in the business - Mon 14 Oct
1. Update my record of time worked. (5mins)
2. Review progress made this week. (45mins)
3. Accounting. (25mins)
4. Send email re quote for another project for software customer and turn down logging level on server. (25mins)
5. Assist with changes in response to ranking query from website customer. (1hr 45mins)
6. Investigate contract work - one email sent. (10mins)
7. Read small business blogs. (3hrs 10mins)
2. Review progress made this week. (45mins)
3. Accounting. (25mins)
4. Send email re quote for another project for software customer and turn down logging level on server. (25mins)
5. Assist with changes in response to ranking query from website customer. (1hr 45mins)
6. Investigate contract work - one email sent. (10mins)
7. Read small business blogs. (3hrs 10mins)
Monday, October 14, 2013
Today's work on/in the business - Sun 13 Oct
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (1hr 25mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Invoice reconciliation - 2 updated. (25mins)
5. Backup my mail locally. (1hr 40mins)
2. Review progress made this week and ensure the schedule is right for next week. (1hr 25mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Invoice reconciliation - 2 updated. (25mins)
5. Backup my mail locally. (1hr 40mins)
Sunday, October 13, 2013
Today's work on/in the business - Sat 12 Oct
1. Anti virus and malware scans on my laptop, as this needs to be done regularly to be sure it is clean - the other three finished and reported clean. (11hrs)
2. Update my record of time worked. (10mins)
2. Update my record of time worked. (10mins)
Saturday, October 12, 2013
Today's work on/in the business - Fri 11 Oct
1. Update my record of time worked. (5mins)
2. Investigate contract work - 6 applications sent out. (55mins)
3. Review progress made this week. (1hr 5mins)
4. Install Windows updates, when icon will not show up. (1hr 5mins)
5. Anti virus and malware scans on my laptop, as this needs to be done regularly to be sure it is clean - one finished and reported clean. (9hrs 30mins)
2. Investigate contract work - 6 applications sent out. (55mins)
3. Review progress made this week. (1hr 5mins)
4. Install Windows updates, when icon will not show up. (1hr 5mins)
5. Anti virus and malware scans on my laptop, as this needs to be done regularly to be sure it is clean - one finished and reported clean. (9hrs 30mins)
Friday, October 11, 2013
Today's work on/in the business - Thurs 10 Oct
1. Update my record of time worked. (10mins)
2. Review progress made this week. (50mins)
3. Investigate contract work. (2hrs 20mins)
4. Read small business blogs. (30mins)
A day where I just could not focus, unfortunately.
2. Review progress made this week. (50mins)
3. Investigate contract work. (2hrs 20mins)
4. Read small business blogs. (30mins)
A day where I just could not focus, unfortunately.
Thursday, October 10, 2013
Today's work on/in the business - Wed 9 Oct
1. Update my record of time worked. (10mins)
2. Review progress made this week. (55mins)
3. Send queries about other project on customer's server. (5mins)
4. Read small business blogs. (1hr 20mins)
5. Invoice reconciliation - 3 finalised and sent out, 2 updated. (1hr 5mins)
6. Assist with ranking query from website customer. (10mins)
7. Investigate contract work. (3hrs 35mins)
2. Review progress made this week. (55mins)
3. Send queries about other project on customer's server. (5mins)
4. Read small business blogs. (1hr 20mins)
5. Invoice reconciliation - 3 finalised and sent out, 2 updated. (1hr 5mins)
6. Assist with ranking query from website customer. (10mins)
7. Investigate contract work. (3hrs 35mins)
Wednesday, October 9, 2013
Today's work on/in the business - Tues 8 Oct
1. Update my record of time worked. (10mins)
2. Review progress made this week. (35mins)
3. Work for Perfect Notes Virtual Assistant customer. (35mins)
4. Finalise installation of other project on customer's server. (3hrs 5mins)
5. Working on process for new Events setup - review events. (10mins)
6. Read small business blogs. (4hrs 40mins)
2. Review progress made this week. (35mins)
3. Work for Perfect Notes Virtual Assistant customer. (35mins)
4. Finalise installation of other project on customer's server. (3hrs 5mins)
5. Working on process for new Events setup - review events. (10mins)
6. Read small business blogs. (4hrs 40mins)
Tuesday, October 8, 2013
Today's work on/in the business - Mon 7 Oct
1. Catch up with old customer over dinner to discuss future possibilities, although it does not look likely that we will get any more work out of them. (30mins)
A beautiful day out in Geelong West watching the track racing as part of the Masters Games! Sun, wind, fresh air, fun and friends.
A beautiful day out in Geelong West watching the track racing as part of the Masters Games! Sun, wind, fresh air, fun and friends.
Today's work on/in the business - Sun 6 Oct
1. Anti virus and malware scans on my laptop, as this needs to be done regularly to be sure it is clean - all reported clean. (10hrs 55mins)
2. Update my record of time worked. (5mins)
2. Update my record of time worked. (5mins)
Sunday, October 6, 2013
Today's work on/in the business - Sat 5 Oct
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (25mins)
3. Accounting. (20mins)
4. Invoice reconciliation - 1 finalised and sent out, 1 finalised, 3 updated. (1hr 5mins)
5. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
6. Backup my mail locally. (20mins)
7. Anti virus and malware scans on my laptop, as this needs to be done regularly to be sure it is clean. (8hrs)
2. Review progress made this week and ensure the schedule is right for next week. (25mins)
3. Accounting. (20mins)
4. Invoice reconciliation - 1 finalised and sent out, 1 finalised, 3 updated. (1hr 5mins)
5. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
6. Backup my mail locally. (20mins)
7. Anti virus and malware scans on my laptop, as this needs to be done regularly to be sure it is clean. (8hrs)
Saturday, October 5, 2013
Today's work on/in the business - Fri 4 Oct
1. Update my record of time worked. (5mins)
2. Review progress made this week. (40mins)
3. Setup for installation of other project on customer's server. (6hrs 5mins)
2. Review progress made this week. (40mins)
3. Setup for installation of other project on customer's server. (6hrs 5mins)
Friday, October 4, 2013
Today's work on/in the business - Thurs 3 Oct
1. Update my record of time worked. (10mins)
2. Review progress made this week. (55mins)
3. Setup for installation of other project on customer's server. (5hrs)
4. Read small business blogs. (1hr)
2. Review progress made this week. (55mins)
3. Setup for installation of other project on customer's server. (5hrs)
4. Read small business blogs. (1hr)
Thursday, October 3, 2013
Today's work on/in the business - Wed 2 Oct
1. Update my record of time worked. (15mins)
2. Review progress made this week. (35mins)
3. Setup for installation of other project on customer's server. (6hrs 35mins)
2. Review progress made this week. (35mins)
3. Setup for installation of other project on customer's server. (6hrs 35mins)
Wednesday, October 2, 2013
Today's work on/in the business - Tues 1 Oct
1. Update my record of time worked. (10mins)
2. Review progress made this week. (40mins)
3. Determine whether we met the KPIs (Key Performance Indicators) for September 2013. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise (although I have been riding more and I'm now doing weights regularly) and we need to work on contacting new prospects too (still). Of course, the online networking KPI was not met, although it was at the same level as last month. (15mins)
4. Read small business blogs. (1hr 5mins)
5. Support for website customer - trying to setup local mail so that we can provide instructions. (50mins)
6. Setup for installation of other project on customer's server. (4hrs 15mins)
2. Review progress made this week. (40mins)
3. Determine whether we met the KPIs (Key Performance Indicators) for September 2013. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise (although I have been riding more and I'm now doing weights regularly) and we need to work on contacting new prospects too (still). Of course, the online networking KPI was not met, although it was at the same level as last month. (15mins)
4. Read small business blogs. (1hr 5mins)
5. Support for website customer - trying to setup local mail so that we can provide instructions. (50mins)
6. Setup for installation of other project on customer's server. (4hrs 15mins)
Tuesday, October 1, 2013
Today's work on/in the business - Mon 30 Sept
1. Update my record of time worked. (5mins)
2. Review progress made last week and ensure the schedule is right for this week. (55mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Backup my mail locally. (8hrs 5mins)
5. Accounting. (10mins)
6. Invoice reconciliation - 2 updated, 1 started. (10mins)
7. Support for website customer - trying to setup local mail so that we can provide instructions. (35mins)
2. Review progress made last week and ensure the schedule is right for this week. (55mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Backup my mail locally. (8hrs 5mins)
5. Accounting. (10mins)
6. Invoice reconciliation - 2 updated, 1 started. (10mins)
7. Support for website customer - trying to setup local mail so that we can provide instructions. (35mins)
Monday, September 30, 2013
Today's work on/in the business - Sun 29 Sept
1. Update my record of time worked. (5mins)
2. Anti virus and malware scans on my laptop, as I had to connect it to our network - only a few popups reported. (10hrs 25mins)
2. Anti virus and malware scans on my laptop, as I had to connect it to our network - only a few popups reported. (10hrs 25mins)
Sunday, September 29, 2013
Today's work on/in the business - Sat 28 Sept
1. Update my record of time worked. (5mins)
2. Review progress made this week. (30mins)
3. Working on process for new Events setup - address issue with display details on cancellation. (30mins)
4. Setup for installation of other project on customer's server. (55mins)
5. Anti virus scans on my laptop, as I had to connect it to our network - so far reported clean. (8hrs)
2. Review progress made this week. (30mins)
3. Working on process for new Events setup - address issue with display details on cancellation. (30mins)
4. Setup for installation of other project on customer's server. (55mins)
5. Anti virus scans on my laptop, as I had to connect it to our network - so far reported clean. (8hrs)
Saturday, September 28, 2013
Today's work on/in the business - Fri 27 Sept
1. Update my record of time worked. (5mins)
2. Review progress made this week. (1hr 10mins)
3. Working on process for new Events setup - review events. (40mins)
4. Setup for installation of other project on customer's server. (6hrs 35mins)
5. Anti virus scans on my laptop, as I had to connect it to our network - so far reported clean. (1hr)
2. Review progress made this week. (1hr 10mins)
3. Working on process for new Events setup - review events. (40mins)
4. Setup for installation of other project on customer's server. (6hrs 35mins)
5. Anti virus scans on my laptop, as I had to connect it to our network - so far reported clean. (1hr)
Friday, September 27, 2013
Today's work on/in the business - Thurs 26 Sept
1. Update my record of time worked. (10mins)
2. Review progress made this week. (45mins)
3. Accounting. (45mins)
4. Invoice reconciliation - 1 finalised and sent out, 3 updated, 2 started. (1hr 30mins)
5. Working on process for new Events setup - review events. (45mins)
6. Read small business blogs. (3hrs)
2. Review progress made this week. (45mins)
3. Accounting. (45mins)
4. Invoice reconciliation - 1 finalised and sent out, 3 updated, 2 started. (1hr 30mins)
5. Working on process for new Events setup - review events. (45mins)
6. Read small business blogs. (3hrs)
Thursday, September 26, 2013
Today's work on/in the business - Wed 25 Sept
1. Update my record of time worked. (10mins)
2. Review progress made this week. (50mins)
3. Working on process for new Events setup - review events and enter regular events. (1hr 30mins)
4. Investigate process for next version of software project for new customer - working on next changes. (1hr 50mins)
5. Backup my mail locally. (15mins)
2. Review progress made this week. (50mins)
3. Working on process for new Events setup - review events and enter regular events. (1hr 30mins)
4. Investigate process for next version of software project for new customer - working on next changes. (1hr 50mins)
5. Backup my mail locally. (15mins)
Wednesday, September 25, 2013
Today's work on/in the business - Tues 24 Sept
1. Update my record of time worked. (10mins)
2. Review progress made this week. (1hr)
3. Investigate process for next version of software project for new customer - working on next changes. (9hrs 5mins)
4. Anti virus scans on my laptop, as it appears to have acquired a virus again - a 4th tool that found a couple of things that the others had not! (35mins)
2. Review progress made this week. (1hr)
3. Investigate process for next version of software project for new customer - working on next changes. (9hrs 5mins)
4. Anti virus scans on my laptop, as it appears to have acquired a virus again - a 4th tool that found a couple of things that the others had not! (35mins)
Tuesday, September 24, 2013
Today's work on/in the business - Mon 23 Sept
1. Update my record of time worked. (10mins)
2. Anti virus scans on my laptop, as it appears to have acquired a virus again! (6hrs 40mins)
3. Work for Perfect Notes Virtual Assistant customer. (1hr 10mins)
4. Investigate process for next version of software project for new customer - working on next changes. (5hrs 35mins)
5. Review progress made this week. (50mins)
2. Anti virus scans on my laptop, as it appears to have acquired a virus again! (6hrs 40mins)
3. Work for Perfect Notes Virtual Assistant customer. (1hr 10mins)
4. Investigate process for next version of software project for new customer - working on next changes. (5hrs 35mins)
5. Review progress made this week. (50mins)
Monday, September 23, 2013
Today's work on/in the business - Sun 22 Sept
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - working on next changes. (7hrs 10mins)
3. Review progress made this week. (45mins)
4. Anti virus scans on my laptop, as it appears to have acquired a virus again! (3hrs 30mins)
2. Investigate process for next version of software project for new customer - working on next changes. (7hrs 10mins)
3. Review progress made this week. (45mins)
4. Anti virus scans on my laptop, as it appears to have acquired a virus again! (3hrs 30mins)
Sunday, September 22, 2013
Today's work on/in the business - Sat 21 Sept
1. Update my record of time worked. (10mins)
2. Review progress made this week and ensure the schedule is right for next week. (45mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Backup my mail locally. (20mins)
5. Read small business blogs. (10mins)
6. Work for Perfect Notes Virtual Assistant customer. (15mins)
7. Investigate process for next version of software project for new customer - working on next changes. (6hrs 45mins)
2. Review progress made this week and ensure the schedule is right for next week. (45mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Backup my mail locally. (20mins)
5. Read small business blogs. (10mins)
6. Work for Perfect Notes Virtual Assistant customer. (15mins)
7. Investigate process for next version of software project for new customer - working on next changes. (6hrs 45mins)
Saturday, September 21, 2013
Today's work on/in the business - Fri 20 Sept
1. Investigate process for next version of software project for new customer - working on next changes. (7hrs 50mins)
2. Update my record of time worked. (10mins)
3. Review progress made this week. (30mins)
4. Read small business blogs. (1hr 45mins)
2. Update my record of time worked. (10mins)
3. Review progress made this week. (30mins)
4. Read small business blogs. (1hr 45mins)
Friday, September 20, 2013
Today's work on/in the business - Thurs 19 Sept
1. Update my record of time worked. (10mins)
2. Review progress made this week. (1hr)
3. Investigate process for next version of software project for new customer - working on next changes. (8hrs 35mins)
2. Review progress made this week. (1hr)
3. Investigate process for next version of software project for new customer - working on next changes. (8hrs 35mins)
Thursday, September 19, 2013
Today's work on/in the business - Wed 18 Sept
1. Update my record of time worked. (5mins)
2. Review progress made this week. (40mins)
3. Investigate process for next version of software project for new customer - working on next changes. (8hrs 35mins)
2. Review progress made this week. (40mins)
3. Investigate process for next version of software project for new customer - working on next changes. (8hrs 35mins)
Wednesday, September 18, 2013
Today's work on/in the business - Tues 17 Sept
1. Update my record of time worked. (5mins)
2. Review progress made this week. (1hr 10mins)
3. Support for website customer. (1hr 10mins)
4. Investigate process for next version of software project for new customer - working on next changes. (5hrs 45mins)
5. Backup my mail locally. (20mins)
2. Review progress made this week. (1hr 10mins)
3. Support for website customer. (1hr 10mins)
4. Investigate process for next version of software project for new customer - working on next changes. (5hrs 45mins)
5. Backup my mail locally. (20mins)
Tuesday, September 17, 2013
Today's work on/in the business - Mon 16 Sept
1. Update my record of time worked. (10mins)
2. Backup my mail locally. (40mins)
3. Review progress made this week. (30mins)
4. Support for website customer. (1hr 5mins)
5. Investigate process for next version of software project for new customer - working on next changes. (7hrs 20mins)
2. Backup my mail locally. (40mins)
3. Review progress made this week. (30mins)
4. Support for website customer. (1hr 5mins)
5. Investigate process for next version of software project for new customer - working on next changes. (7hrs 20mins)
Monday, September 16, 2013
Today's work on/in the business - Sun 15 Sept
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (40mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Accounting. (15mins)
5. Invoice reconciliation - 3 updated, 1 started, 1 sent out. (40mins)
6. Investigate process for next version of software project for new customer - working on next changes. (7hrs 30mins)
7. Working on process for new Events setup - review events. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (40mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Accounting. (15mins)
5. Invoice reconciliation - 3 updated, 1 started, 1 sent out. (40mins)
6. Investigate process for next version of software project for new customer - working on next changes. (7hrs 30mins)
7. Working on process for new Events setup - review events. (5mins)
Sunday, September 15, 2013
Today's work on/in the business - Sat 14 Sept
1. Update my record of time worked. (10mins)
2. Review progress made this week. (30mins)
3. Investigate process for next version of software project for new customer - working on next changes. (2hrs 30mins)
2. Review progress made this week. (30mins)
3. Investigate process for next version of software project for new customer - working on next changes. (2hrs 30mins)
Saturday, September 14, 2013
Today's work on/in the business - Fri 13 Sept
1. Update my record of time worked. (10mins)
2. Review progress made this week. (40mins)
3. Invoice reconciliation - 1 paid. (10mins)
4. Investigate process for next version of software project for new customer - working on next changes. (5hrs 55mins)
5. Provide lost password to support customer. (15mins)
2. Review progress made this week. (40mins)
3. Invoice reconciliation - 1 paid. (10mins)
4. Investigate process for next version of software project for new customer - working on next changes. (5hrs 55mins)
5. Provide lost password to support customer. (15mins)
Friday, September 13, 2013
Today's work on/in the business - Thurs 12 Sept
1. Update my record of time worked. (10mins)
2. Review progress made this week. (1hr 10mins)
3. Investigate process for next version of software project for new customer - working on next changes. (5hrs 5mins)
4. Find and burn a different version of Ubuntu for server fix up. (1hr 35mins)
5. Read small business blogs. (45mins)
2. Review progress made this week. (1hr 10mins)
3. Investigate process for next version of software project for new customer - working on next changes. (5hrs 5mins)
4. Find and burn a different version of Ubuntu for server fix up. (1hr 35mins)
5. Read small business blogs. (45mins)
Thursday, September 12, 2013
Today's work on/in the business - Wed 11 Sept
1. Small business webinar. (1hr 5mins)
2. Update my record of time worked. (5mins)
3. Find and burn latest version of Ubuntu for server fix up. (2hrs 55mins)
4. Top up mobile broadband. (5mins)
5. Trying to write double layered DVD again - failed again - give up on this. (15mins)
6. Review progress made this week. (30mins)
7. Working on process for new Events setup - review events. (10mins)
8. Investigate process for next version of software project for new customer - working on next changes. (30mins)
9. Read small business blogs. (4hrs 20mins)
2. Update my record of time worked. (5mins)
3. Find and burn latest version of Ubuntu for server fix up. (2hrs 55mins)
4. Top up mobile broadband. (5mins)
5. Trying to write double layered DVD again - failed again - give up on this. (15mins)
6. Review progress made this week. (30mins)
7. Working on process for new Events setup - review events. (10mins)
8. Investigate process for next version of software project for new customer - working on next changes. (30mins)
9. Read small business blogs. (4hrs 20mins)
Wednesday, September 11, 2013
Today's work on/in the business - Tues 10 Sept
1. Update my record of time worked. (10mins)
2. Review progress made this week. (40mins)
3. Investigate process for next version of software project for new customer - working on next changes. (50mins)
Then we went to see the Tall Ships at Williamstown - what a brilliant afternoon out with friends!
2. Review progress made this week. (40mins)
3. Investigate process for next version of software project for new customer - working on next changes. (50mins)
Then we went to see the Tall Ships at Williamstown - what a brilliant afternoon out with friends!
Tuesday, September 10, 2013
Today's work on/in the business - Mon 9 Sept
1. Anti virus scan on my laptop - clean. (1hr 5mins)
2. Update my record of time worked. (15mins)
3. Review progress made this week. (40mins)
4. Meeting with Perfect Notes Virtual Assistant customer to collect the last information. (1hr 45mins)
5. Investigate process for next version of software project for new customer - working on next changes. (4hrs 15mins)
2. Update my record of time worked. (15mins)
3. Review progress made this week. (40mins)
4. Meeting with Perfect Notes Virtual Assistant customer to collect the last information. (1hr 45mins)
5. Investigate process for next version of software project for new customer - working on next changes. (4hrs 15mins)
Monday, September 9, 2013
Today's work on/in the business - Sun 8 Sept
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (50mins)
3. Accounting. (50mins)
4. Invoice reconciliation - 1 updated, 2 started. (30mins)
5. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
6. Anti virus scan on my laptop. (5hrs 25mins)
7. Trying to burn software for Mac OSX 10.6 - failed. (1hr)
2. Review progress made this week and ensure the schedule is right for next week. (50mins)
3. Accounting. (50mins)
4. Invoice reconciliation - 1 updated, 2 started. (30mins)
5. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
6. Anti virus scan on my laptop. (5hrs 25mins)
7. Trying to burn software for Mac OSX 10.6 - failed. (1hr)
Sunday, September 8, 2013
Today's work on/in the business - Sat 7 Sept
1. Update my record of time worked. (10mins)
2. Review progress made this week. (45mins)
3. Support for website customer. (45mins)
4. Read small business blogs. (10mins)
5. Backup my mail locally and create second backup. (5hrs 5mins)
2. Review progress made this week. (45mins)
3. Support for website customer. (45mins)
4. Read small business blogs. (10mins)
5. Backup my mail locally and create second backup. (5hrs 5mins)
Saturday, September 7, 2013
Today's work on/in the business - Fri 6 Sept
1. Update my record of time worked. (10mins)
2. Review progress made this week. (55mins)
3. Backup my mail locally. (5mins)
4. Investigate process for next version of software project for new customer - working on next changes. (2hrs 15mins)
Pretty much a total loss as far as working goes - dentist, trip to drop my partner off on the way to a client and back to dentist (expired card!) - plus shopping - plus organising myself for voting below the line for the Senate tomorrow - yuk!
2. Review progress made this week. (55mins)
3. Backup my mail locally. (5mins)
4. Investigate process for next version of software project for new customer - working on next changes. (2hrs 15mins)
Pretty much a total loss as far as working goes - dentist, trip to drop my partner off on the way to a client and back to dentist (expired card!) - plus shopping - plus organising myself for voting below the line for the Senate tomorrow - yuk!
Friday, September 6, 2013
Today's work on/in the business - Thurs 5 Sept
1. Update my record of time worked. (5mins)
2. Review progress made this week. (50mins)
3. Investigate process for next version of software project for new customer - working on next changes. (7hrs)
4. Backup my mail locally (finally got the settings right). (1hr 40mins)
2. Review progress made this week. (50mins)
3. Investigate process for next version of software project for new customer - working on next changes. (7hrs)
4. Backup my mail locally (finally got the settings right). (1hr 40mins)
Thursday, September 5, 2013
Today's work on/in the business - Wed 4 Sept
1. Update my record of time worked. (10mins)
2. Review progress made this week. (35mins)
3. Investigate process for next version of software project for new customer - phone call and working on next changes. (6hrs 15mins)
2. Review progress made this week. (35mins)
3. Investigate process for next version of software project for new customer - phone call and working on next changes. (6hrs 15mins)
Wednesday, September 4, 2013
Today's work on/in the business - Tues 3 Sept
1. Update my record of time worked. (5mins)
2. Review progress made this week. (30mins)
3. Invoice reconciliation - 3 paid. (15mins)
4. Investigate process for next version of software project for new customer - email correspondence and working on next changes. (2hrs 25mins)
5. Read small business blogs. (50mins)
6. Investigate contract work. (1hr 50mins)
7. Looking at Ruby products. (15mins)
2. Review progress made this week. (30mins)
3. Invoice reconciliation - 3 paid. (15mins)
4. Investigate process for next version of software project for new customer - email correspondence and working on next changes. (2hrs 25mins)
5. Read small business blogs. (50mins)
6. Investigate contract work. (1hr 50mins)
7. Looking at Ruby products. (15mins)
Tuesday, September 3, 2013
Today's work on/in the business - Mon 2 Sept
1. Update my record of time worked. (10mins)
2. Review progress made this week. (50mins)
3. Determine whether we met the KPIs (Key Performance Indicators) for August 2013. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise (although I have been riding more and I'm now doing weights regularly) and we need to work on contacting new prospects too (still). Of course, the online networking KPI was not met, although it was better again this month. (15mins)
4. Investigate process for next version of software project for new customer - working on next changes. (5hrs 50mins)
5. Top up mobile phone. (5mins)
2. Review progress made this week. (50mins)
3. Determine whether we met the KPIs (Key Performance Indicators) for August 2013. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise (although I have been riding more and I'm now doing weights regularly) and we need to work on contacting new prospects too (still). Of course, the online networking KPI was not met, although it was better again this month. (15mins)
4. Investigate process for next version of software project for new customer - working on next changes. (5hrs 50mins)
5. Top up mobile phone. (5mins)
Monday, September 2, 2013
Today's work on/in the business - Sun 1 Sept
1. Final scan on my laptop - clean. (1hr 5mins)
2. Update my record of time worked. (10mins)
3. Review progress made this week. (50mins)
4. Read small business blogs. (10mins)
5. Invoice reconciliation - 1 updated, 6 finalised and sent out. (2hrs)
6. Work for Perfect Notes Virtual Assistant customer. (15mins)
7. Investigate process for next version of software project for new customer - working on next changes. (40mins)
2. Update my record of time worked. (10mins)
3. Review progress made this week. (50mins)
4. Read small business blogs. (10mins)
5. Invoice reconciliation - 1 updated, 6 finalised and sent out. (2hrs)
6. Work for Perfect Notes Virtual Assistant customer. (15mins)
7. Investigate process for next version of software project for new customer - working on next changes. (40mins)
Sunday, September 1, 2013
Today's work on/in the business - Sat 31 Aug
1. Update my record of time worked. (15mins)
2. Free space on my laptop. (1hr 55mins)
3. Working on process for new Events setup - review events. (5mins)
4. Review progress made this week and ensure the schedule is right for next week. (45mins)
5. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (10mins)
6. Invoice reconciliation - 1 updated, 1 part payment received. (15mins)
7. Accounting. (15mins)
8. Final scan on my laptop. (2hrs 35mins)
2. Free space on my laptop. (1hr 55mins)
3. Working on process for new Events setup - review events. (5mins)
4. Review progress made this week and ensure the schedule is right for next week. (45mins)
5. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (10mins)
6. Invoice reconciliation - 1 updated, 1 part payment received. (15mins)
7. Accounting. (15mins)
8. Final scan on my laptop. (2hrs 35mins)
Saturday, August 31, 2013
Today's work on/in the business - Fri 30 Aug
1. Update my record of time worked. (10mins)
2. Review progress made this week. (40mins)
3. Invoice reconciliation - 1 started, 1 updated, 1 part payment received. (15mins)
4. Accounting. (10mins)
5. Investigate process for next version of software project for new customer - investigate another process in version control, working on next changes. (4hrs 15mins)
6. Anti malware scan on my laptop - clean. (35mins)
2. Review progress made this week. (40mins)
3. Invoice reconciliation - 1 started, 1 updated, 1 part payment received. (15mins)
4. Accounting. (10mins)
5. Investigate process for next version of software project for new customer - investigate another process in version control, working on next changes. (4hrs 15mins)
6. Anti malware scan on my laptop - clean. (35mins)
Friday, August 30, 2013
Today's work on/in the business - Thurs 29 Aug
1. Update my record of time worked. (10mins)
2. Read small business blogs. (5mins)
3. Review progress made this week. (1hr 5mins)
4. Invoice reconciliation - 1 started, 2 updated. (1hr 35mins)
5. Investigate process for next version of software project for new customer - investigate setting up new server, working on next changes including setting it up on new server. (2hrs 30mins)
6. Anti virus scan on my laptop - clean. (3hrs)
2. Read small business blogs. (5mins)
3. Review progress made this week. (1hr 5mins)
4. Invoice reconciliation - 1 started, 2 updated. (1hr 35mins)
5. Investigate process for next version of software project for new customer - investigate setting up new server, working on next changes including setting it up on new server. (2hrs 30mins)
6. Anti virus scan on my laptop - clean. (3hrs)
Thursday, August 29, 2013
Today's work on/in the business - Wed 28 Aug
1. Update my record of time worked. (15mins)
2. Review progress made this week. (40mins)
3. Small business webinars. (2hrs)
4. Investigate process for next version of software project for new customer - working on next changes. (2hrs 45mins)
5. Invoice reconciliation - 1 amended and sent out. (10mins)
6. Work for Perfect Notes Virtual Assistant customer. (30mins)
7. Read small business blogs. (1hr 45mins)
2. Review progress made this week. (40mins)
3. Small business webinars. (2hrs)
4. Investigate process for next version of software project for new customer - working on next changes. (2hrs 45mins)
5. Invoice reconciliation - 1 amended and sent out. (10mins)
6. Work for Perfect Notes Virtual Assistant customer. (30mins)
7. Read small business blogs. (1hr 45mins)
Wednesday, August 28, 2013
Today's work on/in the business - Tues 27 Aug
1. Update my record of time worked. (10mins)
2. Review progress made this week. (50mins)
3. Invoice reconciliation - 3 sent out. (10mins)
4. Investigate process for next version of software project for new customer - email correspondence and working on next changes. (5hrs 25mins)
5. Read small business blogs. (2hrs 10mins)
2. Review progress made this week. (50mins)
3. Invoice reconciliation - 3 sent out. (10mins)
4. Investigate process for next version of software project for new customer - email correspondence and working on next changes. (5hrs 25mins)
5. Read small business blogs. (2hrs 10mins)
Tuesday, August 27, 2013
Today's work on/in the business - Mon 26 Aug
1. Update my record of time worked. (5mins)
2. Working on process for new Events setup - review events. (15mins)
3. Review progress made last week and ensure the schedule is right for this week. (40mins)
4. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
5. Invoice reconciliation - 2 finalised. (2hrs 35mins)
6. Investigate process for next version of software project for new customer - discussion re testing requirements and working on next changes. (1hr 35mins)
2. Working on process for new Events setup - review events. (15mins)
3. Review progress made last week and ensure the schedule is right for this week. (40mins)
4. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
5. Invoice reconciliation - 2 finalised. (2hrs 35mins)
6. Investigate process for next version of software project for new customer - discussion re testing requirements and working on next changes. (1hr 35mins)
Monday, August 26, 2013
Today's work on/in the business - Sun 25 Aug
1. Update my record of time worked. (5mins)
2. Review progress made this week. (1hr 20mins)
3. Accounting. (25mins)
4. Invoice reconciliation - 2 paid, 1 finalised, 2 started and 4 updated. (1hr 5mins)
2. Review progress made this week. (1hr 20mins)
3. Accounting. (25mins)
4. Invoice reconciliation - 2 paid, 1 finalised, 2 started and 4 updated. (1hr 5mins)
Sunday, August 25, 2013
Today's work on/in the business - Sat 24 Aug
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer - working on next changes, get copy of version control working on backup server. (3hrs 5mins)
3. Working on process for new Events setup - review events. (5mins)
2. Investigate process for next version of software project for new customer - working on next changes, get copy of version control working on backup server. (3hrs 5mins)
3. Working on process for new Events setup - review events. (5mins)
Saturday, August 24, 2013
Today's work on/in the business - Fri 23 Aug
1. Update my record of time worked. (10mins)
2. Work for Perfect Notes Virtual Assistant customer. (45mins)
3. Investigate process for next version of software project for new customer - working on next changes. (5hrs)
4. Working on process for new Events setup - review events and enter regular events. (2hrs)
2. Work for Perfect Notes Virtual Assistant customer. (45mins)
3. Investigate process for next version of software project for new customer - working on next changes. (5hrs)
4. Working on process for new Events setup - review events and enter regular events. (2hrs)
Friday, August 23, 2013
Today's work on/in the business - Thurs 22 Aug
1. Update my record of time worked. (10mins)
2. Review progress made this week. (1hr)
3. Investigate process for next version of software project for new customer - review initial documentation, look at information supplied, working on next changes. (5hrs 25mins)
4. Small business webinar. (1hr 5mins)
5. Read small business blogs. (20mins)
2. Review progress made this week. (1hr)
3. Investigate process for next version of software project for new customer - review initial documentation, look at information supplied, working on next changes. (5hrs 25mins)
4. Small business webinar. (1hr 5mins)
5. Read small business blogs. (20mins)
Thursday, August 22, 2013
Today's work on/in the business - Wed 21 Aug
1. Update my record of time worked. (15mins)
2. Investigate process for next version of software project for new customer - looking into expanded install process, start work on next changes. (9hrs 10mins)
3. Small business webinars. (2hrs 5mins)
4. Read small business blogs. (1hr 15mins)
2. Investigate process for next version of software project for new customer - looking into expanded install process, start work on next changes. (9hrs 10mins)
3. Small business webinars. (2hrs 5mins)
4. Read small business blogs. (1hr 15mins)
Wednesday, August 21, 2013
Today's work on/in the business - Tues 20 Aug
1. Update my record of time worked. (20mins)
2. Next changes to website update for new customer - fix page layout. (5mins)
3. Review progress made this week. (1hr 20mins)
4. Defragment hard drive on my laptop. (50mins)
5. Investigate process for next version of software project for new customer - check version control processes up to date, call to discuss next steps, create and load version with different size (decided not to focus on this right now), looking into expanded install process. (8hrs 5mins)
6. Free space on my laptop. (25mins)
7. Invoice reconciliation - 2 finalised and sent out, 1 finalised and sent for review. (30mins)
8. Read small business blogs. (30mins)
2. Next changes to website update for new customer - fix page layout. (5mins)
3. Review progress made this week. (1hr 20mins)
4. Defragment hard drive on my laptop. (50mins)
5. Investigate process for next version of software project for new customer - check version control processes up to date, call to discuss next steps, create and load version with different size (decided not to focus on this right now), looking into expanded install process. (8hrs 5mins)
6. Free space on my laptop. (25mins)
7. Invoice reconciliation - 2 finalised and sent out, 1 finalised and sent for review. (30mins)
8. Read small business blogs. (30mins)
Tuesday, August 20, 2013
Today's work on/in the business - Mon 19 Aug
1. Investigate process for next version of software project for new customer - look for sample documentation for colleague. (4hrs)
2. Update my record of time worked. (5mins)
3. Review progress made this week. (35mins)
4. Free space on my laptop. (7hrs 10mins)
5. Next changes to website update for new customer - answer query about issue. (5mins)
6. Defragment hard drive on my laptop. (40mins)
2. Update my record of time worked. (5mins)
3. Review progress made this week. (35mins)
4. Free space on my laptop. (7hrs 10mins)
5. Next changes to website update for new customer - answer query about issue. (5mins)
6. Defragment hard drive on my laptop. (40mins)
Monday, August 19, 2013
Today's work on/in the business - Sun 18 Aug
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (1hr 5mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Invoice reconciliation - 4 updated, 2 started, 1 finalised and sent out. (1hr 50mins)
5. Investigate process for next version of software project for new customer - look for sample documentation for colleague. (3hrs 30mins)
2. Review progress made this week and ensure the schedule is right for next week. (1hr 5mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Invoice reconciliation - 4 updated, 2 started, 1 finalised and sent out. (1hr 50mins)
5. Investigate process for next version of software project for new customer - look for sample documentation for colleague. (3hrs 30mins)
Sunday, August 18, 2013
Today's work on/in the business - Sat 17 Aug
1. Update my record of time worked. (10mins)
2. Review progress made this week. (35mins)
3. Accounting. (30mins)
4. Investigate process for next version of software project for new customer - investigate versioning processes more. (40mins)
2. Review progress made this week. (35mins)
3. Accounting. (30mins)
4. Investigate process for next version of software project for new customer - investigate versioning processes more. (40mins)
Saturday, August 17, 2013
Today's work on/in the business - Fri 16 Aug
1. Update my record of time worked. (10mins)
2. Review progress made this week. (40mins)
3. Read small business blogs. (1hr 5mins)
4. Investigate process for next version of software project for new customer - investigate versioning processes more. (2hrs 55mins)
5. Invoice reconciliation - 1 updated and sent out. (10mins)
6. Next changes to website update for new customer - quick changes. She also brought laptop over for technical support. (6hrs 35mins)
2. Review progress made this week. (40mins)
3. Read small business blogs. (1hr 5mins)
4. Investigate process for next version of software project for new customer - investigate versioning processes more. (2hrs 55mins)
5. Invoice reconciliation - 1 updated and sent out. (10mins)
6. Next changes to website update for new customer - quick changes. She also brought laptop over for technical support. (6hrs 35mins)
Friday, August 16, 2013
Today's work on/in the business - Thurs 15 Aug
1. Complete full scan of my laptop - all clean, so the other issue must have been from earlier. (1hr 55mins)
2. Update my record of time worked. (10mins)
3. Investigate process for next version of software project for new customer - investigate versioning processes more. (3hrs 15mins)
4. Small business webinar. (1hr 10mins)
5. Trip to bank cheque. (30mins)
6. Review progress made this week. (40mins)
7. Invoice reconciliation - address query. (10mins)
8. Next changes to website update for new customer - answer questions. (5mins)
2. Update my record of time worked. (10mins)
3. Investigate process for next version of software project for new customer - investigate versioning processes more. (3hrs 15mins)
4. Small business webinar. (1hr 10mins)
5. Trip to bank cheque. (30mins)
6. Review progress made this week. (40mins)
7. Invoice reconciliation - address query. (10mins)
8. Next changes to website update for new customer - answer questions. (5mins)
Thursday, August 15, 2013
Today's work on/in the business - Wed 14 Aug
1. Update my record of time worked. (10mins)
2. Working on process for new Events setup - check access level. (5mins)
3. Review progress made this week. (50mins)
4. Small business webinar. (50mins)
5. Investigate contract work. (15mins)
6. Invoice reconciliation - 3 sent out. (20mins)
7. Investigate process for next version of software project for new customer - finalise install of latest version on testing server, document steps required for go live, investigate versioning processes more. (4hrs 45mins)
8. Start full scan of my laptop, as there is a network issue (but this may well be a hang over from the last time). (2hrs 55mins)
9. Assist with work for website customer. (30mins)
2. Working on process for new Events setup - check access level. (5mins)
3. Review progress made this week. (50mins)
4. Small business webinar. (50mins)
5. Investigate contract work. (15mins)
6. Invoice reconciliation - 3 sent out. (20mins)
7. Investigate process for next version of software project for new customer - finalise install of latest version on testing server, document steps required for go live, investigate versioning processes more. (4hrs 45mins)
8. Start full scan of my laptop, as there is a network issue (but this may well be a hang over from the last time). (2hrs 55mins)
9. Assist with work for website customer. (30mins)
Wednesday, August 14, 2013
Today's work on/in the business - Tues 13 Aug
1. Update my record of time worked. (5mins)
2. Review progress made this week. (35mins)
3. Read small business blogs. (2hrs 30mins)
4. Supply customer with copy of email after they had an email crash. (5mins)
5. Investigate process for next version of software project for new customer - install latest version on testing server - but something is not working as expected. (1hr 5mins)
6. Invoice reconciliation - 4 printed and sent for confirmation that they are ready to send out. (20mins)
2. Review progress made this week. (35mins)
3. Read small business blogs. (2hrs 30mins)
4. Supply customer with copy of email after they had an email crash. (5mins)
5. Investigate process for next version of software project for new customer - install latest version on testing server - but something is not working as expected. (1hr 5mins)
6. Invoice reconciliation - 4 printed and sent for confirmation that they are ready to send out. (20mins)
Tuesday, August 13, 2013
Today's work on/in the business - Mon 12 Aug
1. Update my record of time worked. (10mins)
2. Finish full anti virus and malware scan of my laptop after issues found on server - clean. (6hrs 5mins)
3. Next changes to website update for new customer - swap old site for new version. (4hrs 10mins)
4. Review progress made this week. (25mins)
5. Invoice reconciliation - 4 finalised, 1 updated, 1 finalised and sent out. (1hr 30mins)
6. Investigate process for next version of software project for new customer - phone call re current state and next steps moving forward. (10mins)
2. Finish full anti virus and malware scan of my laptop after issues found on server - clean. (6hrs 5mins)
3. Next changes to website update for new customer - swap old site for new version. (4hrs 10mins)
4. Review progress made this week. (25mins)
5. Invoice reconciliation - 4 finalised, 1 updated, 1 finalised and sent out. (1hr 30mins)
6. Investigate process for next version of software project for new customer - phone call re current state and next steps moving forward. (10mins)
Monday, August 12, 2013
Today's work on/in the business - Sun 11 Aug
1. Update my record of time worked. (10mins)
2. Review progress made this week and ensure the schedule is right for next week. (55mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Accounting. (35mins)
5. Invoice reconciliation - 7 updated, 1 started. (1hr)
6. Started full anti virus and malware scan of my laptop after issues found on server. (6hrs 10mins)
2. Review progress made this week and ensure the schedule is right for next week. (55mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Accounting. (35mins)
5. Invoice reconciliation - 7 updated, 1 started. (1hr)
6. Started full anti virus and malware scan of my laptop after issues found on server. (6hrs 10mins)
Sunday, August 11, 2013
Today's work on/in the business - Fri 9 Aug
1. Update my record of time worked. (5mins)
2. Review progress made this week. (45mins)
3. Investigate process for next version of software project for new customer - investigate one of the next steps. (1hr)
4. Next changes to website update for new customer - preparation for meeting and meeting, then changes as requested. (3hrs 55mins)
5. Read small business blogs. (2hrs 25mins)
2. Review progress made this week. (45mins)
3. Investigate process for next version of software project for new customer - investigate one of the next steps. (1hr)
4. Next changes to website update for new customer - preparation for meeting and meeting, then changes as requested. (3hrs 55mins)
5. Read small business blogs. (2hrs 25mins)
Friday, August 9, 2013
Today's work on/in the business - Thurs 8 Aug
1. Update my record of time worked. (10mins)
2. Review progress made this week. (40mins)
3. Assist with work for support customer. (25mins)
4. Working on process for new Events setup - review events. (10mins)
5. Investigate process for next version of software project for new customer - continue looking at passing information to software and fix typo in graphics. (3hrs 55mins)
6. Accounting. (40mins)
7. Continue testing new files created (recreated) for support customer - still an issue. (40mins)
8. Regular anti virus scan on Windows server. (30mins)
2. Review progress made this week. (40mins)
3. Assist with work for support customer. (25mins)
4. Working on process for new Events setup - review events. (10mins)
5. Investigate process for next version of software project for new customer - continue looking at passing information to software and fix typo in graphics. (3hrs 55mins)
6. Accounting. (40mins)
7. Continue testing new files created (recreated) for support customer - still an issue. (40mins)
8. Regular anti virus scan on Windows server. (30mins)
Thursday, August 8, 2013
Today's work on/in the business - Wed 7 Aug
1. Update my record of time worked. (5mins)
2. Review progress made this week. (40mins)
3. Investigate process for next version of software project for new customer - finish set up for colleague to assist and meet with her, continue looking at passing information to software. (6hrs 45mins)
4. Assist with work for support customer. (25mins)
2. Review progress made this week. (40mins)
3. Investigate process for next version of software project for new customer - finish set up for colleague to assist and meet with her, continue looking at passing information to software. (6hrs 45mins)
4. Assist with work for support customer. (25mins)
Wednesday, August 7, 2013
Today's work on/in the business - Tues 6 Aug
1. Update my record of time worked. (10mins)
2. Review progress made this week. (35mins)
3. Read small business blogs. (45mins)
4. Investigate process for next version of software project for new customer - set up for colleague to assist, start actual documentation, make design changes that I have wanted to do for a while, advise on hosting options, look at passing information to software. (4hrs 45mins)
5. Continue testing new files created (recreated) for support customer - still an issue. (35mins)
2. Review progress made this week. (35mins)
3. Read small business blogs. (45mins)
4. Investigate process for next version of software project for new customer - set up for colleague to assist, start actual documentation, make design changes that I have wanted to do for a while, advise on hosting options, look at passing information to software. (4hrs 45mins)
5. Continue testing new files created (recreated) for support customer - still an issue. (35mins)
Tuesday, August 6, 2013
Today's work on/in the business - Mon 5 Aug
1. Update my record of time worked. (5mins)
2. Send information to get refund of broadband top up amount that was debited without the top up actually being processed. (15mins)
3. Review progress made this week. (20mins)
4. Finish scan of my laptop - clean again. (8hrs 25mins)
5. Working on process for new Events setup - review events. (5mins)
6. Next changes to website update for new customer - finalise this version. (2hrs 35mins)
2. Send information to get refund of broadband top up amount that was debited without the top up actually being processed. (15mins)
3. Review progress made this week. (20mins)
4. Finish scan of my laptop - clean again. (8hrs 25mins)
5. Working on process for new Events setup - review events. (5mins)
6. Next changes to website update for new customer - finalise this version. (2hrs 35mins)
Monday, August 5, 2013
Today's work on/in the business - Sun 4 Aug
1. Update my record of time worked. (5mins)
2. Review progress made this week. (25mins)
3. Started full anti virus and malware scan of my laptop after installing new software. (5hrs)
2. Review progress made this week. (25mins)
3. Started full anti virus and malware scan of my laptop after installing new software. (5hrs)
Sunday, August 4, 2013
Today's work on/in the business - Sat 3 Aug
1. Update my record of time worked. (15mins)
2. Review progress made this week and ensure the schedule is right for next week. (30mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Free space on my laptop. (3hrs)
2. Review progress made this week and ensure the schedule is right for next week. (30mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Free space on my laptop. (3hrs)
Saturday, August 3, 2013
Today's work on/in the business - Fri 2 Aug
1. Update my record of time worked. (10mins)
2. Review progress made this week. (40mins)
3. Free space on my laptop. (1hr 25mins)
4. Accounting. (15mins)
5. Invoice reconciliation - 4 updated, 3 started, 7 printed and sent out. (7hrs 20mins)
6. Working on process for new Events setup - review events. (10mins)
7. Investigate process for next version of software project for new customer - phone call re next steps forward. (20mins)
2. Review progress made this week. (40mins)
3. Free space on my laptop. (1hr 25mins)
4. Accounting. (15mins)
5. Invoice reconciliation - 4 updated, 3 started, 7 printed and sent out. (7hrs 20mins)
6. Working on process for new Events setup - review events. (10mins)
7. Investigate process for next version of software project for new customer - phone call re next steps forward. (20mins)
Friday, August 2, 2013
Today's work on/in the business - Thurs 1 Aug
1. Top up mobile broadband - not successful, some issue with their online system. (15mins)
2. Update my record of time worked. (20mins)
3. Assist with work for support customer. (1hr 25mins)
4. Review progress made this week. (1hr 40mins)
5. Determine whether we met the KPIs (Key Performance Indicators) for July 2013. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise (although I have been riding more and I'm now doing weights regularly) and we need to work on contacting new prospects too (still). Of course, the online networking KPI was not met, although it was better this month. (10mins)
6. Investigate process for next version of software project for new customer - finalise install of current version on second server. (20mins)
7. Continue testing new files created (recreated) for support customer. (2hrs 50mins)
8. Working on process for new Events setup - review events. (10mins)
2. Update my record of time worked. (20mins)
3. Assist with work for support customer. (1hr 25mins)
4. Review progress made this week. (1hr 40mins)
5. Determine whether we met the KPIs (Key Performance Indicators) for July 2013. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise (although I have been riding more and I'm now doing weights regularly) and we need to work on contacting new prospects too (still). Of course, the online networking KPI was not met, although it was better this month. (10mins)
6. Investigate process for next version of software project for new customer - finalise install of current version on second server. (20mins)
7. Continue testing new files created (recreated) for support customer. (2hrs 50mins)
8. Working on process for new Events setup - review events. (10mins)
Thursday, August 1, 2013
Today's work on/in the business - Wed 31 Jul
1. Update my record of time worked. (15mins)
2. Review progress made this week. (40mins)
3. Assist with work for support customer. (20mins)
4. Working on process for new Events setup - review events. (5mins)
5. Free space on server for support customer and test new files created (recreated). (1hr 25mins)
6. Investigate process for next version of software project for new customer - upgrade and install on second server. (5hrs 40mins)
2. Review progress made this week. (40mins)
3. Assist with work for support customer. (20mins)
4. Working on process for new Events setup - review events. (5mins)
5. Free space on server for support customer and test new files created (recreated). (1hr 25mins)
6. Investigate process for next version of software project for new customer - upgrade and install on second server. (5hrs 40mins)
Wednesday, July 31, 2013
Today's work on/in the business - Tues 30 Jul
1. Full scans on my laptop after installing etc - verified clean. (1hr 50mins)
2. Update my record of time worked. (5mins)
3. Investigate process for next version of software project for new customer - confirm version required. (15mins)
4. Accounting. (1hr 15mins)
5. Working on process for new Events setup - review events and enter regular events. (1hr 55mins)
6. Review progress made this week. (35mins)
7. Free space on server for support customer. (1hr)
8. Invoice reconciliation - 11 updated, 2 finalised, 10 started. (2hrs 15mins)
2. Update my record of time worked. (5mins)
3. Investigate process for next version of software project for new customer - confirm version required. (15mins)
4. Accounting. (1hr 15mins)
5. Working on process for new Events setup - review events and enter regular events. (1hr 55mins)
6. Review progress made this week. (35mins)
7. Free space on server for support customer. (1hr)
8. Invoice reconciliation - 11 updated, 2 finalised, 10 started. (2hrs 15mins)
Tuesday, July 30, 2013
Today's work on/in the business - Mon 29 Jul
1. Update my record of time worked. (5mins)
2. Accounting - (maybe) needed to uninstall and reinstall, then call to register, then updated to end of last financial year. (1hr 55mins)
3. Invoice reconciliation - moved invoices that did not get completed last financial year. (15mins)
4. BAS. (20mins)
5. Trip to post BAS form. (30mins)
6. Full scans on my laptop after installing etc. (3hrs 45mins)
2. Accounting - (maybe) needed to uninstall and reinstall, then call to register, then updated to end of last financial year. (1hr 55mins)
3. Invoice reconciliation - moved invoices that did not get completed last financial year. (15mins)
4. BAS. (20mins)
5. Trip to post BAS form. (30mins)
6. Full scans on my laptop after installing etc. (3hrs 45mins)
Monday, July 29, 2013
Today's work on/in the business - Sun 28 Jul
1. Update my record of time worked. (10mins)
2. Review progress made this week and ensure the schedule is right for next week. (55mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Accounting - it crashed again. (15mins)
5. Investigate process for next version of software project for new customer - investigate version required. (20mins)
2. Review progress made this week and ensure the schedule is right for next week. (55mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Accounting - it crashed again. (15mins)
5. Investigate process for next version of software project for new customer - investigate version required. (20mins)
Sunday, July 28, 2013
Today's work on/in the business - Fri 26 Jul
1. Update my record of time worked. (10mins)
2. Review progress made this week. (45mins)
3. Investigate process for next version of software project for new customer - continue install on second server - issues, probably due to versions. (40mins)
4. Accounting - sort out issues with new install - then it crashed... (50mins)
Travelling for a girls' weekend away with music and relaxation!
2. Review progress made this week. (45mins)
3. Investigate process for next version of software project for new customer - continue install on second server - issues, probably due to versions. (40mins)
4. Accounting - sort out issues with new install - then it crashed... (50mins)
Travelling for a girls' weekend away with music and relaxation!
Friday, July 26, 2013
Today's work on/in the business - Thurs 25 Jul
1. Update my record of time worked. (20mins)
2. Full anti virus and malware scan of my laptop after installing new software - clean. (6hrs 35mins)
3. Read small business blogs. (35mins)
4. Investigate process for next version of software project for new customer - investigation of issues as discussed and start install on second server. (1hr 10mins)
5. Working on process for new Events setup - review events. (15mins)
6. Next changes to website update for new customer - setup new forms. (1hr 45mins)
7. Review progress made this week. (45mins)
2. Full anti virus and malware scan of my laptop after installing new software - clean. (6hrs 35mins)
3. Read small business blogs. (35mins)
4. Investigate process for next version of software project for new customer - investigation of issues as discussed and start install on second server. (1hr 10mins)
5. Working on process for new Events setup - review events. (15mins)
6. Next changes to website update for new customer - setup new forms. (1hr 45mins)
7. Review progress made this week. (45mins)
Thursday, July 25, 2013
Today's work on/in the business - Wed 24 Jul
1. Update my record of time worked. (5mins)
2. Investigate process for next version of software project for new customer - investigation of issues as discussed and email correspondence. (7hrs 15mins)
3. Review progress made this week. (40mins)
4. Backup accounts and install new version of software. (50mins)
5. Full anti virus scan of my laptop after installing new software. (3hrs 20mins)
2. Investigate process for next version of software project for new customer - investigation of issues as discussed and email correspondence. (7hrs 15mins)
3. Review progress made this week. (40mins)
4. Backup accounts and install new version of software. (50mins)
5. Full anti virus scan of my laptop after installing new software. (3hrs 20mins)
Wednesday, July 24, 2013
Today's work on/in the business - Tues 23 Jul
1. Update my record of time worked. (10mins)
2. Review progress made this week. (50mins)
3. Investigate process for next version of software project for new customer - investigation of issues as discussed and email correspondence. (7hrs 45mins)
4. Work for support customer - phone call re current status. (5mins)
2. Review progress made this week. (50mins)
3. Investigate process for next version of software project for new customer - investigation of issues as discussed and email correspondence. (7hrs 45mins)
4. Work for support customer - phone call re current status. (5mins)
Tuesday, July 23, 2013
Today's work on/in the business - Mon 22 Jul
1. Update my record of time worked. (10mins)
2. Review progress made this week. (50mins)
3. Next changes to website update for new customer - investigate best extension for forms. (1hr 30mins)
4. Investigate whether I can find details of one of the repair people we have used, without success. (50mins)
5. Investigate process for next version of software project for new customer - phone call discussion on current situation, then investigation of issues as discussed. (6hrs 30mins)
2. Review progress made this week. (50mins)
3. Next changes to website update for new customer - investigate best extension for forms. (1hr 30mins)
4. Investigate whether I can find details of one of the repair people we have used, without success. (50mins)
5. Investigate process for next version of software project for new customer - phone call discussion on current situation, then investigation of issues as discussed. (6hrs 30mins)
Sunday, July 21, 2013
Today's work on/in the business - Sat 20 Jul
1. Update my record of time worked. (10mins)
2. Review progress made this week and ensure the schedule is right for next week. (1hr 10mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (10mins)
4. Virus scanning the Windows server. (5hrs 5mins)
5. Correspondence re potential contract work. (1hr 30mins)
6. Free space on my laptop. (50mins)
2. Review progress made this week and ensure the schedule is right for next week. (1hr 10mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (10mins)
4. Virus scanning the Windows server. (5hrs 5mins)
5. Correspondence re potential contract work. (1hr 30mins)
6. Free space on my laptop. (50mins)
Saturday, July 20, 2013
Today's work on/in the business - Fri 19 Jul
1. Update my record of time worked. (5mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - continuing email correspondence on current situation. (10mins)
4. Next changes to website update for new customer, including updating image for header. (2hrs 55mins)
5. Read small business blogs. (1hr 20mins)
2. Review progress made this week. (15mins)
3. Investigate process for next version of software project for new customer - continuing email correspondence on current situation. (10mins)
4. Next changes to website update for new customer, including updating image for header. (2hrs 55mins)
5. Read small business blogs. (1hr 20mins)
Friday, July 19, 2013
Today's work on/in the business - Thurs 18 Jul
1. Update my record of time worked. (5mins)
2. Review progress made this week. (25mins)
3. Investigate process for next version of software project for new customer - continuing email correspondence on current situation, discovery of competitor details and further testing on current process. (5hrs 5mins)
4. Full scan on USB stick to check nothing nasty went to customer laptop (or came from it). (15mins)
It's been difficult to concentrate on work today when I'm so angry...
2. Review progress made this week. (25mins)
3. Investigate process for next version of software project for new customer - continuing email correspondence on current situation, discovery of competitor details and further testing on current process. (5hrs 5mins)
4. Full scan on USB stick to check nothing nasty went to customer laptop (or came from it). (15mins)
It's been difficult to concentrate on work today when I'm so angry...
Thursday, July 18, 2013
Today's work on/in the business - Wed 17 Jul
1. Update my record of time worked. (10mins)
2. Review progress made this week. (35mins)
3. Work for support customer - continuing to rebuild missing files - versions of all ready for testing. (3hrs 35mins)
4. Meeting with new customer re changes to website update. (2hrs)
2. Review progress made this week. (35mins)
3. Work for support customer - continuing to rebuild missing files - versions of all ready for testing. (3hrs 35mins)
4. Meeting with new customer re changes to website update. (2hrs)
Wednesday, July 17, 2013
Today's work on/in the business - Tues 16 Jul
1. Investigate requirements to re-setup the Windows server. (1hr 25mins)
2. Update my record of time worked. (10mins)
3. Working on process for new Events setup - review events. (15mins)
4. Investigate process for next version of software project for new customer - looking at alternative install methods and preparing email on current situation. (3hrs 15mins)
5. Top up mobile broadband. (5mins)
6. Review progress made this week. (55mins)
7. Read small business blogs. (1hr)
2. Update my record of time worked. (10mins)
3. Working on process for new Events setup - review events. (15mins)
4. Investigate process for next version of software project for new customer - looking at alternative install methods and preparing email on current situation. (3hrs 15mins)
5. Top up mobile broadband. (5mins)
6. Review progress made this week. (55mins)
7. Read small business blogs. (1hr)
Tuesday, July 16, 2013
Today's work on/in the business - Mon 15 Jul
1. Antivirus scans on my laptop - confirmed clean. (2hrs 40mins)
2. Accounting - purchase updated software. (15mins)
3. Update my record of time worked. (10mins)
4. Work for support customer - continuing to rebuild missing files. (1hr 15mins)
5. Review progress made this week. (1hr)
6. Investigate process for next version of software project for new customer - looking at alternative install methods. (4hrs 20mins)
2. Accounting - purchase updated software. (15mins)
3. Update my record of time worked. (10mins)
4. Work for support customer - continuing to rebuild missing files. (1hr 15mins)
5. Review progress made this week. (1hr)
6. Investigate process for next version of software project for new customer - looking at alternative install methods. (4hrs 20mins)
Monday, July 15, 2013
Today's work on/in the business - Sun 14 Jul
1. Virus and malware scanning the Windows server. (6hrs 15mins)
2. Update my record of time worked. (5mins)
3. Review progress made this week and ensure the schedule is right for next week. (30mins)
4. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (15mins)
5. Accounting. (1hr 20mins)
6. Antivirus scans on my laptop after I managed to get it to update, which had not happened for a number of days. (4hrs 15mins)
2. Update my record of time worked. (5mins)
3. Review progress made this week and ensure the schedule is right for next week. (30mins)
4. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (15mins)
5. Accounting. (1hr 20mins)
6. Antivirus scans on my laptop after I managed to get it to update, which had not happened for a number of days. (4hrs 15mins)
Sunday, July 14, 2013
Today's work on/in the business - Sat 13 Jul
1. Virus and malware scanning the Windows server. (25mins)
2. Accounting - install new software and start catching up - including filing receipts, etc. (6hrs 10mins)
3. Update my record of time worked. (10mins)
4. Review progress made this week. (30mins)
5. Antivirus scans on my laptop - seemed to be a lot of downloads still happening. (25mins)
2. Accounting - install new software and start catching up - including filing receipts, etc. (6hrs 10mins)
3. Update my record of time worked. (10mins)
4. Review progress made this week. (30mins)
5. Antivirus scans on my laptop - seemed to be a lot of downloads still happening. (25mins)
Saturday, July 13, 2013
Today's work on/in the business - Fri 12 Jul
1. Update my record of time worked. (5mins)
2. Review progress made this week. (25mins)
3. Install updates to my laptop. (55mins)
4. Work for support customer - confirmed suggested backup process will work. (3hrs 55mins)
5. Antivirus scans on my laptop after software updated. (6hrs 55mins)
6. Working on process for new Events setup - review events. (5mins)
7. Watch webinar re small business. (1hr)
2. Review progress made this week. (25mins)
3. Install updates to my laptop. (55mins)
4. Work for support customer - confirmed suggested backup process will work. (3hrs 55mins)
5. Antivirus scans on my laptop after software updated. (6hrs 55mins)
6. Working on process for new Events setup - review events. (5mins)
7. Watch webinar re small business. (1hr)
Friday, July 12, 2013
Today's work on/in the business - Thurs 11 Jul
1. Update my record of time worked. (10mins)
2. Review progress made this week. (20mins)
3. Top up my mobile phone. (5mins)
4. Work for support customer - test whether suggested backup process will work. (6hrs 20mins)
2. Review progress made this week. (20mins)
3. Top up my mobile phone. (5mins)
4. Work for support customer - test whether suggested backup process will work. (6hrs 20mins)
Thursday, July 11, 2013
Today's work on/in the business - Wed 10 Jul
1. Update my record of time worked. (5mins)
2. Working on process for new Events setup - review events. (10mins)
3. Anti virus and anti malware my laptop - server hit again. Laptop came up clean. (10hrs 50mins)
4. Assist with support for new website customer. (1hr)
5. Review progress made this week. (15mins)
2. Working on process for new Events setup - review events. (10mins)
3. Anti virus and anti malware my laptop - server hit again. Laptop came up clean. (10hrs 50mins)
4. Assist with support for new website customer. (1hr)
5. Review progress made this week. (15mins)
Wednesday, July 10, 2013
Today's work on/in the business - Tues 9 Jul
1. Update my record of time worked. (5mins)
2. Review progress made this week. (40mins)
3. Investigate process for next version of software project for new customer - can we not actually install the software? (1hr 15mins)
4. Work for support customer - test whether suggested backup process will work. (4hrs 50mins)
2. Review progress made this week. (40mins)
3. Investigate process for next version of software project for new customer - can we not actually install the software? (1hr 15mins)
4. Work for support customer - test whether suggested backup process will work. (4hrs 50mins)
Tuesday, July 9, 2013
Today's work on/in the business - Mon 8 Jul
1. Update my record of time worked. (5mins)
2. Review progress made this week. (25mins)
3. Investigate process for next version of software project for new customer - can we not actually install the software? (2hrs 45mins)
4. Work for support customer - downloaded latest code. (1hr 45mins)
5. Read small business blogs. (10mins)
More time finalising the tax information and other stuff.
2. Review progress made this week. (25mins)
3. Investigate process for next version of software project for new customer - can we not actually install the software? (2hrs 45mins)
4. Work for support customer - downloaded latest code. (1hr 45mins)
5. Read small business blogs. (10mins)
More time finalising the tax information and other stuff.
Monday, July 8, 2013
Today's work on/in the business - Sun 7 Jul
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Work for support customer - first data export - zipped files and sent. (30mins)
5. Investigate contract work available - add information to my resume. (1hr 40mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Work for support customer - first data export - zipped files and sent. (30mins)
5. Investigate contract work available - add information to my resume. (1hr 40mins)
Sunday, July 7, 2013
Today's work on/in the business - Sat 6 Jul
1. Update my record of time worked. (5mins)
2. Review progress made this week. (25mins)
3. Working on process for new Events setup - review events. (20mins)
2. Review progress made this week. (25mins)
3. Working on process for new Events setup - review events. (20mins)
Saturday, July 6, 2013
Today's work on/in the business - Fri 5 Jul
1. Update my record of time worked. (10mins)
2. Review progress made this week. (55mins)
3. Work for support customer - first data export - once I worked out that I used the wrong information yesterday. (6hrs 50mins)
4. Trip to bank a cheque. (35mins)
2. Review progress made this week. (55mins)
3. Work for support customer - first data export - once I worked out that I used the wrong information yesterday. (6hrs 50mins)
4. Trip to bank a cheque. (35mins)
Friday, July 5, 2013
Today's work on/in the business - Thurs 4 Jul
1. Update my record of time worked. (10mins)
2. Review progress made this week. (30mins)
3. Work for support customer - first data export. (3hrs 10mins)
More time spent on sorting out our tax - not finished yet... More of this to go.
2. Review progress made this week. (30mins)
3. Work for support customer - first data export. (3hrs 10mins)
More time spent on sorting out our tax - not finished yet... More of this to go.
Thursday, July 4, 2013
Today's work on/in the business - Wed 3 Jul
1. Update my record of time worked. (5mins)
2. Review progress made this week. (1hr 20mins)
3. Determine whether we met the KPIs (Key Performance Indicators) for June 2013. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise (although I have been riding more and I'm now doing weights regularly) and we need to work on contacting new prospects too (still). Of course, the online networking KPI was not met, although it was much closer this month. (10mins)
4. Working on process for new Events setup - review events. (5mins)
5. Read small business blogs. (1hr 10mins)
6. Review document for new customer/associate. (15mins)
7. Investigate process for next version of software project for new customer - can we not actually install the software? (15mins)
The rest of the time spent on starting to sort out our tax - so finding bank statements, sorting out paperwork... More of this tomorrow.
2. Review progress made this week. (1hr 20mins)
3. Determine whether we met the KPIs (Key Performance Indicators) for June 2013. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise (although I have been riding more and I'm now doing weights regularly) and we need to work on contacting new prospects too (still). Of course, the online networking KPI was not met, although it was much closer this month. (10mins)
4. Working on process for new Events setup - review events. (5mins)
5. Read small business blogs. (1hr 10mins)
6. Review document for new customer/associate. (15mins)
7. Investigate process for next version of software project for new customer - can we not actually install the software? (15mins)
The rest of the time spent on starting to sort out our tax - so finding bank statements, sorting out paperwork... More of this tomorrow.
Wednesday, July 3, 2013
Today's work on/in the business - Tues 2 Jul
1. Virus and malware scanning the Windows server - finished and clean. (4hrs 10mins)
2. Update my record of time worked. (10mins)
3. Review progress made this week. (45mins)
4. Investigate process for next version of software project for new customer - can we not actually install the software? (4hrs 30mins)
5. Assist with support for new website customer. (40mins)
2. Update my record of time worked. (10mins)
3. Review progress made this week. (45mins)
4. Investigate process for next version of software project for new customer - can we not actually install the software? (4hrs 30mins)
5. Assist with support for new website customer. (40mins)
Tuesday, July 2, 2013
Today's work on/in the business - Mon 1 Jul
1. Update my record of time worked. (15mins)
2. Review progress made this week. (25mins)
3. Virus and malware scanning the Windows server. (1hr 45mins)
4. Investigate process for next version of software project for new customer - can we not actually install the software? (8hrs 15mins)
5. Assist with support for new website customer. (15mins)
6. Working on process for new Events setup - review events. (25mins)
2. Review progress made this week. (25mins)
3. Virus and malware scanning the Windows server. (1hr 45mins)
4. Investigate process for next version of software project for new customer - can we not actually install the software? (8hrs 15mins)
5. Assist with support for new website customer. (15mins)
6. Working on process for new Events setup - review events. (25mins)
Monday, July 1, 2013
Today's work on/in the business - Sun 30 Jun
1. Virus and malware scanning the Windows server. (10hrs 30mins)
2. Update my record of time worked. (5mins)
3. Review progress made this week and ensure the schedule is right for next week. (30mins)
4. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
5. Investigate process for next version of software project for new customer - can we not actually install the software? (2hrs 20mins)
6. Working on process for new Events setup - review events. (5mins)
2. Update my record of time worked. (5mins)
3. Review progress made this week and ensure the schedule is right for next week. (30mins)
4. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
5. Investigate process for next version of software project for new customer - can we not actually install the software? (2hrs 20mins)
6. Working on process for new Events setup - review events. (5mins)
Sunday, June 30, 2013
Today's work on/in the business - Sat 29 Jun
1. Update my record of time worked. (5mins)
2. Review progress made this week. (20mins)
3. Investigate process for next version of software project for new customer - confirm existing process actually works still. (5hrs 20mins)
4. Working on process for new Events setup - review events. (5mins)
5. Virus and malware scanning the Windows server. (2hrs 15mins)
2. Review progress made this week. (20mins)
3. Investigate process for next version of software project for new customer - confirm existing process actually works still. (5hrs 20mins)
4. Working on process for new Events setup - review events. (5mins)
5. Virus and malware scanning the Windows server. (2hrs 15mins)
Saturday, June 29, 2013
Today's work on/in the business - Fri 28 Jun
1. Update my record of time worked. (10mins)
2. Virus and malware scanning the Windows server. (6hrs 50mins)
3. Review progress made this week. (15mins)
4. Working on process for new Events setup - review events. (30mins)
5. Investigate contract work available - 1 application sent. (45mins)
6. Investigate process for next version of software project for new customer - confirm existing process actually works still. (4hrs 15mins)
2. Virus and malware scanning the Windows server. (6hrs 50mins)
3. Review progress made this week. (15mins)
4. Working on process for new Events setup - review events. (30mins)
5. Investigate contract work available - 1 application sent. (45mins)
6. Investigate process for next version of software project for new customer - confirm existing process actually works still. (4hrs 15mins)
Friday, June 28, 2013
Today's work on/in the business - Thurs 27 Jun
1. Update my record of time worked. (5mins)
2. Review progress made this week. (50mins)
3. Working on process for new Events setup - review events. (15mins)
4. Invoice reconciliation - follow up on invoices. (25mins)
5. Virus and malware scanning the Windows server. (7hrs 5mins)
6. Read small business blogs. (2hrs 10mins)
2. Review progress made this week. (50mins)
3. Working on process for new Events setup - review events. (15mins)
4. Invoice reconciliation - follow up on invoices. (25mins)
5. Virus and malware scanning the Windows server. (7hrs 5mins)
6. Read small business blogs. (2hrs 10mins)
Thursday, June 27, 2013
Today's work on/in the business - Wed 26 Jun
1. Update my record of time worked. (15mins)
2. Run scans on my laptop after one of the sites I visited popped up something probably nasty! (8hrs 55mins)
3. Review progress made this week. (30mins)
4. Working on process for new Events setup - working on automation, enter regular events and review events. (3hrs)
2. Run scans on my laptop after one of the sites I visited popped up something probably nasty! (8hrs 55mins)
3. Review progress made this week. (30mins)
4. Working on process for new Events setup - working on automation, enter regular events and review events. (3hrs)
Wednesday, June 26, 2013
Today's work on/in the business - Tues 25 Jun
1. Update my record of time worked. (10mins)
2. Review progress made this week. (30mins)
3. Assist with work for new customer/associate. (1hr 25mins)
4. Working on process for new Events setup - working on automation. (4hrs 10mins)
5. Run scans on my laptop after one of the sites I visited popped up something probably nasty! (3hrs 35mins)
2. Review progress made this week. (30mins)
3. Assist with work for new customer/associate. (1hr 25mins)
4. Working on process for new Events setup - working on automation. (4hrs 10mins)
5. Run scans on my laptop after one of the sites I visited popped up something probably nasty! (3hrs 35mins)
Tuesday, June 25, 2013
Today's work on/in the business - Mon 24 Jun
1. Update my record of time worked. (5mins)
2. Review progress made this week. (20mins)
3. Investigate contract work available - 3 applications sent. (1hr)
4. Working on process for new Events setup - working on automation and review events. (4hrs 10mins)
5. Complete and send quote for support customer. (25mins)
6. Assist with work for new customer/associate. (1hr 15mins)
2. Review progress made this week. (20mins)
3. Investigate contract work available - 3 applications sent. (1hr)
4. Working on process for new Events setup - working on automation and review events. (4hrs 10mins)
5. Complete and send quote for support customer. (25mins)
6. Assist with work for new customer/associate. (1hr 15mins)
Monday, June 24, 2013
Today's work on/in the business - Sun 23 Jun
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (50mins)
3. Investigate processes and start quote for support customer. (2hrs 45mins)
4. Invoice reconciliation - 9 updated, 5 started. (2hrs 10mins)
5. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (10mins)
6. Accounting. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (50mins)
3. Investigate processes and start quote for support customer. (2hrs 45mins)
4. Invoice reconciliation - 9 updated, 5 started. (2hrs 10mins)
5. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (10mins)
6. Accounting. (5mins)
Sunday, June 23, 2013
Today's work on/in the business - Sat 22 Jun
1. Run final scans on my laptop before connecting to client's server. (9hrs 5mins)
2. Update my record of time worked. (5mins)
3. Working on process for new Events setup - working on automation. (1hr 5mins)
4. Read small business blogs. (1hr 45mins)
2. Update my record of time worked. (5mins)
3. Working on process for new Events setup - working on automation. (1hr 5mins)
4. Read small business blogs. (1hr 45mins)
Saturday, June 22, 2013
Today's work on/in the business - Fri 21 Jun
1. Update my record of time worked. (5mins)
2. Review progress made this week. (40mins)
3. Working on process for new Events setup - working on automation and review events. (5hrs 45mins)
4. Run final scans on my laptop before connecting to client's server. (3hrs 15mins)
2. Review progress made this week. (40mins)
3. Working on process for new Events setup - working on automation and review events. (5hrs 45mins)
4. Run final scans on my laptop before connecting to client's server. (3hrs 15mins)
Friday, June 21, 2013
Today's work on/in the business - Thurs 20 Jun
1. Update my record of time worked. (10mins)
2. Review progress made this week. (35mins)
3. Working on process for new Events setup - working on automation. (5hrs)
4. Read small business blogs. (1hr 30mins)
2. Review progress made this week. (35mins)
3. Working on process for new Events setup - working on automation. (5hrs)
4. Read small business blogs. (1hr 30mins)
Thursday, June 20, 2013
Today's work on/in the business - Wed 19 Jun
1. Update my record of time worked. (5mins)
2. Review progress made this week. (1hr)
3. Working on process for new Events setup - working on automation and review events. (3hrs 10mins)
4. Meeting to discuss requirements and progress on next version of software project for new customer. (3hrs 40mins)
5. Assist with work for new customer/associate. (25mins)
2. Review progress made this week. (1hr)
3. Working on process for new Events setup - working on automation and review events. (3hrs 10mins)
4. Meeting to discuss requirements and progress on next version of software project for new customer. (3hrs 40mins)
5. Assist with work for new customer/associate. (25mins)
Wednesday, June 19, 2013
Today's work on/in the business - Tues 18 Jun
1. Anti virus and malware scan of my laptop - repeated, as I accidentally connected to our network before the Windows Server was fully clean... (4hrs 25mins)
2. Update my record of time worked. (10mins)
3. Review progress made this week. (1hr)
4. Investigate process for next version of software project for new customer - confirm existing process actually works still. (30mins)
5. Accounting. (30mins)
2. Update my record of time worked. (10mins)
3. Review progress made this week. (1hr)
4. Investigate process for next version of software project for new customer - confirm existing process actually works still. (30mins)
5. Accounting. (30mins)
Tuesday, June 18, 2013
Today's work on/in the business - Mon 17 Jun
1. Update my record of time worked. (5mins)
2. Anti virus and malware scan of my laptop - has to be repeated, as I accidentally connected to our network before the Windows Server was fully clean... (7hrs 40mins)
3. Finalise first cut of new customer's website update. (50mins)
4. Review progress made last week and ensure the schedule is right for this week. (40mins)
5. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (10mins)
6. Assist with work for new customer/associate. (2hrs 40mins)
7. Read small business blogs. (35mins)
2. Anti virus and malware scan of my laptop - has to be repeated, as I accidentally connected to our network before the Windows Server was fully clean... (7hrs 40mins)
3. Finalise first cut of new customer's website update. (50mins)
4. Review progress made last week and ensure the schedule is right for this week. (40mins)
5. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (10mins)
6. Assist with work for new customer/associate. (2hrs 40mins)
7. Read small business blogs. (35mins)
Monday, June 17, 2013
Today's work on/in the business - Sun 16 Jun
1. Update my record of time worked. (5mins)
2. Assist with work for new customer/associate. (1hr 40mins)
3. Review progress made this week. (20mins)
4. Anti virus and malware scan of my laptop - not really happy that the Apple Mobile Devices Services update had a Windows Trojan in it - very uncool! (4hrs 30mins)
2. Assist with work for new customer/associate. (1hr 40mins)
3. Review progress made this week. (20mins)
4. Anti virus and malware scan of my laptop - not really happy that the Apple Mobile Devices Services update had a Windows Trojan in it - very uncool! (4hrs 30mins)
Sunday, June 16, 2013
Today's work on/in the business - Fri 14 Jun
1. Update my record of time worked. (10mins)
2. Review progress made this week. (40mins)
3. Investigate process for next version of software project for new customer - confirm existing process actually works still. (15mins)
4. Investigate contract work available. (10mins)
5. Read small business blogs. (20mins)
Mostly spent in preparation for tomorrow's coaching course. Then no work on Saturday, as the course took the entire day.
2. Review progress made this week. (40mins)
3. Investigate process for next version of software project for new customer - confirm existing process actually works still. (15mins)
4. Investigate contract work available. (10mins)
5. Read small business blogs. (20mins)
Mostly spent in preparation for tomorrow's coaching course. Then no work on Saturday, as the course took the entire day.
Friday, June 14, 2013
Today's work on/in the business - Thurs 13 Jun
1. Update my record of time worked. (10mins)
2. Review progress made this week. (1hr 25mins)
3. Investigated best process for new customer's website update and started work on it. (4hrs)
4. Working on process for new Events setup - review events. (10mins)
5. Investigate contract work available - 2 applications sent. (45mins)
2. Review progress made this week. (1hr 25mins)
3. Investigated best process for new customer's website update and started work on it. (4hrs)
4. Working on process for new Events setup - review events. (10mins)
5. Investigate contract work available - 2 applications sent. (45mins)
Thursday, June 13, 2013
Today's work on/in the business - Wed 12 Jun
1. Update my record of time worked. (10mins)
2. Review progress made this week. (35mins)
3. Investigated best process for new customer's website update and started work on it. (2hrs 45mins)
4. Investigate process for next version of software project for new customer - cannot actually go back to a web-based version. (1hr 45mins)
5. Read small business blogs. (3hrs 15mins)
2. Review progress made this week. (35mins)
3. Investigated best process for new customer's website update and started work on it. (2hrs 45mins)
4. Investigate process for next version of software project for new customer - cannot actually go back to a web-based version. (1hr 45mins)
5. Read small business blogs. (3hrs 15mins)
Wednesday, June 12, 2013
Today's work on/in the business - Tues 11 Jun
1. Update my record of time worked. (5mins)
2. Review progress made this week. (50mins)
3. Free space on my laptop. (7hrs 45mins)
4. Working on process for new Events setup - review events. (10mins)
5. Investigate process for next version of software project for new customer - can we go back to a web-based version? (30mins)
2. Review progress made this week. (50mins)
3. Free space on my laptop. (7hrs 45mins)
4. Working on process for new Events setup - review events. (10mins)
5. Investigate process for next version of software project for new customer - can we go back to a web-based version? (30mins)
Tuesday, June 11, 2013
Today's work on/in the business - Mon 10 Jun
1. Update my record of time worked. (5mins)
2. Review progress made this week. (50mins)
3. Investigate process for next version of software project for new customer - checking software is useable again. (3hrs 45mins)
4. Start investigating best process for new customer's website update - mostly setup investigations. (15mins)
5. Investigate reported site map issue re website customer. (10mins)
6. Free space on my laptop. (2hrs 40mins)
2. Review progress made this week. (50mins)
3. Investigate process for next version of software project for new customer - checking software is useable again. (3hrs 45mins)
4. Start investigating best process for new customer's website update - mostly setup investigations. (15mins)
5. Investigate reported site map issue re website customer. (10mins)
6. Free space on my laptop. (2hrs 40mins)
Monday, June 10, 2013
Today's work on/in the business - Sun 9 Jun
1. Update my record of time worked. (10mins)
2. Review progress made this week and ensure the schedule is right for next week. (30mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Start investigating best process for new customer's website update - mostly setup investigations. (4hrs 40mins)
2. Review progress made this week and ensure the schedule is right for next week. (30mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Start investigating best process for new customer's website update - mostly setup investigations. (4hrs 40mins)
Sunday, June 9, 2013
Today's work on/in the business - Sat 8 Jun
1. Update my record of time worked. (10mins)
2. Review progress made this week. (35mins)
3. Free space on my laptop. (1hr 20mins)
4. Start investigating best process for new customer's website update. (50mins)
5. Investigate process for next version of software project for new customer - checking software is useable again. (15mins)
6. Antivirus and malware scan. (8hrs 15mins)
2. Review progress made this week. (35mins)
3. Free space on my laptop. (1hr 20mins)
4. Start investigating best process for new customer's website update. (50mins)
5. Investigate process for next version of software project for new customer - checking software is useable again. (15mins)
6. Antivirus and malware scan. (8hrs 15mins)
Saturday, June 8, 2013
Today's work on/in the business - Fri 7 Jun
1. Investigate contract work available - 2 applications sent. (45mins)
2. Update my record of time worked. (10mins)
3. Review progress made this week. (1hr)
4. Investigate process for next version of software project for new customer - mostly actually uninstalling and reinstalling the software which broke on my laptop! (3hrs 30mins)
5. Free space on my laptop. (3hrs)
2. Update my record of time worked. (10mins)
3. Review progress made this week. (1hr)
4. Investigate process for next version of software project for new customer - mostly actually uninstalling and reinstalling the software which broke on my laptop! (3hrs 30mins)
5. Free space on my laptop. (3hrs)
Friday, June 7, 2013
Today's work on/in the business - Thurs 6 Jun
1. Work for website customer - turned out to be browser corruption in his office. (5mins)
2. Update my record of time worked. (10mins)
3. Review progress made this week. (1hr 15mins)
4. Free space on my laptop. (3hrs 15mins)
5. Investigate process for next version of software project for new customer - mostly actually fixing the software which broke when new software was installed on my laptop! (45mins)
6. Working on process for new Events setup - work on software changes. (1hr 25mins)
7. Read small business blogs. (15mins)
8. Investigate contract work available. (40mins)
2. Update my record of time worked. (10mins)
3. Review progress made this week. (1hr 15mins)
4. Free space on my laptop. (3hrs 15mins)
5. Investigate process for next version of software project for new customer - mostly actually fixing the software which broke when new software was installed on my laptop! (45mins)
6. Working on process for new Events setup - work on software changes. (1hr 25mins)
7. Read small business blogs. (15mins)
8. Investigate contract work available. (40mins)
Thursday, June 6, 2013
Today's work on/in the business - Wed 5 Jun
1. Update my record of time worked. (5mins)
2. Review progress made this week. (1hr 5mins)
3. Working on process for new Events setup - work on software changes. (55mins)
4. Investigate process for next version of software project for new customer - mostly actually fixing the software which broke when new software was installed on my laptop! (5hrs 40mins)
5. Meeting with new customer re website update. (1hr 55mins)
2. Review progress made this week. (1hr 5mins)
3. Working on process for new Events setup - work on software changes. (55mins)
4. Investigate process for next version of software project for new customer - mostly actually fixing the software which broke when new software was installed on my laptop! (5hrs 40mins)
5. Meeting with new customer re website update. (1hr 55mins)
Wednesday, June 5, 2013
Today's work on/in the business - Tues 4 Jun
1. Update my record of time worked. (15mins)
2. Review progress made this week. (20mins)
A day mostly devoted to relaxation and catching up with a bit of my past.
2. Review progress made this week. (20mins)
A day mostly devoted to relaxation and catching up with a bit of my past.
Tuesday, June 4, 2013
Today's work on/in the business - Mon 3 Jun
1. Update my record of time worked. (10mins)
2. Assist with work for new customer/associate. (5mins)
3. Working on process for new Events setup - review events. (25mins)
4. Review progress made last week and ensure the schedule is right for this week. (55mins)
5. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
6. Determine whether we met the KPIs (Key Performance Indicators) for May 2013. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise (although I have been riding more and I'm now doing weights regularly) and we need to work on contacting new prospects too (still). Of course, the online networking KPI was not met, although I have started this process again. (20mins)
7. Accounting. (1hr 10mins)
8. Invoice reconciliation - 1 started, 8 updated, 1 finalised and sent out. (1hr 40mins)
9. Organise meeting with potential customer re website update. (10mins)
10. Investigate process for next version of software project for new customer - can we go back to a web-based version? (15mins)
11. Look for contact details for Apple contact. (1hr 10mins)
12. Read small business blogs. (45mins)
13. Free space on my laptop. (30mins)
2. Assist with work for new customer/associate. (5mins)
3. Working on process for new Events setup - review events. (25mins)
4. Review progress made last week and ensure the schedule is right for this week. (55mins)
5. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
6. Determine whether we met the KPIs (Key Performance Indicators) for May 2013. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise (although I have been riding more and I'm now doing weights regularly) and we need to work on contacting new prospects too (still). Of course, the online networking KPI was not met, although I have started this process again. (20mins)
7. Accounting. (1hr 10mins)
8. Invoice reconciliation - 1 started, 8 updated, 1 finalised and sent out. (1hr 40mins)
9. Organise meeting with potential customer re website update. (10mins)
10. Investigate process for next version of software project for new customer - can we go back to a web-based version? (15mins)
11. Look for contact details for Apple contact. (1hr 10mins)
12. Read small business blogs. (45mins)
13. Free space on my laptop. (30mins)
Monday, June 3, 2013
Today's work on/in the business - Sun 2 Jun
1. Investigate process for next version of software project for new customer - can we go back to a web-based version? (2hrs 35mins)
2. Assist with work for new customer/associate. (5mins)
2. Assist with work for new customer/associate. (5mins)
Today's work on/in the business - Sat 1 Jun
1. Update my record of time worked. (15mins)
2. Review progress made this week. (35mins)
3. Working on process for new Events setup - review events. (5mins)
2. Review progress made this week. (35mins)
3. Working on process for new Events setup - review events. (5mins)
Saturday, June 1, 2013
Today's work on/in the business - Fri 31 May
1. Update my record of time worked. (15mins)
2. Review progress made this week. (35mins)
3. Read small business blogs. (15mins)
4. Investigate process for next version of software project for new customer - can we go back to a web-based version? (3hrs 20mins)
5. Working on process for new Events setup - review events. (10mins)
6. Assist with work for new customer/associate. (15mins)
7. Investigate contract work available. (10mins)
2. Review progress made this week. (35mins)
3. Read small business blogs. (15mins)
4. Investigate process for next version of software project for new customer - can we go back to a web-based version? (3hrs 20mins)
5. Working on process for new Events setup - review events. (10mins)
6. Assist with work for new customer/associate. (15mins)
7. Investigate contract work available. (10mins)
Friday, May 31, 2013
Today's work on/in the business - Thurs 30 May
1. Update my record of time worked. (10mins)
2. Review progress made this week. (25mins)
3. Investigate contract work available - 1 application sent. (35mins)
4. Working on process for new Events setup - review events. (20mins)
5. Investigate process for next version of software project for new customer - can we go back to a web-based version? (5hrs 10mins)
2. Review progress made this week. (25mins)
3. Investigate contract work available - 1 application sent. (35mins)
4. Working on process for new Events setup - review events. (20mins)
5. Investigate process for next version of software project for new customer - can we go back to a web-based version? (5hrs 10mins)
Thursday, May 30, 2013
Today's work on/in the business - Wed 29 May
1. Update my record of time worked. (10mins)
2. Review progress made this week. (1hr)
3. Update my resume further, ready for looking at contract work. (10mins)
4. Working on process for new Events setup - review events. (1hr 5mins)
5. Read small business blogs. (30mins)
6. Invoice reconciliation - 2 paid. (10mins)
7. Accounting. (5mins)
8. Investigate contract work available. (2hrs 25mins)
2. Review progress made this week. (1hr)
3. Update my resume further, ready for looking at contract work. (10mins)
4. Working on process for new Events setup - review events. (1hr 5mins)
5. Read small business blogs. (30mins)
6. Invoice reconciliation - 2 paid. (10mins)
7. Accounting. (5mins)
8. Investigate contract work available. (2hrs 25mins)
Wednesday, May 29, 2013
Today's work on/in the business - Tues 28 May
1. Update my record of time worked. (15mins)
2. Working on process for new Events setup - review events and work on software changes. (1hr 15mins)
3. Review progress made this week. (40mins)
4. Phone call with software project customer, then initial investigation of potential competitor. (1hr 15mins)
2. Working on process for new Events setup - review events and work on software changes. (1hr 15mins)
3. Review progress made this week. (40mins)
4. Phone call with software project customer, then initial investigation of potential competitor. (1hr 15mins)
Tuesday, May 28, 2013
Today's work on/in the business - Mon 27 May
1. Update my record of time worked. (5mins)
2. Review progress made this week. (35mins)
3. Top up my mobile broadband. (5mins)
4. Update my resume, ready for looking at contract work. (55mins)
5. Working on process for new Events setup - send request for regular events to be set up. (5mins)
6. Read small business blogs. (55mins)
7. Work for Perfect Notes Virtual Assistant customer. (1hr 55mins)
8. Send resume to business that previously found me contract work. (5mins)
9. Investigate contract work available. (40mins)
2. Review progress made this week. (35mins)
3. Top up my mobile broadband. (5mins)
4. Update my resume, ready for looking at contract work. (55mins)
5. Working on process for new Events setup - send request for regular events to be set up. (5mins)
6. Read small business blogs. (55mins)
7. Work for Perfect Notes Virtual Assistant customer. (1hr 55mins)
8. Send resume to business that previously found me contract work. (5mins)
9. Investigate contract work available. (40mins)
Monday, May 27, 2013
Today's work on/in the business - Sun 26 May
1. Update my record of time worked. (10mins)
2. Review progress made this week. (20mins)
3. Work for support customer - quote on data export. (1hr 30mins)
2. Review progress made this week. (20mins)
3. Work for support customer - quote on data export. (1hr 30mins)
Sunday, May 26, 2013
Today's work on/in the business - Sat 25 May
1. Run anti-virus scan on my laptop, prior to connecting to client's server. (5hrs 35mins)
2. Update my record of time worked. (10mins)
3. Working on process for new Events setup - look into access. (5mins)
4. Review progress made this week and ensure the schedule is right for next week. (1hr)
5. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
6. Invoice reconciliation - 2 started, 1 updated. (35mins)
7. Assist with work for new customer/associate. (30mins)
2. Update my record of time worked. (10mins)
3. Working on process for new Events setup - look into access. (5mins)
4. Review progress made this week and ensure the schedule is right for next week. (1hr)
5. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
6. Invoice reconciliation - 2 started, 1 updated. (35mins)
7. Assist with work for new customer/associate. (30mins)
Saturday, May 25, 2013
Today's work on/in the business - Fri 24 May
1. Update my record of time worked. (15mins)
2. Review progress made this week. (40mins)
3. Run anti-virus scan on my laptop, prior to connecting to client's server. (7hrs 5mins)
4. Investigate contract work available. (2hrs)
5. Meeting with Perfect Notes Virtual Assistant customer. (55mins)
6. Accounting. (15mins)
2. Review progress made this week. (40mins)
3. Run anti-virus scan on my laptop, prior to connecting to client's server. (7hrs 5mins)
4. Investigate contract work available. (2hrs)
5. Meeting with Perfect Notes Virtual Assistant customer. (55mins)
6. Accounting. (15mins)
Friday, May 24, 2013
Today's work on/in the business - Thurs 23 May
1. Update my record of time worked. (5mins)
2. Review progress made this week. (50mins)
3. Investigate process for next version of software project for new customer. (1hr 50mins)
4. Invoice reconciliation - 1 paid. (20mins)
5. Read small business blogs. (1hr 25mins)
6. Investigate contract work available. (1hr)
2. Review progress made this week. (50mins)
3. Investigate process for next version of software project for new customer. (1hr 50mins)
4. Invoice reconciliation - 1 paid. (20mins)
5. Read small business blogs. (1hr 25mins)
6. Investigate contract work available. (1hr)
Thursday, May 23, 2013
Today's work on/in the business - Wed 22 May
1. Update my record of time worked. (10mins)
2. Review progress made this week. (55mins)
3. Investigate process for next version of software project for new customer. (7hrs 30mins)
2. Review progress made this week. (55mins)
3. Investigate process for next version of software project for new customer. (7hrs 30mins)
Wednesday, May 22, 2013
Today's work on/in the business - Tues 21 May
1. Update my record of time worked. (10mins)
2. Investigate process for next version of software project for new customer. (2hrs 25mins)
3. Review progress made this week. (45mins)
A day spent trying to get our cat to the vet when the car's battery was completely flat - impacts on the time available for work!
2. Investigate process for next version of software project for new customer. (2hrs 25mins)
3. Review progress made this week. (45mins)
A day spent trying to get our cat to the vet when the car's battery was completely flat - impacts on the time available for work!
Tuesday, May 21, 2013
Today's work on/in the business - Mon 20 May
1. Run scheduled anti virus scan on my laptop. (2hrs 45mins)
2. Update my record of time worked. (5mins)
3. Investigate process for next version of software project for new customer. (7hrs 20mins)
2. Update my record of time worked. (5mins)
3. Investigate process for next version of software project for new customer. (7hrs 20mins)
Monday, May 20, 2013
Today's work on/in the business - Sun 19 May
1. Update my record of time worked. (10mins)
2. Review progress made this week and ensure the schedule is right for next week. (50mins)
3. Invoice reconciliation - 2 started, 3 updated. (50mins)
4. Run scheduled anti virus scan on my laptop. (3hrs 35mins)
2. Review progress made this week and ensure the schedule is right for next week. (50mins)
3. Invoice reconciliation - 2 started, 3 updated. (50mins)
4. Run scheduled anti virus scan on my laptop. (3hrs 35mins)
Sunday, May 19, 2013
Today's work on/in the business - Sat 18 May
1. Update my record of time worked. (10mins)
2. Review progress made this week. (15mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (10mins)
4. Accounting. (30mins)
5. Investigate contract work available. (45mins)
2. Review progress made this week. (15mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (10mins)
4. Accounting. (30mins)
5. Investigate contract work available. (45mins)
Saturday, May 18, 2013
Today's work on/in the business - Fri 17 May
1. Update my record of time worked. (10mins)
2. Review progress made this week. (35mins)
3. Sort files and free space on my laptop. (10mins)
4. Next changes to software project for new customer - further work after testing. (2hrs 20mins)
5. Read small business blogs. (20mins)
6. Investigate contract work available. (2hrs 15mins)
2. Review progress made this week. (35mins)
3. Sort files and free space on my laptop. (10mins)
4. Next changes to software project for new customer - further work after testing. (2hrs 20mins)
5. Read small business blogs. (20mins)
6. Investigate contract work available. (2hrs 15mins)
Friday, May 17, 2013
Today's work on/in the business - Thurs 16 May
1. Free space on my laptop. (35mins)
2. Finalise process for emails as requested for support customer and create required documents. (9hrs 50mins)
3. Update my record of time worked. (10mins)
4. Review progress made this week. (40mins)
2. Finalise process for emails as requested for support customer and create required documents. (9hrs 50mins)
3. Update my record of time worked. (10mins)
4. Review progress made this week. (40mins)
Thursday, May 16, 2013
Today's work on/in the business - Wed 15 May
1. Update my record of time worked. (5mins)
2. Review progress made this week. (50mins)
3. Next changes to software project for new customer - further work after testing. (4hrs 30mins)
4. Read small business blogs. (5mins)
5. More investigation of process for emails as requested for support customer. (1hr 45mins)
6. Free space on my laptop. (55mins)
2. Review progress made this week. (50mins)
3. Next changes to software project for new customer - further work after testing. (4hrs 30mins)
4. Read small business blogs. (5mins)
5. More investigation of process for emails as requested for support customer. (1hr 45mins)
6. Free space on my laptop. (55mins)
Wednesday, May 15, 2013
Today's work on/in the business - Tues 14 May
1. Update my record of time worked. (10mins)
2. Review progress made this week. (40mins)
3. Next changes to software project for new customer - further work after testing. (1hr 35mins)
I took a wonderful break outside with friends for the morning - then had music in the evening - a well-earned rest day.
2. Review progress made this week. (40mins)
3. Next changes to software project for new customer - further work after testing. (1hr 35mins)
I took a wonderful break outside with friends for the morning - then had music in the evening - a well-earned rest day.
Tuesday, May 14, 2013
Today's work on/in the business - Mon 13 May
1. Update my record of time worked. (5mins)
2. Review progress made last week and ensure the schedule is right for this week. (40mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Assist with support for new website customer. (20mins)
5. Invoice reconciliation - 3 updated. (45mins)
6. Next changes to software project for new customer - functionally working after testing and design updated. (3hrs 45mins)
7. Collect emails as requested for support customer and put them in an accessible place. (2hrs 35mins)
8. Read small business blogs. (1hr)
2. Review progress made last week and ensure the schedule is right for this week. (40mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
4. Assist with support for new website customer. (20mins)
5. Invoice reconciliation - 3 updated. (45mins)
6. Next changes to software project for new customer - functionally working after testing and design updated. (3hrs 45mins)
7. Collect emails as requested for support customer and put them in an accessible place. (2hrs 35mins)
8. Read small business blogs. (1hr)
Monday, May 13, 2013
Today's work on/in the business - Sun 12 May
1. Update my record of time worked. (5mins)
2. Accounting. (15mins)
3. Invoice reconciliation - 1 paid. (10mins)
2. Accounting. (15mins)
3. Invoice reconciliation - 1 paid. (10mins)
Sunday, May 12, 2013
Today's work on/in the business - Sat 11 May
1. Update my record of time worked. (5mins)
2. Review progress made this week. (1hr 25mins)
3. Next changes to software project for new customer - further work after testing. (5hrs 40mins)
2. Review progress made this week. (1hr 25mins)
3. Next changes to software project for new customer - further work after testing. (5hrs 40mins)
Saturday, May 11, 2013
Today's work on/in the business - Fri 10 May
1. Update my record of time worked. (10mins)
2. Review progress made this week. (1hr)
3. Next changes to software project for new customer - further work after testing. (7hrs 15mins)
2. Review progress made this week. (1hr)
3. Next changes to software project for new customer - further work after testing. (7hrs 15mins)
Friday, May 10, 2013
Today's work on/in the business - Thurs 9 May
1. Update my record of time worked. (10mins)
2. Next changes to software project for new customer - further work after testing. (8hrs 10mins)
3. Review progress made this week. (35mins)
4. Invoice reconciliation - 1 paid. (10mins)
5. Organise software on my laptop. (10mins)
2. Next changes to software project for new customer - further work after testing. (8hrs 10mins)
3. Review progress made this week. (35mins)
4. Invoice reconciliation - 1 paid. (10mins)
5. Organise software on my laptop. (10mins)
Thursday, May 9, 2013
Today's work on/in the business - Wed 8 May
1. Update my record of time worked. (10mins)
2. Review progress made this week. (40mins)
3. Next changes to software project for new customer - further work after testing. (7hrs 25mins)
4. Trip to bank to deposit cheque. (30mins)
5. Working on process for new Events setup - review events. (5mins)
2. Review progress made this week. (40mins)
3. Next changes to software project for new customer - further work after testing. (7hrs 25mins)
4. Trip to bank to deposit cheque. (30mins)
5. Working on process for new Events setup - review events. (5mins)
Wednesday, May 8, 2013
Today's work on/in the business - Tues 7 May
1. Update my record of time worked. (5mins)
2. Review progress made this week. (45mins)
3. Next changes to software project for new customer - further work after testing. (5hrs 10mins)
2. Review progress made this week. (45mins)
3. Next changes to software project for new customer - further work after testing. (5hrs 10mins)
Tuesday, May 7, 2013
Today's work on/in the business - Mon 6 May
1. Scan my laptop for malware. (45mins)
2. Update my record of time worked. (10mins)
3. Review progress made this week. (1hr 5mins)
4. Next changes to software project for new customer - further work after testing. (7hrs 5mins)
5. Working on process for new Events setup - review events. (15mins)
2. Update my record of time worked. (10mins)
3. Review progress made this week. (1hr 5mins)
4. Next changes to software project for new customer - further work after testing. (7hrs 5mins)
5. Working on process for new Events setup - review events. (15mins)
Monday, May 6, 2013
Today's work on/in the business - Sun 5 May
1. Update my record of time worked. (10mins)
2. Scan my laptop for malware - finish one scan, start scan with second product. (10hrs 5mins)
3. Review progress made this week. (10mins)
4. Read small business blogs. (40mins)
2. Scan my laptop for malware - finish one scan, start scan with second product. (10hrs 5mins)
3. Review progress made this week. (10mins)
4. Read small business blogs. (40mins)
Sunday, May 5, 2013
Today's work on/in the business - Sat 4 May
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (35mins)
3. Accounting. (45mins)
4. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (10mins)
5. Free space on my laptop. (50mins)
6. Invoice reconciliation - 6 paid, 1 started, 1 updated. (55mins)
7. Scan my laptop for malware. (5hrs 40mins)
2. Review progress made this week and ensure the schedule is right for next week. (35mins)
3. Accounting. (45mins)
4. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (10mins)
5. Free space on my laptop. (50mins)
6. Invoice reconciliation - 6 paid, 1 started, 1 updated. (55mins)
7. Scan my laptop for malware. (5hrs 40mins)
Saturday, May 4, 2013
Today's work on/in the business - Fri 3 May
1. Update my record of time worked. (15mins)
2. Working on process for new Events setup - review events. (25mins)
3. Review progress made this week. (1hr)
4. Next changes to software project for new customer - further work after testing. (5hrs 40mins)
5. Read small business blogs. (15mins)
2. Working on process for new Events setup - review events. (25mins)
3. Review progress made this week. (1hr)
4. Next changes to software project for new customer - further work after testing. (5hrs 40mins)
5. Read small business blogs. (15mins)
Friday, May 3, 2013
Today's work on/in the business - Wed 1 May
1. Update my record of time worked. (5mins)
2. Review progress made this week. (35mins)
3. Determine whether we met the KPIs (Key Performance Indicators) for April 2013. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise (although I have been riding more and I'm now doing weights regularly) and we need to work on contacting new prospects too (still). Of course, the online networking KPI was not met, although I have started this process again. (10mins)
4. Invoice reconciliation - one reminder sent out. (10mins)
5. Next changes to software project for new customer - finalise installing design pieces. (6hrs 20mins)
6. Read small business blogs. (30mins)
No work on Thursday - I had a wonderful time out with a group of people taking photos on the Yarra, then had to catch up on the shopping - which used up all the day!
2. Review progress made this week. (35mins)
3. Determine whether we met the KPIs (Key Performance Indicators) for April 2013. Thankfully, we met most of them - the obvious one that failed being my requirement to exercise (although I have been riding more and I'm now doing weights regularly) and we need to work on contacting new prospects too (still). Of course, the online networking KPI was not met, although I have started this process again. (10mins)
4. Invoice reconciliation - one reminder sent out. (10mins)
5. Next changes to software project for new customer - finalise installing design pieces. (6hrs 20mins)
6. Read small business blogs. (30mins)
No work on Thursday - I had a wonderful time out with a group of people taking photos on the Yarra, then had to catch up on the shopping - which used up all the day!
Wednesday, May 1, 2013
Today's work on/in the business - Tues 30 Apr
1. Update my record of time worked. (5mins)
2. Review progress made this week. (35mins)
3. Working on process for new Events setup - review events and enter regular events. (2hrs 15mins)
4. Assist with repairs to the motorbike. (25mins)
5. Next changes to software project for new customer - continuing to install design pieces. (4hrs 10mins)
2. Review progress made this week. (35mins)
3. Working on process for new Events setup - review events and enter regular events. (2hrs 15mins)
4. Assist with repairs to the motorbike. (25mins)
5. Next changes to software project for new customer - continuing to install design pieces. (4hrs 10mins)
Tuesday, April 30, 2013
Today's work on/in the business - Mon 29 Apr
1. Update my record of time worked. (5mins)
2. Review progress made this week. (30mins)
3. Working on process for new Events setup - look into access. (10mins)
4. Next changes to software project for new customer - check design pieces can be installed. (5hrs 55mins)
2. Review progress made this week. (30mins)
3. Working on process for new Events setup - look into access. (10mins)
4. Next changes to software project for new customer - check design pieces can be installed. (5hrs 55mins)
Monday, April 29, 2013
Today's work on/in the business - Sun 28 Apr
1. Read small business blogs. (25mins)
2. Update my record of time worked. (5mins)
3. Review progress made this week. (15mins)
4. Setup to download business emails - still not successful. (15mins)
2. Update my record of time worked. (5mins)
3. Review progress made this week. (15mins)
4. Setup to download business emails - still not successful. (15mins)
Sunday, April 28, 2013
Today's work on/in the business - Sat 27 Apr
1. Update my record of time worked. (10mins)
2. Review progress made this week and ensure the schedule is right for next week. (45mins)
3. Top up mobile broadband. (5mins)
4. Assist with repairs to the motorbike. (25mins)
2. Review progress made this week and ensure the schedule is right for next week. (45mins)
3. Top up mobile broadband. (5mins)
4. Assist with repairs to the motorbike. (25mins)
Saturday, April 27, 2013
Today's work on/in the business - Fri 26 Apr
1. Review progress made this week. (25mins)
2. BAS. (20mins)
3. Accounting. (20mins)
4. Invoice reconciliation - 1 started, 1 updated. (1hr)
5. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
6. Next changes to software project for new customer. (2hrs 30mins)
7. Post BAS form and customer information. (30mins)
8. Read small business blogs. (2hrs 35mins)
2. BAS. (20mins)
3. Accounting. (20mins)
4. Invoice reconciliation - 1 started, 1 updated. (1hr)
5. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (5mins)
6. Next changes to software project for new customer. (2hrs 30mins)
7. Post BAS form and customer information. (30mins)
8. Read small business blogs. (2hrs 35mins)
Thursday, April 25, 2013
Today's work on/in the business - Wed 24 Apr
1. Update my record of time worked. (5mins)
2. Review progress made this week. (35mins)
3. Next changes to software project for new customer. (10mins)
4. Accounting. (20mins)
5. Invoice reconciliation - drafting reminder email. (10mins)
6. Working on process for new Events setup - work on automation of processes. (5hrs 5mins)
7. Read small business blogs. (45mins)
2. Review progress made this week. (35mins)
3. Next changes to software project for new customer. (10mins)
4. Accounting. (20mins)
5. Invoice reconciliation - drafting reminder email. (10mins)
6. Working on process for new Events setup - work on automation of processes. (5hrs 5mins)
7. Read small business blogs. (45mins)
Wednesday, April 24, 2013
Today's work on/in the business - Tues 23 Apr
1. Update my record of time worked. (10mins)
2. Review progress made this week. (35mins)
3. Next changes to software project for new customer. (5hrs 30mins)
4. Invoice reconciliation - working on wording of reminder email. (5mins)
2. Review progress made this week. (35mins)
3. Next changes to software project for new customer. (5hrs 30mins)
4. Invoice reconciliation - working on wording of reminder email. (5mins)
Tuesday, April 23, 2013
Today's work on/in the business - Mon 22 Apr
1. Update my record of time worked. (5mins)
2. Review progress made this week. (25mins)
3. Work on website changes requested - finalise and test two new forms. (2hrs 10mins)
4. Invoice reconciliation - 1 finalised, 1 updated and sent out, 1 sent out. (2hrs)
5. Accounting. (50mins)
6. Free space on my laptop. (20mins)
2. Review progress made this week. (25mins)
3. Work on website changes requested - finalise and test two new forms. (2hrs 10mins)
4. Invoice reconciliation - 1 finalised, 1 updated and sent out, 1 sent out. (2hrs)
5. Accounting. (50mins)
6. Free space on my laptop. (20mins)
Monday, April 22, 2013
Today's work on/in the business - Sat 20 Apr
1. Update my record of time worked. (10mins)
2. Review progress made this week and ensure the schedule is right for next week. (45mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (10mins)
4. Free space on my laptop. (3hrs)
2. Review progress made this week and ensure the schedule is right for next week. (45mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (10mins)
4. Free space on my laptop. (3hrs)
Saturday, April 20, 2013
Today's work on/in the business - Fri 19 Apr
1. Update my record of time worked. (5mins)
2. Review progress made this week. (25mins)
3. Invoice reconciliation - 1 created and sent out. (5mins)
4. Accounting. (45mins)
5. Start next changes to software project for new customer. (4hrs)
6. Website customer reported an issue - testing and correspondence. (20mins)
7. Read small business blogs. (1hr 35mins)
2. Review progress made this week. (25mins)
3. Invoice reconciliation - 1 created and sent out. (5mins)
4. Accounting. (45mins)
5. Start next changes to software project for new customer. (4hrs)
6. Website customer reported an issue - testing and correspondence. (20mins)
7. Read small business blogs. (1hr 35mins)
Friday, April 19, 2013
Today's work on/in the business - Thurs 18 Apr
1. Update my record of time worked. (10mins)
2. Review progress made this week. (45mins)
3. Work on website changes requested - last changes to two new forms. (15mins)
What a brilliant day - spent the morning and early afternoon in the city with a group of artists, doing a bit of drawing. Then I got home in time for another friend to drop round on her way to another friend's exhibition opening - so I got to go with her to that as well!
2. Review progress made this week. (45mins)
3. Work on website changes requested - last changes to two new forms. (15mins)
What a brilliant day - spent the morning and early afternoon in the city with a group of artists, doing a bit of drawing. Then I got home in time for another friend to drop round on her way to another friend's exhibition opening - so I got to go with her to that as well!
Thursday, April 18, 2013
Today's work on/in the business - Wed 17 Apr
1. Update my record of time worked. (5mins)
2. Review progress made this week. (50mins)
3. Working on process for new Events setup - discussion re old information. (5mins)
4. Quote on next changes to software project for new customer. (35mins)
5. Work on website changes requested - fix issues with two new forms. (30mins)
6. Sign and send insurance documentation. (5mins)
7. Scan my laptop for malware. (7hrs 35mins)
8. Free space on my laptop. (10mins)
2. Review progress made this week. (50mins)
3. Working on process for new Events setup - discussion re old information. (5mins)
4. Quote on next changes to software project for new customer. (35mins)
5. Work on website changes requested - fix issues with two new forms. (30mins)
6. Sign and send insurance documentation. (5mins)
7. Scan my laptop for malware. (7hrs 35mins)
8. Free space on my laptop. (10mins)
Wednesday, April 17, 2013
Today's work on/in the business - Tues 16 Apr
1. Update my record of time worked. (10mins)
2. Review progress made this week. (25mins)
3. Preparation for meeting on software project for new customer and meeting, including travel. (4hrs 50mins)
4. Invoice reconciliation - 5 updated. (1hr 45mins)
5. Print insurance documentation. (10mins)
2. Review progress made this week. (25mins)
3. Preparation for meeting on software project for new customer and meeting, including travel. (4hrs 50mins)
4. Invoice reconciliation - 5 updated. (1hr 45mins)
5. Print insurance documentation. (10mins)
Tuesday, April 16, 2013
Today's work on/in the business - Mon 15 Apr
1. Update my record of time worked. (10mins)
2. Review progress made this week. (20mins)
3. Review test results for software project for new customer. (15mins)
4. Work on website changes requested - setup second of the two new forms. (6hrs)
5. Working on process for new Events setup - website changes. (10mins)
2. Review progress made this week. (20mins)
3. Review test results for software project for new customer. (15mins)
4. Work on website changes requested - setup second of the two new forms. (6hrs)
5. Working on process for new Events setup - website changes. (10mins)
Monday, April 15, 2013
Today's work on/in the business - Sun 14 Apr
1. Update my record of time worked. (5mins)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (10mins)
4. Setup to download business emails - still not successful. (30mins)
5. Accounting. (20mins)
6. Invoice reconciliation - 3 updated, 2 started. (30mins)
7. Assist with support for new website customer. (40mins)
8. Anti virus scan on my laptop. (3hrs)
2. Review progress made this week and ensure the schedule is right for next week. (20mins)
3. Review the project schedules, adjusted all projects based on actual progress and added 1 week to software schedules. (10mins)
4. Setup to download business emails - still not successful. (30mins)
5. Accounting. (20mins)
6. Invoice reconciliation - 3 updated, 2 started. (30mins)
7. Assist with support for new website customer. (40mins)
8. Anti virus scan on my laptop. (3hrs)